ML20135A829
| ML20135A829 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/31/1996 |
| From: | Heysek W, James Knubel GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 6710-96-2383, NUDOCS 9612040057 | |
| Download: ML20135A829 (4) | |
Text
.
I GPU Nv,! ear,Inc.
k Route 441 South NUCLEAR Post once Box 480 Middletown, PA 17057 0480 Tel 717-944 7621 November 13, 1996 6710-96-2383 i
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Three Mile Island Nuclear Station, Unit I (TMI-1) l Operating License No. DPR-50 Docket No. 50-289 Monthly Operating Report for October 1996 l
1 l
Enclosed are two copies of the October 1996 Monthly Operating Repon for Three Mile Island Nuclear Station, Unit 1.
l Sincerely, J. Knubel Vice President and Director, TMI WGH 030094 T' g } k j
cc: Administrator, Region I TMI Senior Resident Inspector 96001 9612040057 961031 PDR ADOCK 05000289 R
PDR t
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-289 UNIT TMI-1 DATE 11 1L 46 COMPLETED BY W G HEYSEK TELEPHONE (717) 948-8191 MONTH:
OCTOBER DAY AVERAGE DAILY POWG LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 807 17 805 2
808 18 807 3
811 19 818 4
822 20 817 5
819 21 817 6
817 22 814 7
815 23 809 8
812 24 812 9
810 25 814 10 813 26 813 11 819 27 808 12 819 28 807 13 B12 29 817 14 807 30 807 15 817 31 814 16 808 l
l i
l
OPERATING DATA REPORT r
DOCKET NO.
50-289 DATE 11-13-96 COMPLETED BY W G HEYSEK OPERATING STATUS TELEPHONE (717) 948-8191
- 1. UNIT NAME:
THREE MILE ISLAND UNIT 1 NOTES:
- 2. REPORTING PERIOD:
OCTOBE 1996
- 3. LICENSED THERMAL POWER:
2568
- 4. NAMEPLATE RATING (GROSS MWe):
872
- 5. DESIGN ELECTRICAL RATING (NET MWe):
819
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 834
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
786
- 8. IF CHANGES OCCUR IN (ITEMS 3-7) SINCE LAST REPORT, GIVE REASONS:
4
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
lHIS MONTH YR-TO-DATE CUMMULATIVE 1
- 11. HOURS IN REPORTING PERIOD (HRS) 745.0 7320.0 194305.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL (HRS) 745.0 7320.0 116863.1
- 13. REACTOR RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 2284.0
- 14. HOURS GENERATOR ON-LINE (HRS) 745.0 7320.0 115701.3
- 15. UNIT RESERVE SHUTDOWN HOURS (HRS) 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,911,208.3 18,734,895.4 284,849,821.4
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 639,813.0 6,240,218.0 95,693,692.1
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 605,435.0 5,898,205.0 89,941,609.1
- 19. UNIT SERVICE FACTOR
(%)
100.0 100.0 59.5
- 20. UNIT AVAILABILITY FACTOR
(%)
100.0 100.0 59.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 103.4 102.5 58.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 98.4 56.5
- 23. UNIT FORCED OUTAGE RATE
(%)
0.0 0.0 34.4 UNIT FORCED OUTAGE HOURS (HRS) 0.0 0.0 60761.2
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
DOCKET No.
50-289 UNIT NAME TMI-1 DATE REPORT MONTH October 1996 11-13-96 COMPLETED BY W. G. Heysek
- 4 TELEPHONE (717) 948-8191 Method of Luensee Sie Compnnent Came & Cmectws Shumng Event Code Code Actwn to N*
Osm hve Durstwn Reason' 2
gg
%p,-
(Hours) pg ogs ege None 1
2 3
4 F F:vced Reason Method Exh: tut G-Imtnn1mns for 5 Scheduled A Eqinpment Fadure qErpimn) 1-Manual preparanon of Data Entry Shees B4tamrenance or Test 2 ManualScram forImensee Event Report (LER)
C-Refinelmg 3-Automanc Scram File (NUREG-0161)
D Regulatory Resen1mn 4other(Explam)
EWoe Tang & hmg Exanunnon 5 Exinw i.an.curce F-Adnurweative G-opernixmal Emv IExplam)
H-Other (Explem) b Actuary used exhibin F & 11 NL1tEG G16t
- -