_
.
-c -
m
SE.P 11 1985
In Reply Refer To:
Docket: -50-445/85-02
j
i
.
1 .
Texas Utilities Generating Company
ATTN: Mr. W..G. Counsil
Executive Vice President
400 North Olive, L.B. 81
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Messrs. D. L. Kelley and W. F. Smith
of this office during the period January 1 through February 28, 1985, of
,
activities authorized by NRC Construction Permit CPPR-126 for the Comanche Peak
Facility, Unit 1, and to the discussion of our findings with Mr. J. C.
Kuykendall and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included:
(1) preoperational test results-
evaluation; (2) applicant actions on previous inspection findings; (3) plant
tours; and (4) plant status. Within these areas, the inspection consisted of
selective examination of procedures and repre::entative records, interviews with
personnel, and observations by the inspectors. These findings are documented
in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations.
I
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
Three new unresolved items are also identified in paragraph 2 of the enclosed
inspection report. Unresolved Items are matters requiring more information in
order to ascertain whether they are acceptable items, violations or deviations,
a
g9170134850911
G
ADOCK 05000445
'
RIV:RPB2
RPB2
RPB2/
DRS&P
N
g
,
DKElley:ac
WSmi
DMHun
utt
DRH nter RPDenise
VNoon
9 / o /85
g /to/85
4/ ti/85
/85 4/p /85
9/10/85
i
g 0I
aff.
_.
.
.
-
.
Texas Utilities Electric Company
-2-
The response directed by this letter and the accompanying notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely.
'
Criginal S",'
II
IlichEd P N ' l
R. P. Denise, Director
. Division.of Reactor Safety
and Projects
Enclosure:
Appendix A - Notice of Violation
Appendix B - NRC Inspection Report
50-445/85-02
Texas Utilities Electric Company
ATTN:
J. W. Beck, Manager,
Licensing
Skyway Tower
400 North Olive Street
Lock Box 81
Dallas, Texas
75201
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, CPTG
R. Denise, D/DRSP
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD
Juanita Ellis, Pres.- CASE
- RIV File
Renea Hicks, A/ Atty General, EP Div.-TX
- D. Weiss, LFMB (AR-2015)
- w/766
.