. - _

0160015y7g0R 4M 02v3 a

i

\\

SNN GENucle:r Energy

/ 3.9 W S Genent Dectnc Company I15 Curtner Avenue. San Jose. CA 95125 February 25, 1997

~

U.S.

Nuc13ar Regulatory Commission

)

Division of Industrial and Medical Nuclear Safety, NM88 Washington, D.C.

20555 Attention:

Ms. Gloria Bennington l

)

Dear Ms. Bennington:

Please find enclosed, information requesting route approval in accordance with 10 CFR Part 73, for the shipment of irradiated test fuel rods If you have any questions or correspondence regarding this request, please contact the undersigned.

Your immediate attention to this request is respectfully requested.

Thank you for your cooperation.

Sincerely, GENERAL ELECTRIC COMPANY l

f-4 M.W.

Kirkland, Sr. Specialist Licensing & Traffic Mail Code 200 Phone (408) 925-5703 Fax. (408) 925-2570 l

Enclosure

\\l\\ 6 O

54 C

PDR j

MlppBpppEpipH j

4 a ;

)

i 1

a l

IRRADIATED FUEL ROUTE i

l GPU NUCLEAR CORPORATION THREE MILE ISLAND NUCLEAR POWER STATION NEAR MIDDLETOWN, PENN8YLVANIA TO I

GE NUCJLEAR EMBRGY i

VALLECITOS NUCLEAR CENTER PLEASANTON, CAL 770RNIA ii APRIL 1997

\\

l l

i

SD-SP].)

4 a

4 J

1 1

This route request is for a shipment of irradiated reactor 4

fuel rods from Three Mile Island (TMI) Nuclear Power Station Middletown, PA to Vallecitos Nuclear Center, Pleasanton, CA.

GE Nuclear Energy has been contracted by TMI to'obtain the routing approval and make all necessary arrangements for this shipment on their behalf.

4 The proposed shipments consists of irradiated pressure water reactor (PWR) fuel rods.

These fuel rods are part of a research and development program sponsored by EPRI.

The j

details of this shipment will be provided under separate covers as required per 10 CFR 73.37 prior to the shipment.

GPU Nuclear Corporation, TMI will assume responsibility as l'

the shipper using the route as approved by the NRC.

General Electric will make arrangements on behalf of TMI to acquire armed escorts per 10 CFR 73.37 through the heavily populated areas identified.

m

~_

~*

1 8HIPMENT INFORMATION I.

CARGO DESCRIPTION 1.

Quantity and Type of Fuel a.

Total Fuel Rod Segments - 1 PWR "HRCQ" b.

Total curies - (Later) c.

Total Decay Heat - (LATER) Watts d.

Total Weight U plus Pu - (Later) Grams 2.

Cask Identification NAC Model NLI-1/2, USA /9010/B( )F l

3.

Loaded Weights Trailer - 13,980 Lbs TrucA - 18,500 Lbs Cask - 43,000 Lbs II.

ANTICIPATED SCHEDULE 1.

Number of Shipments - One j

2.

Approximate Duration of complete transfer - 71 hours8.217593e-4 days <br />0.0197 hours <br />1.173942e-4 weeks <br />2.70155e-5 months <br /> 3.

Proposed Shipment Schedule - Late April 1997 III.

ROUTE 1.

Origin and Destination a.

Origin:

Three Mile Island Nuclear Station Middletown, Pennsylvania b.

Destination:

GE Vallecitos Nuclear Center Pleasanton, California 2.

Proposed Route Pennsylvania Option 1:

TMI north on PA 441 to PA 230 2.0 miles PA 230 west to I-76 2.0 miles I-76 west to I-70/I-76 86.0 miles I-70/I-76 west to I-70 87.0 miles I-70 west to WV Line 58.0 miles 235.0 miles Option 1:

Subtotal 235.0 miles

_1 i

_a._s

,a-.#.,.v-a...:

-m.-m s.--

e 2.

Proposed Routing Option 2:

TMI north on PA 441 to PA 230 2.0 miles.

PA 230 west to I-76 2.0 miles I-76 west to I-81 20.0 miles I-81 south / west to MD Line 68.0 miles Subtotal' 92.0 miles Maryland I-81 southwest to I-70 8.0 miles I-70 west to I-68 26.0 miles I-68 west.to West Virginia line 34.0 miles Subtotal 68.0 miles West Vircinia I-68 west to I-79 62.0 miles I-79 north to Pennsylvania line 12.0 miles subtotal 74.0 miles Pennsylvania I-79 north to I-70 32.0 miles I-70 west to Virginia State line 17.0 miles Subtotal 49.0 miles Option 2:

Subtotal 283.0 miles Fest Vircinia I-70 west to Ohio State line Subtotal 20.0-miles Ohio I-70 west to I-270 118.0 miles I-270 south / west / north to I-70 30.0 miles I-70 west to Indiana State line 59.0 miles Subtotal 207.0 miles Indiana I-70 west to I-465 60.0 miles I-465 south / west / north to I-74 18.0 niles I-74 west to Illinois State line 37.0 miles subtotal 115.0 miles Illinois I-74 west to I-474 161.0 miles I-474 west / north to I-74 9.0 miles I-74 West to I-280 56.0 miles I-280 west to Iowa State line 16.0 miles Subtotal 242.0 miles 2.

Proposed Routing - Cont'd Iowa I-280 west / north to I-80 16.0 miles I-80. west to I-35 192.0 miles I-35/I-80 to I-80 17.0 miles I-80 west to I-680 112.0 miles I-680 south / west to Nebraska State line 35.0 miles subtotal 372.0 miles Nebraska I-680 west to I-80 26.0 miles i

I-80 west to Wyoming line 362.0 miles Subtotal 388.0 miles Wyoming I-80 west to Utah line Subtotal 455.0 miles i

Utah I-80 west to Nevada line Subtotal 202.0 miles Nevada I-80 west to California line Subtotal 418.0 miles California I-80 west to I-5 108.0 miles I-5 south to I-205 66.0 miles I-205 west to I-580

'12.0 miles I-580 west to I-680 21.0 miles I-680 south to CA-84 8.0 miles CA-84 east to GE Facility 1.0 mile Subtotal 216.0 miles Option 1 Total 2,870.0 miles Option 2 Total 2,918.0 miles Estimated elapsed time for shipment is 72-73 hours, based on an average speed of 40 miles per hour.

3.

Location of Planned Stopovers, Food and Fuel Stops Finalized, once a route is approved.

4.

Carrier Our carrier, Tri-State Motor Transit Company, has assured us they will transport these irradiated reactor fuel rods over the route as approved.

  • 1 4 ',

- c IV.

HEAVILY POPULATED AREAS REOUIRING ARMED ESCORT q

The urbanized areas anticipated on route are as follows:

1.

Pennsylvania origin to border - State required 2.

Columbus, OH 3.

Indianapolis, IN 4.

Illinois border to border - State required 5.

Davenport, IO l

6.

Des Moines, IO' 7.

Omaha, NE 8.

Lincoln, NE 9.

Balt Lake City, Utah

10. Reno, NV L
11. Sacramento, CA
12. Stockton, CA
13. Hayward, CA GE Nuclear Energy will take action required by 10 CFR Part

-73, to secure armed escort services from state and/or local police agencies through the urbanized areas as identified on the approved route.

V.

COMMUNICATIONS CAPABILITIES Tri-State Motor Transit Company has a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> number which will receive 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> check calls from the transport while shipment is in transit.

The GE Vallecitos Nuclear Center in Pleasanton, CA will maintain a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> emergency response number.

A(TMIROUTE)