ML20138A385
| ML20138A385 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/27/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20138A391 | List: |
| References | |
| NUDOCS 8510080543 | |
| Download: ML20138A385 (1) | |
See also: IR 05000413/1985040
Text
._-
.
. - - - -
. - -
. - - _ _ -
. - _ _
-
_
.
-
_
. EP 2 7 1985
S
Juke Power Company
V ATTN: Mr. H. B. Tucker, Vice President
'
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT: REPORT NOS. 50-413/85-40 AND 50-414/85-38
On September 9-13, 1985, NRC inspected activities authorized by NRC Operating
License No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba
facility.
At the conclusion of the inspection, the findings were discussed with
those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Y1*GMrt wtus f.oA.
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report Nos. 50-413/85-40
and 50-414/85-38
J:c w/ encl:
'R,
L. Dick, Vice President - Construction
4. W. Hampton, Station Manager
)cc w/ encl:
/G. Johnson, ELD
0510000543 050
33
4. N. Jabbour, NRR
PDH
ADOCK O
Document Control Desk
G
State of South Carolina
M C Resi e
nspector.-
O
R L
-
Ri l.
gy/
R"
'
J
1ake
AR erdt
einso
-
g4/85
9/ g /85
/85
,fi .c E0l