Forwards Latest Status of Responses to NRC Questions on Stiff Clamps.Nrc Review of Rept,Transmitted by & Previous Responses to Questions & Preparation of SER Section for Stiff Clamps Requested
ML20137M685
Person / Time
Site: Satsop
Issue date: 09/05/1985
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Knighton G
Office of Nuclear Reactor Regulation
References
GO3-83-501, NUDOCS 8509130300
Download: ML20137M685 (3)


Text

n Washington Public Power Supply System Box 1223 Elma, Washington 98541-1223 (2061482 4428 September 5, 1985 G03-85-501 Docket No. 50-508 1

Director of Nuclear Reactor Regulation Attention: Mr. G. W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

NUCLEAR PROJECT 3 RESOLUTION OF KEY LICENSING ISSUES STIFF CLAMPS

References:

1)

Letter (G03-85-418),

G.

C.

Sorensen to G.

W.

Knighton, same subject, dated July 31, 1985.

2)

Letter (G03-85-347),

G.

C.

Sorensen to G.

W.

Knighton, same subject, dated June 20, 1985.

Attached is the latest status of the responses to all of your questions on the stiff clamps.

This is an update to Attachment 1 of the Reference 1 letter.

In Reference 1, the Supply System discussed the desirability of presenting the Summary Evaluation Report to the NRC formally and in person.

As indicated in Reference 2, it is our belief that resolution of this issue will benefit both the Supply System and NRC by documenting the extensive efforts expended by both organizations.

For the Supply System, it would allow for final settlement of commercial issues and reduce the uncertainties regarding the estimate to complete WNP-3.

Thus all parties have much to gain if the work done to-date can be completed and formally documented.

Therefore, the Supply System again requests that the NRC review the report transmitted by Reference 1 as well as previous responses to the Staff questions and prepare a Safety Evaluation Report (SER) section for stiff clamps.

Should the NRC agree to perform the review and prepare a SER section, a meeting with the appropriate NRC Staff reviewers will allow our personnel to respond directly to any questions that may arise from the review of the Sunenary Evaluation Report.

8509130300 850905 PDR ADOCK 05000508 p#

A PDR

)

I r

4 Docket No. 50-508 Director of Nuclear Reactor Regulation G03-85-501 Page 2 September 5, 1985 i

Toward this end, we would be pleased to discuss a date and time at which we could, in person, present to you the Sumary Evaluation Report and answer any questions regarding this report.

The Supply System point of contact regarding this matter is Mr.

D.

W.

2 Coleman, WNP-3 Licensing Project Manager, phone (206) 482-4428, Ext. 5436.

/

M G. C. So'rensen, Manager Regulatory Programs (280)

M(H/cae

Attachment:

Status of Responses to Questions on Stiff Clamps cc: Mr. J. A. Adams, NESCO Mr. R. M. Boucher, Pacific Power & Light Company Mr. W. L. Bryan, Washington Water Power Company Mr. J. Crnich, Ebasco, Elma Ebasco, Elma Mr. J. R. Lewis, Bonneville Power Administration Mr. R. V. Myers, Puget Sound Power & Light Company Mr. J. Porrovecchio, Ebasco, New York Mr. N. S. Reynolds (Bishop, Liberman, Cook, Purcell and Reynolds)

Mr. B. K. Singh, NRC Mr. B. D. Withers, Portland General Electric Company Document Control Desk - U. S. NRC

I t

i

,'I il, ili

+

g 3

s (ih i')

t4j

-[lb ii 3l;l jt 4;'j;]

l j3j11}

jJ[l[m ' '

j[

' j"

~

e'

~

1

~

~

~

~

C E

A

~

~

P

~~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~~

~

~

~

~-

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~~

~

~

~

~

879809102132456378495' 061207182314950617 N

282838393939333933939494489898888980808 ED 303030303030333033030303350505525051515 TI 252525252525222522525252235353343535353 I

888888B8888888888888888B88888BB8888888B

~

~

~

~

~

~

~

Y S

C C CeCeC Ce CC C cec C

C-C CC CeCsC R

T PCPCPCPCPCPCCPPCCPCPCPCPCPCPCPPCPCPCPCC O

S

~

T

~

~

S

~

~

I H-E 010101010101001100101' 010451515913151515 S

333333333333331333333333113131131313131 N~

NE 777777777777771777777777967676776767676 E

OT 000000000000001000000000000000000000000 T

PA 252525252525222522525252235353353535353 S

SD 888888888888888888888888888888888888888

~

YS

- E 999999999999999999999999999999999999999 SN R

_ 111111111111111111111111111111111111111 O

9

~

~

~

3 GI NT5 IS8 KE9 R 555555555555555555555555555444444444444 CU1 222222222222222222222222222000000000000 AO T. E 666666666666666666666666666444449444444

~

1 R

G T

000000000000000000000000000000000000000 TCU CA 222222222222222222222222222333333333333 RA RD 888888888888888888888888888888888888888 SN N

- 999999999999999999999999999999999999999 e

s 111111111111111111111111111111111111117-T

.n NO0

~

eo

~

t p ET3 -

~

~

es M

l e

~

USF pR CEO D OS N

. AAAAAAAAAAAA' AAAAAAAAAAAAAAAAAAAAAAAAAAA

=

mon DN8 E8

. NNNNNNNNMNNNNNNNNNNNNNNNNN4NNNNNNNNNNNM co 1

T

~

~

OA N i

N et GP A

~

U bs NS IE

~

~

D e

ou C

tQ GR N

C E

~

C-em

. se I '

~ N T

ent sos O

L-O npy

~

T osS RI

~

pe 3 -

SC AT

~

e l

sry rsp P.

PE N.

S rp N-feu AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA odS

///////////////////////////////////////

i nsn NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN oni i o

~

tce e

d l ma pem

~

mt

~ AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA' N

ost c yn C8 Se

///////////////////////////////////////

S l

m NNNNNNNNNNNNNNNNNNNNMNNNNNNNNNNNNNNNNNN ayt ili N

~

tpm

~

rp OR 555S858858S55S5SSS' 8SSSS8SS8S85SS5SS5SSS auo PSC_

122334455667S8S9O011223344S566677B8990 IE 1

0000000000000O0O.0S111111111I11111111112 TB SM EU 000000000000000000000000000000000000000 UN 11111111 1111 11111 1111111111111111111111 CPC*

G 222222222222222222222222222222222222222 7 Qjly,.,I

{j

7p b;

,J

(

f

't5' 4

(

r

(

g 9

(

s, I $if l*

j

,'