ML20135A641
| ML20135A641 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/30/1985 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20135A643 | List: |
| References | |
| NUDOCS 8509100226 | |
| Download: ML20135A641 (2) | |
See also: IR 05000423/1985037
Text
..
__
.
w
. . ,
c.
'
AUG 3 01985
Docket No. 50-423
Northeast Nuclear Energy Company
,
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations Group
-P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Technical Specification Comparison (Report 50-423/85-37)
This forwards the enclosed NRC contractor report of a comparison of draft Millstone
3 Technical Specification provisions and the Millstone 3 facility.
That sampling
'
comparison was based on a selection from the more significant contribLtors to risk
identified in your Probablistic Safety Study for Millstone 3.
The pre
ninary
!
results of the comparison were discussed with Mr. Crockett and other - ' cc of
your staff on July 19, 1985.
Overall, this comparison concluded that the Technical Specifications and implement-
ing procedures are compatible with the as-built plant, consistent with the present
stage of development of the Technical Specifications and procedures.
As the report
illustrates, however, a substantive amount of refinement of Technical Specification
and SAR provisions remained to be accomplished at the time of the comparison, as
did a considerable amount of procedure development. We will use the report as a
-
reference in our inspection efforts, and significant aspects will be pursued fur-
ther through our ongoing inspections of facility testing and conformance to NRC
requirements and your commitments.
Your cooperation with us and our contractor is appreciated.
Sincerely,
l
ori;rinni SigneOT11
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure: NRC Region I Report 50-423/85-37
.
.
I
h[
B509100226 850830
Q
$ "
"
'
M il
l
t
-
._ _-
._.
. _ _ _
_
. .._
__
_ . -
-_..
._ ___
'
.
p
?
,
AUG 3 01985
Northeast Nuclear Energy Company
2
1
cc w/ encl:
'
V. Papadopoli, Construction Quality Assurance Supervisor
,
!
E. R. Foster, Director of Generation Construction
E. J. Mroczka, Vice President, Nuclear Operations
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
W. D. Romberg, Station Superintendent
~Public Document Room (PDR)
Local Public Document Room (LPDR)
.
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
t
State of Connecticut
.
"
bec w/ encl:
Region I Docket Room (with concurrences)
DRP Section Chief
G. Walton, SRI, Beaver Valley Unit 2
'.
B. Doolittle, NRR
R. Perch, NRR
B. Youngblood, NRR
R. Starostecki, RI
S. Ebneter, RI
<
!
L. Bettenhausen, RI
J. Durr, RI
P. Eselgroth, RI
J. Wiggins, RI
'
C. Anderson, RI
P. Eapen, RI
-
J. Johnson, RI
T. Martin, RI
>
'
R. Bellamy, RI
R. Summers, RI
,
'.
H. Van Kessel, RI
H. Phillips, IE
J
i
i
,
!
RI:
P
1
McC
o
We ti
r
'
8/28/85
l
_
'
0FFICIAL RECORD COPY
i
.. . .--- .-.- . . -.-
_,- . _ - - - - - - _ - _ - _ , _ _
, _ - , _
,
,
. . . .
,