Fourth Interim Deficiency Rept NCR 3102 Re Use of Incorrect Adaptors on Instrumentation Lines.Initially Reported on 840510.Field Verification Completed.Three Adaptors Determined Unacceptable.Next Rept Expected by 851018
ML20133P080
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/02/1985
From: Hufham J
TENNESSEE VALLEY AUTHORITY
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NCR-3102, NUDOCS 8508140134
Download: ML20133P080 (1)


Text

TENNESSEE VALLEY AUTHORITY CHATTANOOGA TENNESSEE 37401 1630 Chestnut Street Tower II o"

July 2,'1985 BLRD CO-438/84-35 5:

BLRD-50-439/84-32 r-to U.S. Nuclear Regulatory Commission Region II

7 Attn:

Dr. J. Nelson Grace,' Regional Administrator

~~

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Dear Dr. Grace:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - USE OF INCORRECT ADAPTORS ON INSTRUMENTATION LINES - BLRD-50-438/84-35, BLHD-50-439/84 FOURTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE -Inspector P. E. Fredrickson on May 10, 1984 in accordance with 10 CPR 50.55(e) as NCR 3102. This was followed by our interim reports dated June 4 and September 21, 1984 and February 25, 1985. Below is our. fourth interim report. We expect to submit our next report on or about October 18, 1985.

Interim Progress TVA has completed a field verification of the subject' adaptors and has determined that in all but three instances the adaptors used are acceptable as-is. The three' exceptions are in system CF (feedwater) and sequence control chart (SCC) 1CF-I401 has been generated for their replacement.

The special stamps to be used.for adaptor schedule identification have not yet been received by the site, so marking the adaptors has not begun.

If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

l Very truly yours,.

TENNESSEE VALLEY AUTHORITY' 8508140134 e50 j38 M

DR ADOCK O PDR

. W. Hufham, Manager Licensing and Risk Protection l

cc: Mr. James Taylor, Director

~

Office of Inspection and Enforcement.

U.S. Nuclear Regulatory Commission l.

Washington, D.C.

20555 i

Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500

. Atlanta, Georgia 30339 An Equal Opp niunity Employer

[

--