Requests Addl Info Re 851125 Commitments Concerning Module 8, Structural Steel, to Continue Readiness Review.Written Response & Telcon Requested to Meet Schedule Requirements. Comments on Acceptable Commitments Also Provided
ML20138C439
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/27/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
References
NUDOCS 8604020496
Download: ML20138C439 (8)


Text

Fo 6

J M T % Cepf l/AR 2 7 1986 Georgia Power Company

/ ATTN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

V0GTLE READINESS REVIEW - INTERIM REVIEW QUESTIONS - MODULE NO. 8

" STRUCTURAL STEEL" We have completed an initial review of the subject module which you submitted to us on November 25, 1985, for evaluation.

As a result of this initial review, the following additional questions and comments have been generated which need clarification and a written response.

Comments are also provided for commitments determined to be acceptable.

Commitments Requiring Clarification or Correction 1.

Commitment 1854.

Nondestructive examination of primary containment liner welds.

A.

The applicant has chosen to substitute:

1) surface examination for volumetric examination of the liner welds, 2) checking of the bubble test solution every four hours rather than hourly, and 3)

ASME Section III Subsection NE 5320, " Radiographic Acceptance Standard", and NE 5320, " Liquid Penetrant Acceptance Standards" in lieu of radiography, ultrasonic and magnetic particle testing.

B.

The applicant has not provided the rationale for the use of penetrant testing in lieu of magnetic particle or volumetric examination.

l 2.

Commitment 1558.

Regulatory Guide 1.71, Welder qualification for areas of limited accessibility The applicant has not included this guide in Module 8.

A rationale should be provided.

3.

Commitment 1101.

Conformance of materials and fabrication of containment reactor -liner plate, thickened liner plate liner and embeds at el.169 with ASME Section III, Division I;Section V; Section VIII, Division I;Section IX 1971 thru 1973 Summer addenda.

The licensee is in conformance with the ASME 1974 Code through the Summer 1975 addenda,'rather than 1971 edition through 1973 Summer addenda.

The commitment matrix should be revised to reflect the actual docketed commitment.

8604020496 860327 PDR ADOCK 05000424 I (

A

-dro/

O o

a,nd 4 t 1986 Georgia Power Company 2

4.

Commitment 1968.

Conformance of nondestructive examination of containment liner plate welds to Regulatory Guide 1.19.

The licensee does not conform with Regulatory Guide 1.19 because of substitution of liquid penetration for magnetic particle inspection or volumetric inspection.

See item 1. above.

5.

Commitment 1970.

Conformance of Charpy V notch testing of containment thickened liner plate with ASTM A593-72.

A search of ASTM specifications led us to the conclusion that ASTM A593-72 does not exist. The intended specification should be clarified.

6.

Commitment 1971.

Conformance of containment penetration sleeves to Charpy V notch testing to same as referred to in FSAR 3.8.1.6.4.8.

There is'no 3.8.1.6.4.8.

There is, however, a 3.8.1.6.4 B which requires impact testing to the ASME Section III Division Subarticle NE 2320.

The commitment-is acceptable provided the typographical error is corrected.

7.

Commitment 1149.

Conformance of materials of containment. internal structure and exposed mechanical fastener in refueling canal to corrosion resistant stainless steel ASTM A240 Type 304 L or equivalent.

The equivalent to 304 L should be specified.

The use of 304 L as a fastener material would be an unusual material.

I&E should verify actual bolting used since FSAR 3.8.3.6.1 vaguely indicates that an equivalent to 304 L has been used.

8.

Commitment 2806.

Conformance of fracture toughness testing of penetration sleeve assemblies to ASME III Division I Subsection NE 1971 Edition thru Summer 73 Addenda.

Penetration sleeves in the containment basement are in conformance with ASME Section III Division.I Subsection NE 1971 Edition through Summer 71 Addenda:

sleeves for electrical penetrations are to the 1971 Edition Summer 75 Addenda.

The commitment matrix should be revised to reflect the actual docketed commitment.

9.

Commitment 1830.

Conformance of_ welding of ' containment penetrations sleeve to flued head (or immediate* [ sic] sleeve for flued heads equipped with intermediate sleeve) with ASME Section III Subsection NE Class MC.

Containment penetrations sleeve to flued head (or intermediate sleeves for flued heads equipped with intermediate sleeves) are welded in accordance with ASME Section III Subsection NE Class MC which calls for 100%

radiography.

Also, IEB 80-80 should be revised to read IEB 80-08.

  • "immediate" is probably a typo for intermediate".

MAR 2 7 1986 Georgia Power Company 3

Acceptable Commitments 10.

Commitment 1855.

Regulatory Guide 1.31, Control of Ferritic Content in Stainless Steel Weld Metal.

The applicant is in general compliance with most of the guidelines set forth in Regulatory Guide 1.31.

11.

Commitment 1570.

Regulatory Guide 1.85, Materials Code Case Acceptability.

The applicant is in conformance with this guide.

12.

Commitment 1572.

Regulatory Guide 1.85 Materials Code Case A:ceptability.

The licensee is in compliance with this guide.

13.

Commitment 811.

Conformance with 10 CFR 50 Appendix A GDC 51.

The licensee is in compliance with GDC 51.

14.

Commitment 1102.

Conformance of materials and fabrication of the 1/4" basemat liner plates, cylinder and wall dome lines plate, support brackets and integral penetrations to ASME Section III Division I Subsection NE,Section V; Section VIII Division I; and Section IX 1974 thru Summer 1975 Addenda.

The licensee conforms with the above.

15.

Commitment 1954.

Conformance of containment anchor Nelson Studs type H 4 with ASTM A108.

-Nelson concrete anchor studs conform to ASTM A108 (FSAR 3.8.1.6.5.0) 16.

Commitment 1955.

Conformance of containment liner unistruts with ASTM A570 Grade C.

Containment anchor unistruts conform to ASTM A570 Grade C (FSAR 3.8.1.6.5 F).

17.

Commitment 1956.

Conformance of containment liner heavy hex nuts for high strength bolts to ASTM high Grade 2 H.

Containment liner heavy hey nuts for high strength bolts conform to ASTH A194 Grade 2 H (FSAR 3.8.1.6.5 G) 18.

Commitment 1957.

Conformance of containment liner hardened washers to ASTM A325 Rockwell C 38 hardness.

Containment liner hardened washers conform to ASTM Rockwell C38 hardness (FSAR 3.8.1.6.5 H).

MAR 2 7 1986 Georgia Power Company 4

t t

i 19.

Commitment 1958.

Conformance of containment liner long hey couplings to ASTM A307 Grade A or ASTM A 36.

Containment liner long hex couplings conform to ASTM A307 Grade A or ASTM

~

A36 (FSAR 3.8.1.6.5 H).

20.

Commitment 1959.

Con! 'mance of containment liner leak chase test couplings to ASME SA234.

Containment liner leak chase test couplings conform to ASME SA234 (FSAR 3.8.1.6.5).

21.

Commitment 1960.

Conformance of containment structural steel to ASTM A36.

Containment structural steel, such as liner plate angle, flat bar, and channel. stiffeners; support brackets not penetrating liner plate; framing backing and tie rods; embedded floor beams; backing strips and leak chase system channel and angles all conform to ASTM A36 (FSAR 3.8.1.6.6 A).

22.

Commitment 1969.

Conformance of ultrasonic inspection of containment thickened liner plate to ASME SA-435.

Containment thickened liner plate is ultrasonically inspected to ASME SA-435 because the plate is procured to SA 516 grade 70 thru reference to ASME SA 20 which requires'ASME SA-435 for ultrasonic testing.

23.

Commitment 1973.

Conformance of ultrasonic testing of floor plates greater than 1/4 inch.

All liner plates greater than 1/4 inch thick are ultrasonically tested in conformance with ASME SA 435.

24. Commitment 1992.

.Conformance of the QC program for shop and field welds to ASME Code Articles NE 4000 and 5000 and NC 4000 and 5000.

1 The QC program conforms to ASME Code Articles NE 4000 and 5000 and NC 4000 and 5000.

25.

Commitment 1152.

Conformance of refueling canal liner plate to ASTM A240 type 304 L.

Refueling canal liner plate conforms to ASTM A 240 type 304 L.

26.

Commitment 1156.

Conformance of containment internal structural steel to A36.

Containment internal structural steel conforms to A36 (FSAR 3.8.3.6.1.I).

1 27.

Commitment 1157.

Conformance of containment internal structural column or beam connections to A325 or A490.

--w----n-,--~,.

,,-----,m u----e.-,..-m..,

y

,-~, -+,,....---,

,--n

l&R 2 7 1986 Georgia Power Company 5

Containment internal structural column or beam connection conform to A325 or A490.

28.

Commitment 1158.

Conformance of containment internal column anchor bolts with A36 or A193.

Containment internal column anchor bolts conform to A36 or A193.

29.

Commitment 4694.

Conformance at NSSS embedded stems to SA537 Class 1 (NB:

" stems" is a typo for " items").

NSSS embedded items above the basement level conform to SA537 Class 1 (FSAR 3.8.3.6.1 D).

30.

Commitment 2034.

Conformance of ESF materials to Regulatory Guide 1.31.

The licensee is in general compliance with the guidelines set forth in Regulatory Guide 1.31.

31.

Commitment 2077.

Conformance of fracture prevention of containment pressure boundary with 10 CFR 50 Appendix A GDC 51.

Containment pressure boundary conforms to 10 CFR 50 Appendix A GDC 51 (FSAR 6.2.7).

32.

Commitment 1339.

Conformance of fracture prevention of containment pressure boundary with 10 CFR 50 Appendix GDC 51.

Ccntainment pressure boundary conforms to 10 CFR 50 Appendix A GDC 16 (FSAR 6.2.7 B).

23.

Commitment 2078.

Conformance of thickened liner plate up to elevation 169 ft 0 in. with fracture toughness requirements of ASME Section III Division I Subsection Nr Art :le 2320 1971 Edition through Summer 73 addenda.

. Thickened liner plate up to the basement liner plate at elevation 169 conforms to the ASME 1971 edition through Summer 73 addenda.

34.

Commitment 2079.

Conformance of thickened liner plate above elevation 169 ft 0 in, with fracture toughness requirements of ASME Section III Division I Subsection NE article 2720 of.the 1974 edition through the Summer 1975 addenda.

Thickened liner plate above 169 ft. O in. elevation conforms to the 1974 edition through Summer 75 addenda.

35.

Commitment 2080.

Conformance of penetration sleeve assemblies to SA 516 Grade 70 plates.

Sleeve assemblies are fabricated from SA 516 Grade 70 plates.

.mn-,,,

.-...,,.+-

~-

-y

.... _. -. - ~

~

yfp 2 *l Ol6 Georgia Power Company 6

36.

Commitment 2081.

Conformance penetration sleeve assemblies to SA 105 forgings.

Penetrations sleeve assemblies conform to SA 105 forgings.

37.

Commitment 2082.

Conformance of fracture toughness tests of containment.

shell penetrations sleeve assemblies with requirements of ASME Section III Division I Subsection NE 1974 Edition through Summer 1975 addenda.

. Containment shell penetration fracture toughness testings of sleeves conforms to the requirements of the 1974 Edition through 1975 addenda.

38.

Commitment 2083.

Conformance of fracture toughness testing of equipment hatch, personnel lock and escape lock to the requirements of ASTM Section

~III Division I Subsection NE 1974 edition through Summer 1975 addenda.

Fracture toughness testing of equipment hatch, personnel lock and escape lock conform to the requirements of 1974 edition through 75 addenda.

39.

Commitment 1826.

Conformance of fabrication and inspection of flued head penetration to ASME Section III 1977 edition through Summer 1978 addenda.

Fabrication and inspection of flued head penetrations conform to ASME Section III 1977 edition through Summer -1978 Addenda.

40.

Commitment 1827.

Conformance of installation of containment flued head penetrations to ASME Section III 1977 edition through Winter 77 addenda.

Installation of containment flued head penetrations conforms to ASME 1977 edition through Winter 1977 addenda.

41.

Commitment 1828.

Conformance of containment flued head to sleeve weld (for penetrations with intermediate sleeves) to ASME Subsection NC 5200 and 5320 foi' radiography and acceptance.

Containment flued head to sleeve welds are 100 percent radiographed in the vendor's shop to ASME subsection NC 5:00 and 5320 for radiography and acceptance.

Please review these comments and questions and provide a written response.

Your input is requested to be received as soon as possible due to current NRC review schedule objectives.

In view of these review schedule requirements, we also request a telecon for clarification and explanation of these questions as soon as you are prepared to respond.

Please coordinate this telecen with W. H. Rankin (404-331-4197) of my staff.

i 4

4

MAR 2 7 1986 Georgia Power Company 7

Your assistance in responding to this request for additional information is appreciated.

Sincerely, Y

Roger D. Walker,' Director Division.of Reactor Projects cc:

E. Conway, Senior Vice President d.&ProjectDirector O. Foster, Vice President, Project Support c#. D. Rice, Vice President, Project Engineering

f. H. Pinson, Vice President, Project
d. Construction T. Beckham, Vice President &

d.GeneralManager-Operations A. Thomas, Vice President, Licensing f.W. Hayes,VogtleQuality Assurance Manager vs.C.Ramsey, Manager-Readiness Review

. B. Bockhold, General Manager, d.NuclearOperations Gucwa, Manager, Nuclear Safety and Licensing b

./. H. Googe, Project J.Constructio.: Manager D. Groover, Quality Assurance Site Manager -

Construction v0. A. Bailey, Project Licensing Manager M.F.Trowbridge,Esq.,Shaw,

, Pittman, Potts and Trowbridge v8. W. Churchill, Esq., Shaw, Pittman, Potts and Trowbridge

d. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge J. E. Joiner, Troutman, Sanders, tl.LockermanandAshmore G. Ledbetter, Commissioner, Department of Human Resources cc:

(Continued see page 8)

~ Georgia Power Company 8

,fontinued cc:

VC. H. Badger, Office of Planning f and Budget VD. Kirkland, III, Counsel, Office of the Consumer's Utility

/ Council VD. C. Teper, Georgians Against VT.NuclearEnergy Johnson, Executive Director, Educational Campaign for a Prosperous Georgia vA. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board idr.anel P

O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel lt/G. A. Lineaberger, Jr., Administrative Judge Atomic Safety and Licensing

/ oard Panel B

v8. P. Garde, Citizens -Clinic, Director Government Accountability Project bec.

. Reis, ELD Yp' M. ' Hill, IE W

Miller,-NRR A. Brach, EDO M. Sinkule, RII W. Rankin, RII J. Blake, RII G. Hallstrom, RII

_f.Herdt,RII VNRC Resident Inspector Document Control Desk State of Georgia.

4 RII RII RII

~

WHRankin:1b MSinkule VLBr wnlee RWalker 03W86 03/p/86 03/>V /86 03///86

-n

+

y.

.y...-._..

or..,

._w

~

_,..__m

- -,,,..