ML20133M934

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-414/85-27 on 850722-26.No Violations or Deviations Noted
ML20133M934
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 08/08/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20133M937 List:
References
NUDOCS 8508130318
Download: ML20133M934 (2)


See also: IR 05000414/1985027

Text

_

O

I

hOY

.

.A

AUG 0 8 889

Duke Power Company

/ ATTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT:

REPORT NO. 50-414/85-27

On July 22-26, 1985, NRC inspected activities authorized by NRC Construction

Permit No. CPPR-117 for your Catawba facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

-in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Mc. Bluo

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-414/85-27

c.c w/ enc 1:

vit. L. Dick, Vice President - Construction

ud. W. Hampton, Station Manager

bec w/ encl:

(see page 2)

.

l

8508130318 850808

PDR

ADOCK 05000414

G

PDR

~

!

I

I ZEol

l

-.

__

. <>

<

e

.

.

Duke Power Company

2

AUG 0 81985

i

bcc w/ encl:

Johnson, ELD

.

. N. Jabbour, NRR

Document Control Desk

State of South Carolina

,

a

h

l

  • a

i

'

RII

RII

RII

RII

Y

YY

ARft

i

erdt

VLBrownlee

MThomas:lb

FJape

/f/85

8/p/85

8/6 /85

8/ /85

'

i.

L.