April 25, 1997
i
Mr. S. A. Patuiski
Site Vice President
Point Beach Nuclear Plant
6610 Nuclear Road
{
Two Rivers, WI 54241
1
i
SUBJECT:
NRC INSPECTION REPORT 50-266/97002(DRS); 50-301/97002(DRS)
Dear Mr. Patuiski:
On March 4,1997, the NRC completed an inspection at your Point Beach Nuclear Plant,
Unit 2, including an inspection at your corporate engineering offices. The focus of this
j
inspection was on assumptions used in the containment fan cooler operability evaluation.
.
At the conclusion of the inspection, the findings were discussed with those members of
)
'
your staff identified in the enclosed report.
'
During this inspection, the inspector noted discrepancies between the initial assumptions
i
!
used in the containment fan cooler operability evaluation, and those used in Technical
Specification Change Request (TSCR) 192. However, of more concern, was not
i
considering the throttled service water valves in determining the effect of the delayed
I
containment spray and containment fan cooler start times and the lack of an original
design basis calculation to support the bases for Technical Specification 15.3.6.B. Within
45 days, please provide the formal calculations quantifying the delayed start times for the
containment spray pumps and containment fan cooler assumed in the containment
integrity evaluation supporting TSCR 192.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter -
and the enclosed inspection report will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
i
/s/ J. A. Grobe
John A. Grobe, Deputy Director
- ]00035
Division of Reactor Projects
,
I
Docket Nos. 50-266, 50-301
/
Enclosure: Inspection Report 50-266/301/97002(DRS)
!
See Attached Distribution
,
i
SEE ATTACHED CONCURRENCES
l
DOCUMENT NAME: G:\\DRS\\ pol 97002.REV
{
To receive a copy of this document. Indicate in the box *C' = Copy w/o attach /enot T = Copy w/ attach /enci *N* = No copy
i
OFFICE
Rill:DRS
l
Rill:DRS
l
Rill:DRP
l
Rill;DQP a l
'
NAME
O'Dwyer/kjc
Ring
Mc-Barger
GrabgtMGT
DATE
04/
/97
04/
/97
04/
/97
04 pts /97
OFFICIAL RECOR D COPY
llll! ln
I H I I
I
I ill ll
l l
l l ll
11
9705010046 970425
'
ll
ll
ADOCK 05000266.
- * **** * *
G
_ _ _
- _
_ _ _
.
_ _
.
__
.
. _ - . .
- - ..
-.
. - - -
-
.
_
~ . - - -
.-
-. . . . _
-
i
.
l
!
,
i
l
t
l
Mr. S. A. Patutski
l
Site Vice President
l
Point Beach Nuclear Plant
6610 Nuclear Road
[
Two Rivers, WI 54241
l
l
SUBJECT:
NRC INSPECTION REPORT 50-266/97002(DRS); 50-301/97002(DRS)
Dear Mr. Patuiski:
l
On March 4,1997, the NRC cnmpleted an inspection at your Point Beach Nuclear Plant,
!
'
Unit 2, including an inspection at your corporate engineering offices. The focus of this
j
'
inspection was on assumptions used in the containment fan cooler operability evaluation.
At the conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed report.
l
During this inspection, the inspector noted discrepancies between the initial assumptions
!
used in the containment fan cooler operability evaluation, and those used in Technical
Specification Change Request 192. However, of more concern, was the use of an
informal calculation to support the delayed containment spray and containment fan cooler
start times and the lack of a design basis calculation to support the bases for Technical
j
l
Specification 15.3.6.B.
,
I
I
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter
,
'
and the enclosed inspection report will be placed in the NRC Public Document Room.
i
We will gladly discuss any questions you have concerning this inspection.
i
!
Sincerely,
!
l
l
John A. Grobe, Deputy Director
l
Division of Reactor Projects
l
Docket Nos. 50-266, 50-301
'
Enclosure: Inspection Report 50-266/301/97002(DRS)
See Attached Distribution
<
DOCUMENT NAME: G:\\DRS\\ pol 97002.REV
To receive a copy of thle document, Indicate in the box "C" = Copy w/o attach / encl T = copy w/ attach /enci"N" = No copy
OFFICE
Rlll:DRS
lE.
Rill:DRS_
lc.
Rill:DRP
lg
Rlll:DRP
l
NAME
O'Dwyer/kjc A
Ring MF
Mc-Bargerfi4 k fo
Grobe
DATE
04/W/97
04/ g/97
04/g /97
04/
/97
,
OFFICIAL RECORD COPY
l
r
-
.
I
!
S. A. Patuiski
2
April 25, 1997
l
l
l
I
l
cc w/ encl:
R. R. Grigg, President and
l
Chief Operating Officer, WEPCo
I
A. J. Cayia, Plant Manager
Virgil Kanable, Chief, Boiler Section
Cheryl L. Parrino, Chairman,
Wisconsin Public Service Commission
State Liaison Officer
!
Distribution:
Docket File w/ encl
Rlli PRR w/enct
Rlll Enf. Coordinator w/encI
['"PUBLIC IE-01;w/enci .,
SRI, Pt. Beach w/enci
TSS w/enci
OC/LFDCB w/ encl
LPM, NRR w/ encl