Discusses Insp Rept 50-416/96-11 on 960812 & Nov.Response to Violations,Noted
ML20134D145
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/09/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20134D150 List:
References
NUDOCS 9610150117
Download: ML20134D145 (6)


See also: IR 05000416/1996011

Text

_~

_

_

.

.

'

I

t" H

y-

UNITEo STATES

.

l

/,

.\\

NUCLEAR REGULATORY COMMISSION

REGloN IV

l

611 R YAN PLAZA DRIVE. SUITE 400

't, .....f

AR LINGioN, T E XAS 76011 8064

OCT

9 1996

C. R. Hutchinson, Vice President

Operations - Grand Gulf

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT: NRC INSPECTION REPORT 50-416/96-11 NOTICE OF VIOLATION

We have reviewed your letter dated September 11,1996,in response to our letter and

Notice of Violation (Notice) dated August 12,1996. After reviewing your response, NRC

has determined that a violation of NRC requirements did occur. The Notice described that

the procedures for performing emergency diesel generator tests did not require operators to

monitor the governor oil level after start of the emergency diesel generators, which was

contrary to avai!able guidance. in your response, you indicated that no violation occurred

because your staff had established requirements for verifying the governor oillevel as

required by Regulatory Guide 1.33, Revision 2, Section D.4. Specifically, operators verified

the governor oil level prior to start of the emergency diesel generators. Further, your

response indicated that you relied on the emergency diesel generator wndor for guidance

and did not contact the governor vendor for guidance but would have expected the

emergency diesel generator vendor to do so. Af ter contacting the governor vendor, your

staff determined that governor oil should be routinely verified during operation of the

emergency diesel generator.

As specified in NRC Inspection Report 50-416/96-11,NRC considered the procedures

inappropriate to the circumstances and a violation of 10 CFR Part 50, Appendix B,

l

Criterion V. Further, contrary to the implications in your violation response, meeting the

intent of Technical Specification 5.4.1.a (Regulatory Guide 1.33, Revision 2, Section D.4)

for establishing a procedure does not eliminate the requirement in 10 CFR Part 50,

Appendix B, Criterion V to have procedures appropriate to the circumstances. The

inadequate procedure resulted because your staff had not taken actions to resolve

conflicting information between the procedure guidance and the information posted on the

governor until questioned by the inspectors. Specifically, although not directly available

from the standby diesel generator vendor, your engineering staff had documentation

available other than the sticker related to maintaining the proper governor oillevel from the

governor vendor. The information from the governor vendor indicated that the oil level

should be maintained at the sight glass scribe mark with the engine operating, whereas

your procedures required ensuring the oil level was at the mark with the engine secured.

Since your operating procedures did not specify the correct conditions for ensuring proper

f

l

oil level in the governor, NRC determined that the procedures were not appropriate to the

I

circumstances.

'

i

l

9610150117 961009

PDR

ADOCK 05000416

G

PDR

4

Entergy Operations, Inc.

-2-

We note that the corrective actions included in your response letter adequately address

this deficiency, so no additional response is necessary.

Sincerely,

1

..

. P. Gwynn, Act' g

Deputy Regional

inistra or

Docket No. 50-416

License No. NPF-29

,

cc.

Executive Vice President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

'

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, Mississippi 39205

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, D.C. 20005 3502

Sam Mabry, Director

Division of Solid Waste Management

Mississippi Department of Natural

Resources

P.O. Box 10385

Jackson, Mississippi 39209

President

Claiborne County Board of Supervisors

Port Gibson, Mississippi 39150

Mr. Rod Rogers 6B-7

Bechtel Power Corporation

Nuclear Operating Plant Services

9801 Washington Boulevard

Gaithersburg, Maryland 20878-5356

._-

_

.

Entergy Operations, Inc.

-3-

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

The Honorable William J. Guste, Jr.

Attorney General

Department of Justice

State of Louisiana

'

P.O. Box 94005

Baton Rouge, Louisiana 70804-9005

Office of the Governor

State of Mississippi

Jackson, Mississippi 39201

Mike Moore, Attorney General

Frank Spencer, Asst. Attorney General

State of Mississippi

P.O. Box 22947

Jackson, Mississippi 39225

Dr. F. E. Thompson, Jr.

1

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, Mississippi 39205

Eddie S. Fuente, Director

State Liaison Officer

Division of Radiation Health

Mississippi Department of Health

P.O. Box 1700

l

Jackson, Mississippi 39215-1700

Vice President

'

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

_ _ _ ,

,_

_

_

.

_

_

___

_

._

_ _ .

_

.

.

____

_

. _ .

_ _ _

.

Entergy Operations, Inc.

-4-

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

Vice President, Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

I

P.O. Box 756

Port Gibson, Mississippi 39150

l

1

l

l

i

1

l

l

i

I

l

. _ _ _._____

_

_ _ _ _ .

_._ __ . _ _ . . .

_

_ ___. - . _ . _

__

_ . _ . _ - . _ _ _ _ .

__

.

4

0CT

9 1996

'

Entergy Operations, Inc.

-4-

4

)

bec to DMB (IE01)

l

bec distrib. by RIV:

L. J. Callan

Senior Resident inspector (River Bend)

"

.

DRP Director

DRS-PSB

l

Bronch Chief (DRP/D)

MIS System

'

Project Engineer (DRP/D)

RIV File

l

Branch Chief (DRP/TSS)

Leah Trernper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector (Grand Gulf)

.

i

,

.

4

1

1

,

DOCUMENT NAME: R:\\_GG\\GG611

. JET

To receive copy of document, indicate in box: f = Copy without en% res

"E" = Copy with enclosures "N" = No copy

c

PE:DRP/D

C:DgP/}gff

D:DRP

ADRA

Y

GAPic,k;chf/

PHHaW f

JEDyer M

TPGwynn

/O

1

09/W96

/0 / 9, @6

/o/7 /96

10/ 9 /96'

'

OFFICIAL RECORD COPY

_ _ . _ - . _

. _ _ . .

. _ _ _ _ . _ . _ . _ _ . _ . . . _

_ , _ _ _ _

_

_ . . . _ . _ _ _

. . - _ _

__

_ _ _

-

e

'

OCT

9 1996

Entergy Operations, Inc.

-4-

AccIl._-._ _o DMB (IE01):

__

bec distrib. by RIV:

L. J. Callan -

Senior Resident inspector (River Bend)

DRP Director

DRS-PSB

Branch Chief (DRP/D)

MIS System

Project Engineer (DRP/D)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

Resident inspector (Grand Gulf)

i

l

1

)

i

.

,

i

DOCUMENT NAME: R:\\_GG\\GG611

. JET

To receive copy of document, indicate in box: gc = Copy without enc stres "E" = Copy we enclosures "N" = No copy

PE:DRP/D

C:DKP/hff

D:DRP

ADRA

Y

'

GAPic,k;ch'l

PHHa g/"

JEDyer W7

TPGwynn

/W

1

09/J y96 ~

/0 / h @6

/o/7 /96

10/ 9 /96'

'

OFFICIAL RECORD COPY

150023