ML20133M934
| ML20133M934 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 08/08/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20133M937 | List: |
| References | |
| NUDOCS 8508130318 | |
| Download: ML20133M934 (2) | |
See also: IR 05000414/1985027
Text
_
O
I
hOY
.
.A
AUG 0 8 889
Duke Power Company
/ ATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT NO. 50-414/85-27
On July 22-26, 1985, NRC inspected activities authorized by NRC Construction
Permit No. CPPR-117 for your Catawba facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
-in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Mc. Bluo
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-414/85-27
c.c w/ enc 1:
vit. L. Dick, Vice President - Construction
ud. W. Hampton, Station Manager
bec w/ encl:
(see page 2)
.
l
8508130318 850808
ADOCK 05000414
G
~
!
I
I ZEol
l
-.
__
. <>
<
e
.
.
Duke Power Company
2
AUG 0 81985
i
bcc w/ encl:
Johnson, ELD
.
. N. Jabbour, NRR
Document Control Desk
State of South Carolina
,
a
h
l
- a
i
'
RII
RII
RII
RII
Y
YY
ARft
i
erdt
VLBrownlee
MThomas:lb
FJape
/f/85
8/p/85
8/6 /85
8/ /85
'
i.
L.