E1.7 Inadeouate 50.59 Review identified For Safety Review item 96-016
a.
Insoection Scooe
The inspectors reviewed SRI 96-016, "1996 FOI identified USAR Changes,"
Revision 0, Addendum 4, dated October 23,1996. The SRI provided a description
and evaluation of an USAR change that was identified from the HELB design basis
document Follow-On item (FOl) 94-0012, " Pipe Breaks at RHR, CS and SBLC
Containment Penetrations," dated February 15,1994.
b.
Observations and F,iMne:
The SRI proposed 16 changes to the USAR concerning pipe breaks at containment
penetrations, which, on the surface, appeared to be mostly editorial in substance
(e.g., the changes provided additional information and references for clarification,
minor wording changes which supposedly did not affect the licensing- or
design bases of the plant. However, upon further review, the inspectors noted that
the SRI revision was much more complicated; the licensee was actually redefining
l
high energy line break locations.
Paragraph Deleted
Paragraph Deleted
1
The inspectors noted that, although the SRI provided a " Reason" section for each
identified change, not all reason sections adequately explained the basis or provided
justification for the change. For example, on page 6, the reason for changing
20 gallons to 2 gallons was not adequately justified (i.e., What calculation, if any,
was used to confirm this volume? What isometric drawing (s) showed the pipe
l
location? What was the siaeed length of the pipe?). The licensee was able to
i
answer each of these questions satisfactorily for this case: however no written
i
justification was provided. The failure to provide a bases for determining that these
changes did not involve a USQ is considered an example of a violation of 10 CFR 50.59(b)(1) (50-263/96009-10(DRS)).
l
9704040262 970324
ADOCK 05000263
G
23
l
_ _ . _ _ _ _ _ . _ _ _ , _ . _ _ .
. . _ _ . _ . _ . _ . _ . . _ _ _ _ _ . _ _
.
,
,.
i
!
)
licensee committed to revising the administrative procedure for special tests to
i
address offsite testing being performed to address onsite issues. The licensee also
committed to provide training to the engineering staff regarding the requirements
for written procedures and acceptance criteria. The inspectors observed that the
actions taken would ensure that the particular violation of test controls would not
recur. This item is closed.
E8.2 (Ooen) Unresolved item 50-263/96005-03: Justification for use of SRI 95-002 to
isolate cooling water to the core spray motors. As discussed in Section 04.1, the
licensee had committed to reevaluating the test results prior to isolating cooling
water to the core spray pump motors. As of the inspection, no official evaluation
i
had been performed and SRI 95-002 had not been revised. This item remains open.
'
E8.3 (Closed) Unresolved item 50 263/96005-04: The licensee reperformed the RHR
room heatup calculation. The new calculation, CA 96-113, " Temperature of RHR
Rooms During DBA LOCA," revised the input assumptions discussed in the
unresolved items and determined that the maximum room temperature would be
j
approximately 141 F. The inspectors only reviewed the input parameters, such as
river temperature, service water flow to the coolers, and motor heat input, The
inspectors concluded that the concems raised in Inspection Report 96005 were
resolved. This item is closed.
V. Manaaement Meetinas
X1
Exit Meeting Summary
On January 8,1997, the inspectors presented the inspection rest!!!e to the Plant Manager.
The licensee acknowledged the findings presented.
The inspectors asked the licensee whether any materials examined during the inspection
l should be considered proprietary. The licensee identified some of the documents used in
l this inspection as company proprietary; these are so noted in the list of documents
l reviewed at the end of this report. The proprietary information was either destroyed or
l returned to the licensee following issuance of the inspection report.
l
,
39
.
-
_ ~ .
- - - - .
--
.-
.
.
-.-
- . _ -
-
-
I
i
OPERATING EXPERIENCE ASSESSMENTS
'
MSCP 21-95-003
Perfex Heat Exchanger Containment Cooling, Part 21 Notice (GE)
j
,
j
MSCP 21-95-004
Unanalyzed Water Hammer Loads, Part 21 Notification from General
Electric (SC95-01)
i
Power Supply for Discharv Line Fill Systern on BWR 4/5/6 ECCS and
RCIC System
i
.
PREOPERATIONAL TESTS
,
01-17-70
Pre Operational Test Procedure A 8 Residual Heat Psanoval
i
08 22 70
RHR Pre-op Test Report
09-10-70
Residual Heat Removal Pre-op A-8 - Amendment 11
09-10-70
Pre-operational Test Procedure A-8 Residual Heat Removal
06-30-72
Summary Report for Pre-operational Tests and Startup Test Results
)
EOCEDURES
4
Administrative Procedures
j
4
4 awl-01.01.01 Administrative Controls Program, Rev 4
4 awl-04.05.01 General Work Controls, Rev 10
{
4AWi-04.05.02 Requesting Work and Work Order preparation, Rev 11
4AWi-04.05.03 WO Review, Rev 10
4 awl-04.05.04 Conduct of Maintenance, Alterations and Design Changes, Rev 8
,
}
4AWi-04.05.05 WO Closeout and Disposition, Rev 7
4AWi-05.06.01 Safety Review Item, Rev 4
4
4AWi-06.01.05 Alterations Process, Rev 5
.
4AWi-09.04.01 Inservice Testing Program implementation, Rev 4
!
N1 awl-05.1.12 Plant Design Change Review Package Preparation, Review and Approval
Form 3629, Rev 5
EWi-09.04.01
Inservice Testing Program, Rev 3
i
MWi-3.M.2.01
AC Electrical Load Study
l
l Desian Basis Document Sucoort Procedures (Proorietarv)
SGP-02
Design Basis Document Procedures
SGP-02.01
Preparation of Design Basis Documents
.
!
SGP-02.02
Evaluation of Source Documents in Generating Design Basis Documents
!
SGP-02.03
System Design Basis Documents Writers Guide
SGP-02.04
Topic Design Basis Documents Writers Guide
SGP-02.06
Structure Design Basis Documents Writers Guide
SGP-02.07
Identification, Validation, Tracking, and Evaluation of Configuration
'
Management Follow-on Items and Resulting Corrective Actions
SGP-02.08
Design Basis Document Verification
l
SGP-0* O9
System Information Document Writers Guide
L
.
50
l
_
.-
.__
-
.
.
.-- -
-
..
.
-
. . - .
--
.
- -.
.
'
.,
5
Desian Procedures
MOV-00
MOV Introduction, References, and Definitions, Rev 0
MOV-01
MOV Program Document
,
MOV-02
MOV Engineering Standards
i
l NAP 1.001 A Policy and Procedure Directive, Rev 15 (Proprietary)
!
l NAP 3.006T Monticello Methodology Change, Rev 2 (Proprietary)
Emeraency Ooeratino Procedure Flowcharts (Proorietarv)
'
i.
C.5-1100 Rev 4, C.5-1200 Rev 5, C.5-1205 Rev 2, C.5-1300 Rev 4, C.5-1400 Rev 4,
4
j
C.5 2003 Rev 5, C.5-2004 Rev 5, C.5-2006 Rev 5, C.5-2007 Rev 7, C.5-3403 Rev 0
i
Maintenance Procedures
4018PM
Spare ECCS Motors (Electrical Inspection), Rev 7
'
4019PM
Spare ECCS Motors (Mechanicalinspection), Rev 4
q
40440CD
RHR Loop A Leak Rate Test, Rev 5
40450CD
RHR Loop B Leak Rate Test, Rev 5
'
4180PM
RHR Pump, Rev 2
4181-1 PM
11 RHR Pump Motor, Rev 3
4181-2PM
12 RHR Pump Motor, Rev 4
4181-3PM
13 RHR Pump Motor, Rev 4
4181-4PM
14 RHR Pump Motor, Rev 4
[
4181-10CD
11 RHR Pump Motor, Rev 1
-
4181-20CD
12 RHR Pump Motor, Rev 1
4181-3OCD
13 RHR Pump Motor, Rev 1
4181-40CD
14 RHR Pump Motor, Rev 1
4182PM
RHR System, Rev 6
4229-20CD
RHR 2-2 AND RHR-2-4 Pump Discharge Check Valves, Rev 0
4229-2PM
RHR B Pump Discharge Check Valve, Rev 0
4821 1PM
RHR System A Electrical Maintenance, Rev 1
4821-2PM
RHR System B Electrical Maintenance, Rev 1
q
4821-10CD
RHR System A Electrical Maintenance, Rev 3
4821-20CD
RHR System B Electrical Maintenance, Rev 2
4862PM
Shutdown Cooling isol Valve Electrical Maintenance, Rev 2
48620C
Shutdown Cooling isol Valve Electrical Maintenance, Rev 1
1
4863PM
Head Spray Valve Electrical Maintenance, Rev 1
1
48630CD
Head Spray Valve Electrical Maintenance, Rev 1
4906PM
Air Supply Check Valves, Rev 2
4916-110CD
Lubrication; SW & SE Rx Bldg Equipment Rooms, Rev 2
4916-11PM
Lubrication: SW & SE Rx Bldg Equipment Rooms, Rev 8
4916-20PM
Lubrication - Miscellaneous, Rev 9
4920-40CD
Replacement of SV-1994 (11 RHR Pump Minimi.m Flow), Rev 2
4920-50CD
Replacement of SV-1995 (12 RHR Pump Minimum Flow), Rev 2
4920-60CD
Replacement of SV-1996 (13 RHR Pump Minimum Flow), Rev 2
4920-70CD
Replacement of SV-1997 (14 RHR Pump Minimum Flow)
7110
RHR System Instrument Maintenance Procedure, Rev 13
,
51
-
,