Forwards Review of Millstone Unit 3 Tech Specs & Tech Spec Comparison Rept 50-423/85-37 on 850708-0819.Tech Specs & Implementing Procedures Compatible w/as-built Plant. Refinement of Tech Specs & SAR Need to Be Accomplished
ML20135A641
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/30/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20135A643 List:
References
NUDOCS 8509100226
Download: ML20135A641 (2)


See also: IR 05000423/1985037

Text

..

__

.

w

. . ,

c.

'

AUG 3 01985

Docket No. 50-423

Northeast Nuclear Energy Company

,

ATTN:

Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

-P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Technical Specification Comparison (Report 50-423/85-37)

This forwards the enclosed NRC contractor report of a comparison of draft Millstone

3 Technical Specification provisions and the Millstone 3 facility.

That sampling

'

comparison was based on a selection from the more significant contribLtors to risk

identified in your Probablistic Safety Study for Millstone 3.

The pre

ninary

!

results of the comparison were discussed with Mr. Crockett and other - ' cc of

your staff on July 19, 1985.

Overall, this comparison concluded that the Technical Specifications and implement-

ing procedures are compatible with the as-built plant, consistent with the present

stage of development of the Technical Specifications and procedures.

As the report

illustrates, however, a substantive amount of refinement of Technical Specification

and SAR provisions remained to be accomplished at the time of the comparison, as

did a considerable amount of procedure development. We will use the report as a

-

reference in our inspection efforts, and significant aspects will be pursued fur-

ther through our ongoing inspections of facility testing and conformance to NRC

requirements and your commitments.

Your cooperation with us and our contractor is appreciated.

Sincerely,

l

ori;rinni SigneOT11

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Report 50-423/85-37

.

.

I

h[

B509100226 850830

Q

$ "

"

'

M il

l

t

-

._ _-

._.

. _ _ _

_

. .._

__

_ . -

-_..

._ ___

'

.

p

?

,

AUG 3 01985

Northeast Nuclear Energy Company

2

1

cc w/ encl:

'

V. Papadopoli, Construction Quality Assurance Supervisor

,

!

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

~Public Document Room (PDR)

Local Public Document Room (LPDR)

.

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

t

State of Connecticut

.

"

bec w/ encl:

Region I Docket Room (with concurrences)

DRP Section Chief

G. Walton, SRI, Beaver Valley Unit 2

'.

B. Doolittle, NRR

R. Perch, NRR

B. Youngblood, NRR

R. Starostecki, RI

S. Ebneter, RI

<

!

L. Bettenhausen, RI

J. Durr, RI

P. Eselgroth, RI

J. Wiggins, RI

'

C. Anderson, RI

P. Eapen, RI

-

J. Johnson, RI

T. Martin, RI

>

'

R. Bellamy, RI

R. Summers, RI

,

'.

H. Van Kessel, RI

H. Phillips, IE

J

i

i

,

!

RI:

P

1

McC

o

We ti

r

'

8/28/85

l

_

'

0FFICIAL RECORD COPY

i

.. . .--- .-.- . . -.-

_,- . _ - - - - - - _ - _ - _ , _ _

, _ - , _

,

,

. . . .

,