o Northem States Power Company
]
Monticello Nuclear Generating Plant 2807 West Hwy 75 i
Monticello, Minnesota 55362-9637 November 14,1996 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthly Operating Report for October,1996 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of October is provided.
Please contact Marv Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.
hr W A-RogerO And rson Director Licensing and Management issues c:
Regional Administrator-lil, NRC NRR Project Manager, NRC l{} }
Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg L!
( 1/
1/
9611200215 961031 PDR ADOCK 05000263 R
PDR 200100
i OPERATING DATA REPORT
~
DOCKET NO.
50-263 DATE 11-1-96 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
- 1. Unit Name Monticello
]
]
i 2.
Reporting eriod:
October
]
]
- 3. Licensed T ermal Power (MWt) :
1670
]
]
- 4. Nameplate Rating (Gross MWe) :
576.5
]
]
- 5. Design Electrical Rating (Net MWe):
552.9
]
]
- 6. Maximum Dependable Capacity (Gross MWe): 571.5
)
]
- 7. Maximum Dependable Capacity (Net MWe): __543.5
]
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 745 7320 222121
- 12. Number Of Hours Reactor Was Critical 745.0 6233.4 181993.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 745.0 6081.1 178951.9
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1238499 9564732 277617521
- 17. Gross Electrical Energy Generated (MWHJ 430336 3259334 93889365
- 18. Net Electrical Energy Generated (MWH) 415072 3116928 89848300
- 19. Unit Service Factor 100.0%
83.1%
80.6%
- 20. Unit Availability Factor 100.0%
83.1%
80.6%
- 21. Unit Capacity Factor (Using MDC Net) 102.5%
78.9%
75.4%
- 22. Unit Capacity Factor (Using DER' Net) 100.8%
77.5%
74.1%
- 23. Unit Forced Outage Rate 0.0%
3.4%
3.4%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
_None
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
- 26. Units In Test Status (Prior to Commercial Operation) : N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- - -... -. - =
... ~.. -.. - -.
.... - - ~........ - -. ~.... -
r 3
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello-DATE 11-1-96 COMPLETED BY.
H. H.
Paustian a
TELEPHONE 612/295-5151.
MONTH OF October i
DAY
- AVERAGE DAILY POWER LEVEL DAY AVERAGE' DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
)
1-558.
17 557.
2 559.
18 560.
3 560.
19 560.
4 560.
20 561.
'5 559.
21 559.
6 559.
22 558.
7 559.
23 558.
]
8 559.
24 557.
i 9
554.
25 559.
)
10 560.26-560.
11 560.
27 562.
12 560.
28 562.
.13 559.
29 557.
14 560.
30 561.
15 557.
31 565.
16 492.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting. month.
Compute to the nearest whole megawatt.
l
.. ~...
MARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 11-1-96 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 MONTH OCT l
10-01-96 to Power operation 10-31-96 i
l i
l i
i Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
O
+
O LINIT SHUrD0VNS AND POWER REDUCTIONS DOCKER No. 50-263 INIT NAME Honticello DATE ~11-01-%
COMPIETED BY H. H. Paustian.
REPORT MONTH October TELEPHONE-_612/295-5151 ].
No.
Date Duration Reason Method LER Ty(pe (hours)
(2) of No.
S stem Como.
Cause & Corrective b
1) de Code Action to Shutdown (4)
(5)
Prevent Recurrence (3)
None i
i L
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram i
C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) v P
.