In Reply Refer To:
OCT U M
Dockets:
50-445/85-11
50-446/85-06
Texas Utilities Generating Company
ATTN:
Mr. W. G. Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Mr. T. F. Westerman and other
members of the Region IV Comanche Peak Group during the period
June 22-August 31, 1985, of activities authorized by NRC Construction
Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station
(CPSES), Units 1 and 2, and to the discussion of our findings with
Messrs. R. E. Camp and J. C. Kuykendall, and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included operations, construction, and
Comanche Peak Response Team activities. Within these areas, the inspection
consisted of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
These findings
are documented in the enclosed inspection report.
During this inspection, it was found that one of your activities was in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
During this inspection, it was found that certain of your activities appeared
to deviate from commitments made to the NRC.
These items and references to the
commitments are identified in the enclosed Notice of Deviation.
You are
requested to respond to these deviations in writing.
Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter. As part of your response to Item A in the Notice of Deviation, please
identify all members of the Comanche Peak Response Team (CPRT) and Senior Review
Team with previous CPSES involvement, along with the documented evaluation which
sets forth the basis for acceptance of their objectivity as defined in
Section VII of the CPRT Program Plan.
Two unresolved items are identified in paragraphs 3 and 5.h of Appendix E of
the enclosed inspection report.
TA
l
RIV:CPSES
C:CPSESf
D:DRSP
D:CPP
b
i
IBarnes/1w
TFWesterman
RPDenise
VSNoonan
X li /85
n / if /85
p / /85
j? / N/85
8510200217 851011
DR
ADDCK 050
5
I
,
Texas Utilities Electric Company
-2-
We have also examined actions you have taken with regard to previously
identified operations inspection findings.
The status of these items is
identified in paragraph 2 of Appendix C of the enclosed inspection report.
The responses directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Origina! Signed Dy:
Rkhard P. 0cn63
R. P. Denise, Director
Division of Reactor Safety
and Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - Notice of Deviation
3.
Appendix C - NRC Operations Inspection Report
50-445/85-11
4.
Appendix D - NRC Construction Inspection Report
50-445/85-11
50-446/85-06
5.
Appendix E - NRC Comanche Peak Response Team Activities Inspection Report
50-445/85-11
50-446/85-06
cc w/ enclosures:
Texas Utilities Electric Company
ATTN:
J. W. Beck, Manager,
Licensing
Skyway Tower
400 North Olive Street
Lock Box 81
Dallas, Texas
75201
Texas Radiation Control Program Director
. - - -
- - - - -
-,
..
.=
-
- _ _
. . - - . -.
.
-. .-
.-
_
_
.
.
.
.
,
,
bcc to DMB (IE01)
,
bec distrib. by RIV:
- RP8
- MIS System
4
- RRI-OPS
- RSTS Operator
- RRI-CONST
- R&SPB
- T.
F. Westerman, CPTG
R. Denise, D/DRSP
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD
Juanita Ellis, Pres.- CASE
J. Taylor, IE
Renea Hicks, A/ Atty General, EP Div.-TX
R. Heishman, IE