i November 20, 1996 i
1 B&W Fuel Company Commercial Nuclear Fuel Plant ATTN:
Mr. Charles W. Carr, Vice President Manufacturing and Field Services P.O. Box 11646 Lynchburg, VA 24506-1646
Dear Mr. Carr:
SUBJECT:
CONFIRMATORY ACTION LETTER This is in reference to an exit meeting on November 15,1996, between you and your staff with Messrs. T. Pham and D. Whaley of this office and C. Hughey of NRC's Region il office concerning operations in your facility involving the unloading of unirradiated fuel assemblies. This meeting resulted from your notification of the NRC Operations Center and i
the Region 11 n'fice on November 13,1996, of an unaccounted for low enriched fuel i
assembly whicn had been received from Griefswald, Germany, which was inadvertently returned to its point of origin in Germany. Based on the November 15,1996, meeting and the telephone conversation on November 19,1996, between you and Dr. Michael Bell, Acting Director of the Division of Fuel Cycle Safety and Safeguards, and other members of my staff, it is our understanding that you have taken or will take the following actions which will be completed by the dates specified:
An analysis and determination of the root cause for the reported event will be provided to the NRC by November 27,1996.
An action plan describing the schedule of implementation and completion for e
the corrective actions will be provided to the NRC by November 27,1996.
1 Prior to next receipt, procedures will be developed for the receipt, unloading, j
e material accounting and transfer to storage of such fuel assemblies, and submitted to NRC for review, to ensure NRC has no objection to t ese h
procedures.
Pursuant to Section 182 of the Atomic Energy Act,42 U.S.C. 2232, and 10 CFR 2.204, you are required to:
1)
Notify me immediately if your understanding differs from that set forth above, a
{
2)
Notify me if for any reason you cannot complete the actions within the h)g;h specified schedule and advise me in writing of your modified schedule in advance of the change, and I
NRC flLE CHES M 9611250050 961120 PDR ADOCK 07001201 C
4 4
B&W Fuel Company i
- 3) ' Notify me in writing when you have completed the actions referenced and addressed in the Confirmatory Action Letter.
issuance of the Confirmatory Action Letter does not preclude issuance of an order formalizing the above commitments or requiring other actions on the part of the licensee, l
nor does it preclude the NRC from taking enforcement action for violations of NRC requirements that may have prompted the issuance of this letter. In addition, failure to t
l take the actions addressed in this Confirmatory Action Letter may result in enforcement action.
l-In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and your response will be placed in the NRC Public Document Room.
Sincerely, u
C'. @'u' *Jf * * '
Carl J. Paperiello, Director Office of Nuclear Material Safety and Safeguards Docket No. 70-1201 License No. SNM-1168 I
CAL No. H-96-001 1
DISTRIBUTION:
FCOB r/f Docket 70-1201 Public NRC File Center FCSS r/f NMSS r/f H. Thompson, DEDS J. Lieberman, OE M. Weber, FCLB B. Mallett, Region 11 M. Lamastra, FCLB JL PROOFED 11/20 FOR EDS OfC FCoh
[
FCOB_
[
_FCSS j
- All, N% g /)
j NAME Tfh p
a k
g C
DATE l OOff$
ll 1101 fh
// 1)O/((,
f f51 %
ll I)h f C = COV ER i = COVER & ENCLOSURE h = NO COPY OFFICIAL RECORD COPY