ML20138B876

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/85-26 & 50-529/85-27 on 850801-0908 & Notice of Violation
ML20138B876
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/04/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20138B882 List:
References
NUDOCS 8510220063
Download: ML20138B876 (2)


See also: IR 05000528/1985026

Text

-

-

-

-

'^

I

f/

.

dN

s

DCT 041985

Docket Nos. 50-528

50-529

Arizona Nuclear Power Project

P. O. Box 52034

Phoenix, Arizona 85072-2034

Attention:

Mr. E. E. Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject: NRC Inspection of Palo Verde Units 1 and 2.

This refers to the inspection conducted by Messrs. R. Zimmerman, C. Bosted,

and G. Fiorelli of this office on August I through September 8, 1985 of

activities authorized by NRC License No. NPF-41 and NRC Construction Permit

Number CPPR 142 and to the discussion of our findings held with yourself and

other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

-Your response to this Notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

851022OO6G 851(X14

PDR

ADOCK 05000528

,

G

PDR

$

-

.

.-

,

-

,,.

..

,

.

_ . . -

.

.

.-

, ,.

.

.

, ,1,-

<

.e

4

s

,

v

,,i*

,

. -

1

,;; ;

~

,

.;

y ,.

.

?-

<

.

c

0CT 0 41985

'

'

'

-

-

l

Arizona Public. Service Co.

-21

1

The iesponse directed by this letter and the accompanying Notice are not

'

subject to -the clearance procedure of the Office of' Management and Budget as

required by.the Paperwork Reduction Act of 1980, PL 96-511.

Should you have'any questions concerning this inspection, we will be pleased

to discuss them with you.

>

Sincerely, orignet n . . : :,y

D. F. Kirs;h

i

D. F. Kirsch, Acting Director,

Division of Reactor Safety and Projects

Enclosure:

j

-Inspection Report-

Nos. 50-528/85-26

50-529/85-27

i

cc w/ enclosure:

J. R. Bynum, PVNGS Plant Manager

S. R. Frost, Supervisor, Nuclear Operations Licensing, Sta. 40804

T. D. Shriver, Manager, Quality Systems & Engineering

W. E. Ide, Manager, Corporate QA/QC

C. N. Russo, Manager, QA Audits / Monitoring

Ms. J. Morrison

Ms. L. Bernabei, GAP

i

Arthur C. Gehr, Esq.

D. Railsback, Arizona Corporation Commission

,

j

bec: RSB/ Document Control Desk (RIDS)

Mr. J. Martin

!

. Mr. B. Faulkenberry

i

G. Cook

Resident Inspector

i

i

i

4

RV 'l}[k

_

w.

5

HA.$- )

l-11

h

'

'

RZid 'rman:dh

CBosted

GFioyelli

LNiller

AJohnson

A aff'ee

e

.

!

9/1 /85

9/ ti /85

9/2,5 /85

9/({ /85 4/[ /85

g/ y /85

fW\\

QM.Oj

X

, '

'

/c '

GYu

MSchuster

DKifich

,

[

9/f /85

l

g]/

9

/85'

/ p /85

/

/

3

I

(

.

g

T

'

f

,4

'

.u.

.

<

-

-

.