Forwards Predecisional Enforcement Conference Summary Repts 50-295/96-11 & 50-304/96-11 on 961112.Response Not Required Until Licensee Notified of Proposed Enforcement Action
ML20135B678
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/27/1996
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20135B679 List:
References
EA-96-355, NUDOCS 9612050095
Download: ML20135B678 (2)


See also: IR 05000295/1996011

Text

l

r

U

November 27, 1996

i

' EA 96 355

Mr. J. H. Mueller

i

Site Vice President

'

Zion Generating Station

Commonwealth Edison Company

j

101 Shiloh Boulevard

j

Zion, IL 60099

SUBJECT:

NRC PREDECISIONAL ENFORCEMENT CONFERENCE REPORT

]

Dear Mr. Mueller:

i

This refers to a Predecisional Enforcement Conference conducted by Mr. A. B. Beach,

i

Regional Administrator, and other members of the Region ill and Headquarters staff on

,

November 12,1996. The subject of this conference was the apparent violations at Zion

l

Station identified in NRC Inspection Reports No. 50-295/96011: 50-304/96011 and

i

involving: (1) an ineffective 10 CFR 50.59 Safety Evaluation process: (2) inadequate

- modification closecut and post-modification testing: (3) failure to follow procedures and

l

inadequate procedures which contributed to lack of control of Technical Specification

l

'

Interpretations: (4) inadequate identification and resolution of recurring equipment

deficiencies; and (5) weak oversight of engineering activities. We have enclosed a report

4

summarizing the discussion.

i

You will be notified by separate correspondence of our decision regarding the Enforcement

l

Action based on the information presented and discussed at the Predecisional Enforcement

.

Conference. No response is required until you are notified of the proposed Enforcenient

Action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and enclosed inspection report will be placed in the NRC Public Document Room.

a

l

d

9612050095 961127

~

gDR

ADOCK 05000295

PDR

h e (E-O(

f

V

J. H. Mu llar

-2-

We will gladly discuss any questions you have concerning this Predecisional Enforcement

Conference.

Sincerely,

Original signed by Geoffrey E. Grant

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket Nos. 50-295;50-304

Enclosure:

Predecisional Enforcement

Conference Report

cc w/ encl:

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

i

G. K. Schwartz, Station Manager

W. Stone, Regulatory Assurance

Supervisor

I. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce Commission

T. J. flaiman, Senior Vice President

Nuclear Operations Division

Distribution:

Docket File w/ encl

SRis, Zion, Braidwood,

Enf. Coordinator, Rlll w/enct

PUBLIC IE-01 w/enct

Byron w/enct

RAC1 w/enci (E-mail)

OC/LFDCB w/enci

G. E. Grant, Rlil w/enci

CAA1 w/enct (E-mail)

DRP w/enci

LPM, NRR w/enci

W. L. Axelson, Rlli w/ encl

Rlll PRR w/ encl

DRS w/ encl

A. B. Beach, Rlll w/enci

DOCUMENT NAME: G:\\DRS\\ZIO96011.ENF

To receive a copy of this document, Indicate in the bos 'C' = Copy without attachment / enclosure *E" = Copy with attachment / enclosure

"N* es No copy

OFFICE

Rill

p

Rlli

f_

Rlil

5 Qlli

Alll

,

,

NAME

JFalevits:nhgMRing@M

C)k

M'

B rso

HClayton/GGrant

a

UGuzmang

MDapa

DATE

11/g/96 57

11h2/96

11/6 96

J(/ /96\\

11/fyM/

OFFICIAL RECORD COPY

-_