ML20134M237
| ML20134M237 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 11/15/1996 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stanley H COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20134M240 | List: |
| References | |
| NUDOCS 9611220285 | |
| Download: ML20134M237 (2) | |
See also: IR 05000456/1996015
Text
,
_ . _ _ _ _ _ _ . . _ _
._ _ . . _ . _
__ . _ _
_
._
_
l
i
.
,
n,
-
s
v
November 15, 1996
i
i
Mr. H. G. Stanley
Site Vice President
+
Braidwood Nuclear Power Station
Commonwealth Edison Company
R. R. #1, Box 84
.
Braceville, IL 60407
-
i
SUBJECT:
'NRC ROUTINE RADIATION PROTECTION INSPECTION REPORTS NO. 50 .
456/96015(DRS); 50-457/96015(DRS)
}
Dear Mr. Stanley:
,
l
This refers to the inspection completed.on October 18,1996 at your Braidwood facility.
- -
The enclosed report presents the results of that inspection.
-This insp'ection included an announced review of the licensee's radiation monitoring
system, the control room and auxiliary building filtered Heating, Ventilation, and Air-
- l
Conditioning (HVAC) systems, and an inspection of radioactive waste system tank rooms.
Special emphasis was placed on operability, and material condition of these systems. . In
i
addition, a routine review of activities for the Unit 1 mid-cycle outage was conducted.
-
ll
This inspection noted that the material condition of the radioactive waste tank rooms was .
j
good as evidenced by adequate housekeeping in the areas, minimal contaminated area,
i
and the low number of outstanding work request items for the equipment in these rooms.
Likewise the HVAC systems inspected were free of debris and found in good working
!
order.
The radiation monitors inspected were in good working order and appropriate corrective
actions were being implemented for the' four monitors which exhibit recurring operability
t
problems. However, the inspection identified that the basis document for the alarm set
i
point calculations for these monitors was informally controlled.
.
This inspection also noted that good radiological controls were being provided by the
radiation protection (RP) organization for work activities ongoing during the Unit 1 mid-
,,
'
cycle outage. However, a review of the work control process noted a communication
deficiency which contributes to issues not being evaluated or discussed until the final
stages of the planning process, especially for short lead time activities.
l
!'
No violations of NRC requirements were identifie'd during this inspection.
- .
-
1
I
i-
9611220285 961115
'
ADOCK 05000456
G
_PDR
-
7
1
_.
.
_ . . _ . _ .
_
_
__
4
I
i
H. Stanley
-2
November 15, 1996
.
.
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and the enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
,
Original Signed by Brent Clayton (for)
Geoffrey E. Grant, Director
Division of Reactor Safety
i
Docket Nos. 50-456; 50-457
Enclosure:
Inspection Reports No.
50-456/96015(DRS);
-
50-457/96015(DRS)
'
cc w/ encl:
D. A. Sager, Vice President,
Generation Support
H. W. Keiser, Chief Nuclear
Operating Officer
T. Tulon, Station Manager
T. Simpken, Regulatory Assurance
Supervisor
1. Johnson, Acting Nuclear
Regulatory Services Manager
Document Control Desk - Licensing
Richard Hubbard
Nathan Schloss, Economist,
,
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce Commission
,
Distribution:
Docket File w/ encl
Rill PRR w/enci
W. L. Axelson, Rlli w/ encl
PUBLIC:p w/ encl
SRis, Braidwood, Byron,
Enf. Coordinator, Rlll w/enci
OC/LFDCB w/enci
Zion w/ encl
RAC1 w/ encl (E-mail)
I
DRP w/enci
LPM, NRR w/ encl
CAA1 w/enci (E-mail)
DRS w/enci
A. B. Beach, Allt w/enci
, p<h
/
DOCUMENT NAME: G:DRS\\ BRA 96015.DRS
To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure
'E" = Copy with attachment / enclosure
"N* = No copy
,
TFl&
RIII
RIIl
_ lN RIII
////h
f_
RIII
/6(-
l6
NS/E
PLouden:jp7 W
TKozak-T_. -
RLanksUh V
BClayton/Wrant
DATE
11/01/96 P
11/ 8 /96
11/13 i966
11/ IY /96
&
lCIAL FEDO GP(