ML20137F614
Text
-
I I?
UNITED STATES NUCLEAR PEGULAToRY coMMISSloN OFFICE oF INSPECT 8oN AND ENFORCEMENT REGloN IV 611 RYAN PL AZA oRIVE, SUITE 1000 ARLINGTON, TEXAS 76012 s
February 12, 1976 l
Texas Utilities Generating Company Docket No. 50-445 &
ATTN:
Mr. Perry C. Brittain 50-446.
President 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
i l
_ This is to acknowledge receipt of your letter dated January 15, 1976,
(-
in response to our letter to you da ed December 16, 1975.
l We have no further questions regarding the corrective action taken in regard to the 25 DDR's; however, we remain concerned that the disposition of the DDR's did not clearly identify the effect on the quality of the concrete utilized in Class I Structures, but rather addressed disposition as related to the individual DDR. This question of concrete quality will be pursued during a subsequent inspection.
The date of December 18, 1975 was, as you stated, incorrectly shown and should have been November 18, 1975.
Sincerely, c?c G. L. Hadsen, Acting Chief, Reactor Construction and 8512O20059 gSt 106 Engineering Support Branch PDR FOIA ppR GARDEB S-59 bec:
v/1trJ.L.ForbistoG.L.Madsen,dtd'1/15/76}
E. D. Thornburg, IE:HQ (1)
G. W. Roy, IE:HQ (1) nt 1 Files (1)
M 4)
PDR:HQ
}
Local PDR 0?
C Texas Department of Health Resources
. - =
, pes.-,e..
.-a
- = =. =
+=.e e -