ENCLOSURE 1 TO NLS-85-403 j.
j i
PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-1 i
l RCS LEAKAGE DETECTION (85TSB26) 4 l
1 l
I 9603200057 B60317 ADOCK 0 % y4 DR i
BRUNSWICK-1
SUMMARY
LIST OF REVISIONS PAGE NO.
DESCRIPTION 3/44-5 Delete Instrument Tag Numbers G16-FY-K602 and G16-FY-K600 from TS 4.4.3.1.b.
3/44-6 Delete Instrument Tag Numbers G16-FY-K602 and G16-FY-K600 from TS 4.4.3.2.a.
w
(BSEP-1-78)
REACTOR COOLANT SYSTEM 3/4.4.3 REACTOR COOLANT SYSTEM LEAKACE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.3.1 The following reactor coolant gystem leakage detection systems shall l
be OPERABLE:
a.
The primary containment atmosphere particulate radioactivity monitoring system,*
b.
The primary containment sump flow integrating system, and c.
The primary containment gaseous radioactivity monitoring system.*
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With only two of the above required leakage detection systems OPERABLE, operation may continue for up to 31 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required gaseous and/or particulate radioactive monitoring system is inoperable; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.3.1 The reactor coolant system leakage detection systems shall be demonstrated OPERABLE by:
a.
Primary containment atmosphere particulate and gaseous radioactivity monitoring systems performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 31 days, and a CHANNEL CALIBRATION at least once per 18 months.
(CAC-AQH-1260-1,2,3; CAC-AQH-1262-1,2,3; CAC-AQH-1261-1,2,3) b.
Containment sump flow integrating systems performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and of a CHANNEL CALIBRATION at least once per 18 months.
(C16-FQ-K603; C16-FYQ-K603:
C16-FQ-K601; C16-FYQ-K601; C16-FT-N013; C16-FT-N003) s
I BRUNSWICK - UNIT 1 3/4 4-5 Amencment No.
.. w.
.i
(BSEP-1-78)
REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.3.2 Reactor coolant system leakage shall be limited to:
a.
b.
5 gpm UNIDENTIFIED LEAKAGE averaged over any 24-hour period.
25 gpm total leakage averaged over any 24-hour period.
c.
d.
2 gpm increase in UNIDENTIFIED LEAKAGE within any 24-hour period except for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of reactor startup commencing with entry into OPERATIONAL CONDITION 2.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
a.
With any PRESSURE BOUNDARY LEAKAGE, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
With any reactor coolant system leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKACE, reduce the leakage rate to within the limits within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.3.2 The reactor coolant system leakage shall be demonstrated to be within each of the above limits by:
Monitoring the drywell and equipment drain sump flow rates at least a.
once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and (G16-FQ-K603; C16-FYQ-K603; C16-FQ-K601; C16-FYQ-K601; C16-FT-N013; C16-FT-N003).
b.
Monitoring the primary containment atmosphere particulate and gaseous radioactivity at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(CAC-AQH-1260-1,2,3; CAC-AQH-1262-1,2,3 and CAC-AQH-1261-1,2,3).
BRUNSWICK - UNIT 1 3/4 4-6 Amendment No.
< ' ~ - ~ * - ~
~ ~ 354
l ENCLOSURE 2 TO NLS-85-403 PROPOSED TECHNICAL SPECIFICATION PAGES BRUNSWICK-2 RCS LEAKAGE DETECTION (85TSB26) i
BRUNSWICK-2
SUMMARY
LIST OF REVISIONS PAGE NO.
DESCRIPTION 3/44-5 Delete Instrument Tag Numbers G16-FY-K602 and G16-FY-K600 from TS 4.4.3.1.b.
3/44-6 Delete Instrument Tag Numbers G16-FY-K602 and G16-FY-K600 from TS 4.4.3.2.a.
l
(BSEP-2-78)
REACTOR COOLANT SYSTEM 3/4.4.3 REACTOR COOLANT SYSTEM LEAKAGE LEAKACE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.3.1 The following reactor coolant system leakage detection systems shall be OPERABLE:
The primary containment atmosphere particulate radioactivity a.
monitoring system,*
b.
The primary containment sump flow integrating system, and c.
The primary containment gaseous radioactivity monitoring system.*
' APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With only two of the above required leakage detection systems OPERABLE, operation may continue for up to 31 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required gaseous and/or particulate radioactive monitoring system is inoperable; otherwise, be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.3.1 The reactor coolant system leakage detection systems shall be demonstrated OPERABLE by:
a.
Primary containment atmosphere particulate and gaseous radioactivity monitoring systems performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 31 days, and a CHANNEL CALIBRATION at least once per 18 months.
(CAC-AQH-1260-1,2,3; CAC-AQH-1262-1,2,3; CAC-AQH-1261-1,2,3) b.
Containment sump flow integrating systems performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days and of a CHANNEL CALIBRATION at least once per 18 months.
(C16-FQ-K603; C16-FYQ-K603; C16-FQ-K601; C16-FYQ-K601; C16-FT-N013; C16-FT-N003)
BRUNSWICK - UNIT 2 3/4 4-5 Amendment No.
(BSEP-2-78)
REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.3.2 Reactor coolant system leakage shall be limited to:
a.
No PRESSURE BOUNDARY LEAKACE.
b.
5 gpm UNIDENTIFIED LEAKAGE averaged over any 24-hour period.
25 gpm total leakage averaged over any 24-hour period.
c.
d.
2 gpm increase in UNIDENTIFIED LEAKAGE within any 24-hour period except for the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of reactor startup commencing with entry into OPERATIONAL CONDITION 2.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
a.
With any PRESSURE BOUNDARY LEAKACE, be in at least HOT SHUTDOWN 1
within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
9 b.
With any reactor coolant system Leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKACE, reduce the leakage rate to within the limits within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the i
following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
1
.4 i
SURVEILLANCE REQUIREMENTS 4.4.3.2 The reactor coolant system leakage shall be demonstrated to be within each of the above limits by:
a.
Monitoring the drywell and equipment drain sump flow rates at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and (C16-FQ-K603; C16-FYQ-K603; C16-FQ-K601; C16-FYQ-K601; C16-FT-N013; C16-FT-N003).
b.
Monitoring the primary containment atmosphere particulate and gaseous radioactivity at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
(CAC-AQH-1260-1,2,3; CAC-AQH-1262-1,2,3 and CAC-AQH-1261-1,2,3).
i a
BRUNSWICK - UNIT 2 3/4 4-6 Amendment No.