Text

-.=

'?b 1

s.

4d VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO.

R r,-0 8 APPROVED BY:

///M_

~ STATION MANAGER 8510010643 850731 PDR ADOCK 05000200 R

pg j.

a

(

i i

5 m.

s e

Section Page Operating Data Report - Unit #1 1

Operating Data Report - Unit #2 2

Unit Shutdowns and power Reductions - Unit #1 3

Unit Shutdowns and Power Reductions - Unit #2 4

Load Reductions Due to Environmental Restrictions - Unit #1 5

Load Reductions Due to Environmental Restrictions - Unit #2 6

Average Daily Unit Power Level-Unit #1 7

Average Daily Unit Power Level-Unit #2 7

Summary of Operating Experience 8 - 12 Amendments to Facility License or Technical Specifications 13 Facility Changes Requiring NRC Approval 14 Facility Changes That Did Not Require NRC Approval 14 Tests and Experiments Requiring NRC Approval 15

~

Tests and Experiments That Did Not Require NRC Approval 15 Other Changes, Tests and Experiments 16 Chemistry Report 17 Description of AllInstances Where Thermal Discharge 18 Limits Were Exceeded Fuel Handling 19 - 20 Procedwe Revisions 'Ihat Chunged the Operating Mode 21 Described in the PSAR Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 22 I

I I

i

.a 6 8 s

a Section Page Operating Data Report - Unit #1 1

Operating Data Report - Unit #2 2

Unit Shutdowns and power Reductions - Unit #1 3

Unit Shutdowns and Power Reductions - Unit i2 4

Load Redactions Due to Environmental Restrictions - Unit #1 5

Load Reductions Due to Environmental Restrictions - Unit #2 6

Average Daily Unit Power Level-Unit #1 7

Average Daily Unit Power Level-Unit #2 7

Summary of Ope ating Experience 8 - 12 Amendments to Facility License or Technical Specifications 13 Facility Changes Requiring NRC Approval 14 Facility Changes That Did Not Require NRC Approval 14 Tests and Experiments Requiring NRC Approval 15 Tests and Experiments That Did Not Require NRC Approval 15 Other Changes, Tests and Experiments 16 Chemistry Report 17 Description of AllInstances Where Thermal Discharge 18 Limits Were Exceeded 1

Fuel IIandling 19 - 20 Procedure Revisions That Changed the Operating Mode 21 Described in the FSAR Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 22 I

I e

s s

Section Page Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Mechanical Maintenance 23 - 24 Maintenance of Safety Related Systems Dura.g Outage or Reduced Power Periods - Unit # 2 - Mechanical Maintenance 25 - 28 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1-Electrical Maintenance 29 - 31 Maintenance of Safety Related Systems During Outage or Reduced Power Feriods - Unit # 2 - Electrical Maintenance 32 & 33 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1-Instrument Maintenance 34 - 36 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 -Instrument Maintenance 37 - 39 4

l 1

i l

Page1 g9 AT*m"I 5 Page 1 of 3 OPEFATING DATA REPORT TEB 0 5 84 D00KET NO. 50-280 DATE oe-os-es COMPLETED BT V. Jones OPERATING STATUS TELEPHONE (R04)357-3184 1.

Unit Name: Surry Unit 1 Notes 2.

Reporting Period:

07-01-85 to 07-31-85 3.

Licensed Thornal Power (MWt): ?441

'4 Nameplate Rating (Gross Wel:

847.s 5.

Design Electrical Rating (Not MWe):

788 6.

Mar 4== Dependable Capacity (Gross MWe):

non 7.

Maxim m Dependable Capacity (Net W e):

791 6.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Leval To Which Rastricted. If Any (Net We):

10. Reasons for Restrictions, If Any:

This Month Yr.-to-Date Cummulative

11. Rours'In Reporting Period 744_0 5087.0 110519.0
12. Number of Hours Reactor h Critical 744.0 4671.8 69048.5
13. Raactor Reserve Shutdown Ecurs 0

0 3774.5 14.

Bours Generator On-Line v a _t n 4 sat _1 67640.4

15. Unit Reserve Shutdown Bours 0

0 3736.2 16.

Gross Thersal Energy Generated (WE) 1729522.1 10714929.7 156729106.8 l

17. Gross Electrical Energy l

Generated (MWE) 557525.0 35606RO.0 50412643.0 18.

Net Electrical Energy Generated (MWE)

$27526.0 3383984.0 47795828.0

19. Unit Service Factor inn nm at nm n1_n l

20.

Unit Available Factor inn nm 91_0m s 4.s%

, 21.

Unit Capacity Tactor i

(Using HDC Net) 9 0. 8 %.

RS.2%

55.4 %

1 22.

Unit Capacity Tactor (Using DER Net) 90.0 %

R 4.4 %

54.9 %

23.

Unit Forced Rate 0

2.3%

19.4%

24.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

25.

If Shut Down At End Of Report Period Estimated Date of Startup 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved DTITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)

L

Page 2 i

ADM-49 1

4 ATTACHMENT 5 l

Page.1 of 3 OPERATINO DATA REPORT

@ 0I E D00 KIT NO. 5n-991 DATE,.......

COMP 1.ETED BY v.Jnnes NHONI(8 n4)357-3184 OPERATINO STATt!S t

1.

Unit Name:

Sorry Unit 2 Notas 2.

Reporting Period:

07-01-85 to 07-31-85 l

3.

Licensed Thermal Power (MW:):

2441 4

Nameplate Rating (Gross MWa),:

847.5 5.

Design Electrical Rating (Nat E e): 788 6.

Maximum Dependable Capacity (Gross MWe):

811 7.

Mar 1=un Dependable Capacity (Nat MWa):

77s 8.

If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Laat Report, Give Reasons:

N/A 9.

Power Level To Which Rastricted, If Any (Net MWa):

10. Raasons For Restrictions, If Any:

This Month Tr.-to-Date Cummulative

11. Bours in Raporting Period 744.0

- 5087.0 107399.0

12. Number of Ecurs Raactor Was Critical 744.0 2718.9 68725.1
13. Reactor Rasarvc Shutdow: Ecurs 0

0 328.1 14.

Ecurs Ganerator On-Line tw n os an A 675s4.1

15. Uni: Reserve Shutdown Bours n

0 0

16.

Gross Thermal Energy Generated (MWE) 1918981.3 5? n32 R4.2 1577016R9.5 a

17. Gross Electrical Energy l

Generated (MWE) 38 3? R 5.0 1 R13690.0 51104164.0

18. Net Ilactrical Energy Generated (MWE) 357484.0 1713927.0 48430369.0
19. Uni: Service Factor 98.4 %

S 2.0 %

62.9 %

20.

Uni: Available Factor 98.4 %

52.0 %

62.9%

.21.

Uni: Capacity Tactor (Using MDC Net) 62.0 43.5 58.2 22.

Uni Capacity Factor (Using DER Net) 61.0 %

42.8 %

57.2 %

23. Unit Forced Rate 1.6 %

1.0 %

14.0 %

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duratio: of Each):

i

%,%,. nt o r n +.n o nno. i n_ t i _n c i n ao t..

25.

If Shut Down At End Of Repor: Period Estimated Data of Startup:

26. Units In Test S:stus (Prior to Commercial Operation):

Forecast Achieved DTITIAL CRIT 1f3LIIT INITIA1,ELECLtICITY C0tMNTAT. OP72ATION (9/77)

-.---~ -

.o I'OCKET NO.

50-280 UNIT SilUTI)OWf45 AND ROWER REDUC 1 TONS UNIT NAME surry I on-os-es

  • DA1E CWFLETEp p V.H.

J-a REPORT MONIll aniv. ions 1El.ErtlHNE f804 Ms7 tin 4

.IE 3

s y Licensee

{ *,,

"k 5

u Cause A Correceive N".

D*8' h

j$

5 sw:

Event

'p Actlim to F

oE j 65 Repost #

6 O u

p,,,,,,g,,,,,,,,,

85-9 07-20-85 S

0.0 H

1 Unit power was decreased to 754, 550MW's to allow cleaning of waterboxes.

85-10 07-27-85 S

0.0 H

I Unit power was decreased to 80%; 580 MW's to allow cleaning of waterboxes.

./

s I

2 3

4 T: Imced Reason:

Method:

Enleibit G. Instrucilims 5: Scheduled A-Eigvipment Tslieve(Emplain) 1.Manuel foe Feersession of Data 5-Maineenence of Test 2-Mannel sesem.

Entry $heets for I.lcensee e

v C. Refueling 3-Aasimistic Seesm.

Event Repw (LER)rifeINURLG.

4 D-Regelstoey Restsletlem 4Ohes (Emplain) 0161) o ca E-Opeestav Tosining & themse Eneminathm 5

F.Adadalstestive Eshlble I-5sme Simese G-Opeeselonel Eseue (Emplain) t*8/77) 11 Other (Emplain) n

IM)CKET NO.

50-281 UfitiSilullN)WNS AND FOWER REDUCIH)NS ilNIINAME surry If y

  • IDA1E as-en-as

"^ "~

^"

".'i FI.EpilONE REFORT MONill Julv. 1995 ranai w>-1194 i

"h

,$y

  • Ij I kentee

{4

t Cause A Conecilve Nie.,

Date k

Eg

) j ac Event gg Action fo f

3I j gi Repmt #

=>t' hevent Reemsence f-o i

85-3 07-08-85 F

12.0 A

1 The generator was taken off the line to balance,the turbine dde to high vibra-tions. Cause of vibrations not known i

at this time.

85-4 07-11-85 F

0.0 li 1

Power was reduced to 20%, 100MW's due tc chemistry going out of specs., when

/

attempting to flow the HPD pumps to the steam generators.

1 i

1 I

2 3

4 i~

F: Fmced Ressim:

Methoil:

Ealiabit G Ininsucilons 7

5: Scheduled A-Eileipment Teilene(Espisia) 1-Manuel ros riepsiselim of Ds s B. Maintenance ci Test 2-Manual Sessm.

Entry Sheets for I.leemee u

C. Refueling 3-Autom=Ile Scism.

Event Repine (LER)Iile GNUltrG.

D-Regelstony Resetlesion 4Ohes (Espishi) 0161)

E4)paratoe Tosining A 12 cense Essadastkm 5

F Adadmisensti e Exhibit !- Sanae Simece G-Opesselonel Euw (Esplein) l'8/77) llaher (Esplaint

Pzge 5 t

LOAD REDUCTIONS DUE TO E!WIRONMENTAL RESTRICTIONS UNIT NO. 1 MONTH: July - 1985 DATE TIME HOURS LOAD, W REDUCTIONS, W WH REASON NONE THIS R7: PORTING PERIOD j

l l

MONTHLY TOTAL

[.

l

g s

'I Page 6 LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. ?

MONTH: Juiv - 1995 DATE TIME HOURS LOAD, S' REDUCTIONS, 5' ET REASON NONE THIS REPORTING PERIOD MONTHLY TOTAL.

+

VEPCO AVERAGE DAILY UNIT POWER LEVEL SURRY POWER STATION

=

~

REPORTING MONTII' JULY,1985 DOCnEI NO.

50-280 00LK El NU. '0-2H1 DATE

' U GU (, I 1

!985 CUMPLETED 14Y.

V.

JONE5 ud 1 i ON E U N

.l.

T T wC AVEkauE DAILY POWtR LEVtL A VER ALE D AILY PUWEd LEVEL

') AY

-MWL-N;I-

-HWE-NCT-1 16 6 >

10749 2

(6549 149/5 3

161 1 257.'O 4

154 4

?SRs0 5

152. 0 793 1 6

(55 9 499.'O 7

161.0 331.1

>8 160 9 H6.1 9

l '+ >. I T0 4-. 5 10

( 6 c '. l 13A.%

11 153 d 7o743 12 IS I. a

31. e 13 14 ) o 2 3 7.'?

14 150,1 36

.3

.15 140.*

369.'5 16 l'* O '+

4 18.*9 17 14 l. J 5>1.6 18

. II l. U.

f>57 45 19 I3o O di 6 4.* O 20 563..O A o.,o r

i 21 043 o b (0.')

22.

. OM 4 793.'1 23 -

OBd.o 7 2 7.'2 24 13c.Y 815th 25 o80.3 7,,3.7.

26 05 l 9

.e eo9so 27 561.9 7atg) 28 553.0 734/2 29 538 I 1

793//

30 of I 9 7-3 9 / 7 31 144.6 734.5 i

Page 8 i

y*

SUMMARY

OF OPERATING EXPERIENCE UNIT 1 MONTil/ YEAR JULY - 1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents!

07-01-85 0000 This reporting period begins with the unit at 100%

power,810 M W's.

07-13-85 0415 Commenced rampdown for load follow.

0507 llolding power at 88%,700 MW's:

0520 Commenced power increase at 3%/hr.

1005 Unit at 100%,800 MW's 07-18-85 0151 Commenced rampdown to clean waterboxes.

0318 llolding power at 88%,660 MW's-0613 Commenced power increase at 3%/hr.

1024 Unit at 100%,790 MW's.

07-19-85 2215 Commenced rampdown to clean waterboxes.

07-20-85 0155 IIolding power at 75%,550 MW's:

1130 Commenced power increase at 3%/hr.

1530 llolding power at 88%, 645 MW's, holding power due to lack of circulators Only six running.

07-22-85 1427 Increased power to 90%,700 MW's:

I 07-23-85 0932 Declared an Unusual Event due to an uncontrolled gas-release via the process vent system. Terminated, Unusual Event af ter NRC notification 1450 Commenced power increase at 3%/hr.

2005 Unit at 100%,775 MW's: Unit is at reduced output l

due to the throttling of waterboxes to maintain canal level.

07-24-85 2211 Commenced rampdown to clean waterboxes.

2337 IIolding power at 87%,670 MW's; 07-25-85 0455 Commenced power increase at 3%/hr.

0930 Holding power at 94%,740 MW's:

07-27-85 0242 Commenced rampdown to remove "A" waterbox from service to plug a condenser tube leak.

0414 Holding power at 80%,580 MW's:

.m_...

Page 9 p

1 SUMM ARY OF OPERATING EXPERIENCE (continued)

MONTH / YEAR JULY - 1985 UNIT 1 07-30-85 0449 Commenced power increase at 5%/hr.

l 1655 Unit at 100% power,790 MW's.

j 07-31-85 2400 This reporting period ends with the unit at 100% power, 790 M W's.

t i

i 1

f l

I i

L i

n I

1.

I l

Page 10.

SUMMARY

OF OPERATING EXPERIENCE UNIT 2 MONTH / YEAR JULY - 1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

07-01-85 0000 This reporting period begins with the unit at 27 %

power,140 MW's, holding for chemistry.

07-02-85 1149 Commenced power increase at 3%/hr.

1 2238 Holding power at 45%,280 MW's for chemistry.

07-05-85 1227 Commenced power increase at 3%/hr.

1241 Holding power at 50%,340 MW's.

07-06-85 1504 Commenced power increase at 3%/hr.

2001 Holding power at 67%, 460 MR's due to high turbine

~

vibrations 07-07-85 0906 Commenced rampdown due' to increasing turbine vibrations.

1035 Holding power at 50%,320 MW's.

2223 Commenced rampdown to balance turbine.

07-08-85 0054 Generator breakers opened.

1257 Generator breakers closed, increasing power at 3%/hr.

1328 Holding power at 30%,170 MW's for chemistry.

2032 Commenced power increase at 150 MW/hr.

2132 Reduced the rate of power increase to 3%/hr., Unit at 47% power,290 MW's:

07-09-85 0405 Holding power at 63%,435 MW's for chemistry.

07-10-85 0400 Commenced rampdown for load following.

0447 Holding power at 47%,300 MW's; 0516 Commenced power increase at 3%/hr.

0600 Holding power at 57%,380 MW's.'

07-11-85 0509 Commenced power increase at 3%/hr.

t l

0912 Holding power at 70%,520 MW's:

l 07-11-85 1107 Commenced rampdown for chemistry.

Chemistry I

went out of spec., after flowing.HP drain pump to the steam generators.

l

Page 11 A.

SUMMARY

OF OPERATING EXPERIENCE (Continued)

UNIT 2 MONTH / YEAR,iULY - 1985 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.

1831 Holding power at 20%,100 MW's.

07-12-85 0102 Commenced power increase at 150 MW/hr.

0145 Holding power at 29%,170 MW's.

07-13-85 0800 Commenced power increase at 3%/hr.

1845 Holding power at 61%,400 MW's.

07-16-85 0027 Commenced power increase at 3%/hr.

0314 Holding power at 63%,485 MW's.

0715 Commenced power increase at 3%/hr.

0901 Holding power at 70%,535 MW's.

2144 Commenced power increase at 3%/hr.

l 2345 Holding power at 76%,585 MW's.

07-17-85 1820 Commenced power increase at 3%/hr.

2300 Holding power at 83%,650 MW's.

07-18-85 1045 Commenced power increase at 3%/hr.

1322 Holding power at 92%,~ 715 MW's.

07-20-85 2207 Commenced rampdown to clean waterboxes.

2315 Holding power at 80%,610 MW's.

l 07-21-85 0720 Commenced power increase at 3%/hr.

1450 Unit at 100% power,775 MW's.

07-23-35 1445 Commenced rampdown at 3%/hr for chemistry.

1800 Holding power at 90%,720 MW's.

07-24-85 0237 Commenced rampdown at 150 MW's/hr for load following.

0310 Holding power at 79%,630 MW's.

Page 12 p

SUMMARY

OF OPERATING EXPERIENCE (continued)

UNIT 2 MONTH / YEAR JULY - 1985 Listed below in chronological sequence by unit is a summary of operting experiences for this month which required load reductions or resulted in significant non-load related incidents.

07-24-85 0332 Commenced power increase at 150 MW/hr.

0424 Holding power at 90%,720 MW's.

0255 Commenced power increase at 3%/hr.

07-25-85 0207 Unit at 100%,790 MW's.

2110 Commenced rampdown at 150 MW/hr., lost cirulator at low level.

2310 Holding power at 93%,730 MW's.

07-27-85 1047 Commenced power increase at 3%/hr.

1122 Holding power at 96%,755 MW's.

07-28-85 1643 Commenced power increase at 3%/hr.

I 07-29-85 0024 Holding power at 99%, 770 MW's, due to OTAT Channel I alarming.

07-31-85 2400 This reporting period ends with the unit at 99% power, 770 MW's holding do to OTAT ChannelI setpoint.

l 1

Page 13 AMENDMENTS TO FACILITY LICENSE OR TECHNICAL SPECIFICATIONS JULY - 1985 NONE THIS REPORTING PERIOD l

^

A 4

6 h

7 l

l i-1 l

r-'

Pzge 14 FACILITY CHANGES REQUIRING NRC APPROVAL JULY - 1985 NONE THIS REPORTING PERIOD FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL DC-83-22 Capping of RCP Test Connection Unit 1 The Reactor Coolanti ' Pumps were originally supplied with a test connection between the number 1 and 2 seals.

This design change cut the test connection lines and welded caps on them to eliminate a potential leakage problem.

SUIGULRY OF SAFETY ANALYSIS 4

The modification has no adverse safety implications because it only reduces the chance of a Reactor Coolant leak.

O 9

Page 15 o

TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL JULY - 1985 NONE THIS REPORTING PERIOD TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL UNIT 2 ST-171 Rockwell Globe Valve Operability Test.

,e ST-172 Inspection of Steam Generator 2-RC-E-1 A Weld No.1-6 ST-173 Inspection of Steam Generator 2-RC-E-1 A Weld No.1-6 ST-179 Subsequent Testing for Periodic Test 8.5A ST-180 Sebsequent Testing for periodic Test 18.2A and 18.2B

Page 16 OTIIER CHANGES, TESTS AND EXPERIMENTS JULY - 1985 NONE THIS REPORTING PERIOD i

PG 2E-06 Page 17 VIRGIrIA PG:IR SURRY PGS S~_A':'IO!

~

C!DIIS~RY PZPORT July 19 85 PPldnRY C02R7r

  • 2 REYSIS MAXIFDi MDSIE AVE 2U E J

5" IFD1 MIFSa' AVER 72 Gross Radioact., uCi/ral 1.29 7.19E-1 1.04 9.65E-1 1.06F.-2 9.053-2 Susce:xied Solids, c:rn 0.0 0.0 0.0 0.0 0.0 0.0 3ross Trititr., uCi/:nl 3.89E-12.40E-1 3.00E-1 6.94E-2 2.16E-2 4.34E-2 Iodine

, UCihnl 5.61E-2:2.31E-2 3.04E-2 2.72E-4 3.25E-5 1.14E-4 I 13/I 131 0.55

.0.35 0.43 0.14 0.14 0.14

~ Hvdrocen, cc/kc 40.4 26.1 31.1 49.8 27.2 33.9

  • ithitzn, c:2n 1.17 0.83 1.04 2.12 1.47 1.75 Ebron-10, c:ra*

llo 99 105 230 166 193 Oxvcen, (D.O. ), can 0.005 0.005 0.005

.0.005-0.005 0.005 Chloride, can 0.010 0.010 0.010 0.010

'O.010 0.010 oH @ 25'C 6.43 6.30 6.38 6.29 6.02 6.20

  • Scron-10 = Total Baron x 0.196 1

ED72KS: Unit 1: Cat bed placed in service on 7/7 and 7/15 for LiOH removal.

Ramped down to 90% power on 7/25 due to loss of circ H2O pump.

Load follow on 7/27 down to 78% and remained at that level until 7/30 when they began ramping up at 5%/hr. On 7/30 - unit at 100% power.

Unit 2: Cat bed placed in service on 7/4, 7/10, 7/18, 7/21 and 7/31 for LiOH re-moval. LiOH added on 7/8 and 7/11 (1090 gms total) to bring Lithium concentration to mid band.

Ramped down to 91% power on 7/25 due to loss of circ H2O pump. On 7/6 unit brought off line for turbine vibrations and began ramping back up on 7/8.

Slow ramp due to chemistry holds on secondary chemistry. Unit at 99% on 7/31.

y---

v.

~

m

DESCRIPTION OF ALL INSTANCES WIIERE THERMAL DISCHARGE LIMITS WERE EXCEEDED JULY - 1985 NONE THIS REPORTING PERIOD c

i i

e I

Page 19 FUEL HANDLING UNIT 4 1

1 JULY - 1985 w

i DATE NO. OF ANSI NO.

NEW OR SPENT FUEL j

SHIPPED / RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL NONE DURING THIS PERIOD 1

l l

l l

l i

l l

t

Page 20 JUEL HANDLING

'~ '

UNIT #

?

JULY - 1985 DATE NO. OF ANSI NO.

NEW OR SPENT FUEL SHIPPED ASSD1BLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL-07-05-85 3

LMO-2JP/3.11 %

Smr/hr 3

LMO-428 / 2.91 %

Smr/hr 3

LMO-254/3.11 %

Smr/hr 07-11-85 3

LMO-42C / 2.91%

Smr/hr 3

LMO-2JN / 3.11%

Smr/hr 3

LMO-42G / 2.91%

Smr/hr 07-16-85 3

LMO-2JJ/3.11 %

Smr/hr 3

LMO-416 / 2.91%

Smr/hr 3

LMO-41L / 2.91 %

Smr/hr l

. -.._.-_. ~

Page 21-

~

PROCEDURE REVISIONS THAT CHANGED THE -

OPERATING MODE DESCRIBED IN THE FSAR JULY - 1985 i

NONE THIS REPORTING PERIOD

{

i J

i r

l g

i l

l 1

[

i I

t i

J g

.H--..e.,

y-y ew--

- - - -, =

-ge c -

eyg--

ee

++ '-

-y-ed--,

,m--

g-~,

.u....-

e m-e.v.e w-

,me.-

aemy----+-

t-e-m-we--

-4

Page 22 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS JULY - 1985 NONE THIS REPORTING PERIOD m

5 I

Page 23 l

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS 1

I UNIT NO.1 MECHANICAL MAINTEN ANCE 1

i See the Attached 1

F i

I i

1

_m

,my

,_e__.,_

.e

- - =

...-_m_m_,_

Page 24 VEPCd. ' S$FETY RELATED IORING REICCED POWER E0 RED BY UNIT AND IEPARTriENT FROM 07/27/85 THRU 07/30/85

.i LHIT 01 SURRY RETURNED TO 43 IEPT SERVICE

. MARK HunBER nut $ER WO TITLE HISTORY

SUMMARY

0228 07/29/85 01-CH -P

-1A OM Z1NC FLUG MISSING INSTALLED ZINC FtVGS WITH ZINC RODS j

0228 07/30/85 01-BR -C

-1A 013226 REFtACE OIL SIGHT GLASS 3 IN3TALLED OIL EICHT GLASS

[

0228 07/30/85 01-BR -C

-1A 019668 DOES NOT FtPP AND DVER HEATS REFLACED 0-RINGS DIA%AGM.

INSTALL LNION IN DISCHAF.GE LINE 0228 07/30/85 01-GW -RM. -101 021 DRAIN WATER & DRY COMPONENTS FfNNED LID FROM PARTICLLATE MONITO R,AFPROXIMATELY 1/4" 0F WATER IN BOTTOM Or F ARTICULATE CHAMPER.IRIED OFF ALL COMPONENTS MONITOR IRY,0PS SAT.REFLACED FILTER PAPER 0226 07/30/85 01-GU -RN -102 022.?i2 DRAIN WATER & DRY OUT RADI-REMOVED IETECTOR FROM GAS CHAMBER, PIG FULL OF WATER. DRIED WATER FROM PIG LINES AND FtiMP. REMOVED ROTAMETE R AND DRIED SAME.HAD HP IECON PIG REFLACED IETECTOR MON DRY OPS SAT i

0220 07/30/85 01-MS -

-86 017659 PACKING LEAK ADJUST PACKING 0220 07/30/85 01-SW -P

-1B 022331 REMOVE VENT VALVE FROM 1-SW-P-iAREMOVED VENT VALVE FROM 1-SW-P-1A AND INSTM. LED ON 1-SW-P-1C.FtACED VALVE ON 1-SW-P-1C ON 1-SW-P-1C 4

E O

4 5

j

-+

Page 25 MAINTENANCE OF SAFETY RELATED SYSTEMS DURCiG OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MECHANICAL MAINTENANCE i

SEE THE ATTACHED 4-I i

Page 26 l

VEFCO, ' SEETY RELATED DURING REDUCED POWER SORTED 14 UNIT AND IEPARTMENT FROM 07/01/85 THRU 07/03/85 UNIT 02 SURRY

)

RETUFWED TO WO DEPT SERVICE MARK NUMBER NUMBER WO TITLE HISTORY

SUMMARY

0228 07/01/85 02-SD -

-1 021261 SLIGHT PACKING LEAN ADJUSTED PACKING i -0228 07/01/85 02-BD -

-11 021262 SLIGHT PACNING LEAK ADJUSTED PACKING 0228 07/01/95 02-CS -LT -200D 020535 CONSTRLCT FLANGE AND MOUNTING MFG DLANK AS FER EWR 85-278 0228 07/01/85 02-MS -

-120 019832 EXCESSIVE SEAT LEAAAGE, FAILS REFtACE VALVE 0228 07/01/85 02-RC -

-106 021260 PACKING LEAR.2 GPM ADJUSTED PACNING 0228~ 07/01/85 02-RC -

-39 021200 PACNING LEAh, 20 DROPS / MIN ADJUSTED FACKING 0228 07/01/85 02-Fr -

-42 021201 PACKING LEAN, 3 DROFS/SEC ADJUSTED PACKING 0228 07/01/85 02-RC -E

-1A 017161 REMOVE / INSTALL HANDHOLE COVERS REMNED 1,2,3,4 HAND HDLE FtuGS FOR SLUDGE LANCE REINSTALL 1,2,3,4 HAND HOLE PLUGS WITH NEW GASKETS 0228 07/01/85 02-RC -E

-1C 017159 REMOVE / INSTALL HANDHOLE COVERS 0F9ED AND CLOSED HAND HDLES 0228 07/01/85 02-RC -E

-1C 020098 MANwAY LEANS ON BOTH SIIES RET 0 ROUE hANWAY TO 500 FT/LBS 0228 07/01/85 02-RC -HCV -2557C 021200 PACKING LEAK, 1 DROP /SEC.

ADJUSTED PACKING 0228 07/01/95 02-RC -MOV -2590 021263 SLIGHT PACNING LEAN ADJUSTED PACKING 0228 07/01/85 02-SI -

-338 021203 PACKING LEAK, 3 DRW S/ MIN ADJUSTED PACKING 0228 07/01/95 02-SI -

-339 021204 PACKING LEAK, 3 DROFS/ MIN ADJUSTED PACKING 0228 07/01/85 02-SI -

-340.

021205 PACKING LEAK, 3 DROPS / MIN ADJUSTED PACKING 0228 07/01/85 02-SI -

-91 021259 LEANS, 12 DROPS / MINUTE 2-SI-91 IS A 6" CHECK VALVE DOES NOT HAVE PACKING GLAND.2-SI-91 WAS TIGHTENED ON ANOTHER WORK ORDER FOR TIGHTENING COVER PLATE i

0228 07/02/85 02-CH -P

-1B 021458 FEFtACE ZINC FtuG ON LO CLR INSTALLED 2 NEW ZINC FtUGS 0228 07/02/85 02-CH -P

-1C 021226 AUX LO FilMP DOES NOT PUMP OIL; REFtACED PUMP MIVE GEAR 0228 07/02/85 02-CV -P

-1A 021042 INVESTIGATE AND REPAIR AS REFLACED PUMD WITH FACTORY NEW F1JMP NECESSARY REFLACE MOTOR FtJLLY WITH NEW SHOP MANUFACTURED FilLLY Or LARGER DIA INSTALL NEW BELT.THESE FtNS NOW NE ED 38"X 1/2" BELT DAYC0 4L-380 0228 07/02/85 02-RO -HCV -2556C 011464 BODY TO BONNET LEAK DISCONNECTED AIR AND ELECTRICAL FRAMES FROM VALVE ACTUATOR LIFTED VALVE CLEANED CAGE VALVE AND BONNET REFLACED CAGE GASKET AND BODY TO BONNET GASKET TO 540 FT LBS RECONN 0228 07/02/85 02-RC -MISC-NA 010540 REPAIR AS NECES?ARY REPAIRED TOOLS AND EQUIPENT FOR REFLELING 0228 07/03/85 02-CS -C

-1A 000045 COMPRESSOR BROKEN WORK PERFORMED IS ATTACHED TO BACK OF THIS WORK ORIER.

i

Page 27 VEPCd. ' S[#ETY RELATED IURI@ FIDUCED POWER SORTED BY UNIT AND IFARTriENT FROM o7-or-es TEtl 07-ts-es UNIT 02 SURRY RETURNED TO WO IEPT SERVICE MARK NunIG HUhBER WO TITLE HISTORY

SUMMARY

i 0228 07/07/85 02-CH -P

-1A 021576 REFtACE BLOWN ZINC FtVG FIFtACED ZINC FtuGS 0228 07/08/85 02-SS -FV -2CG 021417 VERY MINOR PGDY TO BONNET LEAN TISHTENED BODY MJT AND CLEANED SURFACES i

0228 07/11/85 02-RC -MISC-A'B 019714 REMOVE 6 REINSTALL (WELD)

INSTALLED ISOLATOR 1311 AND VALVES AS FER WESTINGHOUSE 0228 07/12/85 02-RM -RR -200 021658 INK PAD NEEDS REFLACEMENT REPLACED INK PADS 0228 07/12/85 02-SI -MOV -2942 019732 INNER PACKING LEAN PREVENTING REPACNED VALW 0229 07/1 2 02-Mi -TCV -207B 014076 REMOVE & REPLACE INSLLATION INSLLATION REMOVED & REPLACED WITH A6BESTOS-FREE INGLA.ATION 4

' * ~

  • t i

l l

- ~..

VEPCO SAFETY RELATED DLRING REDUCED POWER SnRTED BY UNIT AND DEPARTMENT

' PAGE 28 FROM 07/20/85 Tmu o7-23-es

~

UNIT 02 SURRY RETIRED TO WO IEPT SERVICE MARK NUMBER HUMBER WO TITLE HISTORY SLMtARY 0228 07/20/05 02-CH -F

-1A 019404 F1)MP OUTBOARD BEARING HAS AN LEAK BETWEEN BRG AND END PLATE ON O!L LEAK OUTBOARD IftG REPLACE WITH GASKET.

REPLACE BEARING HOUSING END CAP GASKET ADD 1 1/2 GAL OIL TO GEAR-BOX SLMP.

RETURED TO WO DEPT SERVICE MARK NLMBER NUMBER WO TITLE HISTORY-

SUMMARY

0228 07/23/05 02-CW -PP.-N/A 020650 WELD PATCH TO REPAIR PIFE PATCED HOLES AND INSTALLED 1/4" FtATE ON PIPE AS PER EbR 85-352 i

0228 07/23/85 01-CH -P

-2C 022167' FAILED PT 18.9, ADJUST ADJUSTED IPPELLER CLEARANCE TO SPEC 7/22. PUMP PASSED PT WITH 105 PSI IMPELLER SRJT OFT EAD.

?

t 3

}

J e

1 i

i l

J l

l t

I

Page 29 4

P MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 ELECTRICAL MAINTENANCE SEE THE ATTACHED r

l l

l m

-,.-e

- _, -,w

W M

s SAFET7 RELATG DURING REDUCED POWER SORTED BV UNIT AND IEPARTMENT FR() GRAM IFT09860 08/07/05 9:53 FAGE 30 FRT.rt. 07-23-e9 TlftU 07/29/85 UNIT 01 SURRY RETtHED TO -

WO

.; DEPT SERVICE MARK HUMER NLfGER WO TITLE HISTORY

SUMMARY

t I

'0229 07/23/95 01-SW -MOV -105C 014228 VALVE FAILS TO TRAVEL CLOSED VOID AS FER HANSON J

4 1

l j

d 1

i i

[

a i -

i i

I i

i l

t i

i

.,, s Page 31

+

@ CO St#E*Y F.ELATG IGING FT.cCED FSU. 5%TD BY tMIT NO ICPAF,TriEhi FTdh 07/27/E0 TrEu 07/30/E5

t. NIT 01 - S'.!TJ:Y.

kETLF3G TO WO i

j

EPT CETNICE r.E h"#JER NL*.!ER WO TITLE HIFTORY SUt'MRY I

4 4

0229 07/30/85 01-SW -MISC-20 001307 VLV 0FtN LIGHT SWTICH BAD FSFLACED SWITCH.

4 g

1 4

L i

l.

i r

a T,

i '

W 1

6, 5

4 g.

'^:

$,+'

1 l k..

j I'.

b.r:. _

{

f 54N'.

b t.

I.

V, p

'l o

[i

+

l w.

i...

l f,,

f

\\',

4 m

J L

Page 32

, o o

4 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 ELECTRICAL MAINTENANCE SEE THE ATTACHED

Page 33 UEPCD SAFETY FELATED DLRIM; pmm F9WER SORTED BY LHIT AND DEPARTMENT 1

FROM 07/01/35 Tmtj 07-is-es UNIT 02 SLRRY RETLRPG TO WO DEPT SERVICE PK4 MMBER MUMBER WO TITLE HISTORY StkMARY 0229 07/02/85 02-BS - W -NA 007156 REPAIR ELECT LOCK IN 82 SFGD3 4/3/95 INSTALLED LOCK 11 RING 1ESTIN G FOUND THAT LOCK OPERATED IN.

FGERSE TROUGH CARD READERS.INSTRU MENT TECHS WILL CECK OUT SYSTEM 4/485 DOOR LOCK NOW WORKS SAT 7/2 0229 07/03/85 02-RM -FS -200A 020685 SUSPECT FALLTY SWITCH.

OFTRATIONS PERFORMED PT 17.7 STEP 5.7 PERFORMED SATISFACTORY NO FROBLEMS WITH TE FLOW SWITCH 0229 07/06/85 02-eft-MG -ROD 2 0136S8 PERFORM PROTECTIVE RELAY MAINT MEGGEREL,FERFORED RELAY MAINTENANC E TESTED RELAYS OPERATIONAL CECKED CHANGED FUSES.SY-05790/PART 446033

93. SYO5790/PART #4603395 SY-07626/032549 0229 07/12/95 02-CH -fCV -2114B 021687 INDICATES INTEREDIATE' AD ESTED LIMIT SW CYCLES OK 7/11/85 0229 07/12/85 02-fW -P

-3B 016631 CECK EATERS ON 2-FW-P-3B REMOVED BAD EATER FROM MOTCR (ND STOCK ITEM) EATER ORDERED 3/25

/95.REFtACED DEFECTIVE EATER TEST SAT.

0229. 07/12/95 02-HS -HTT -2A3 017935 BOTN 'UT' & 'OT' LIGHTS ON ALARM WAS CLEARED 2A3 CKT 15 l

l

Page 34 MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 INSTRUMENT MAINTENANCE SEE THE ATTACHED l

l t

y i

W.PCO SAFETY RELATED DURING REDUCED POWER SORTED BY UNIT AND IEPARTMENT PAGE 35 FR0h 07/23/85 Tmu 07-26-83

,e e

UNIT 01 SLERY RETURNED TO WO DEPT SERVICE MAF0K NUMBER HUMBER W3 TITLE HISTORY

SUMMARY

0237 07/23/85 01-NI -DETR-31B 021488 NI-31 INDICATING if40 CPS.

VOID SUSFECT NOISE FR0n WORK IN AREA 0F FRE AP CAUSED TE INDICATI ON BACK TO NORMAL SO NO FURTER WORK IEEED ECESSARY 0237 07/23/85 01-VS -FI -116 021239 VENT FLOW INDICATOR PEGGED LOW PERFORM CAL-247 REFLACE SOUARE ROOT EXTRACTOR 18 MONTN CALIBRATION 0237 07/23/85 02-CV -PI -201A2 020198 RETAG ICVICE & WIRING IAW RE-RETAGGED WIRING AS FER 11548-FE-3BG vistan a ICVICE WAS TAGGED CORRECTLY 0237 07/23/85 02-CV -PI -201B 020197 RETAG DEVICE & WIRING IAW RE-RETAGGED WIRING AS PER 11548-FE-3BG DEVICE WAS TAGGED CORRECTLY vIs1oN o 0237 07/23/85 02-RC -LI -459A 021897 LEVEL INDICATION PEGGED HI FOUND 02-RC-LI-459A INDICATING CONSISTANT WITH CN I FROTECTION PZR LEVEL 1

0237 07/26/85 01-CH -P

-1A 021954 DISCOWECT/ RECONNECT THEPMOCUP REMOVED & RECONNECTED T/CS.

0237 07/26/85 01-CH -P

-1A 022342 C ECK INBOARD RTD. INDICATES 2 FOUND COMPUTER POINT OUT OF SCAN.

FLACED T0106A IN SCAN i

f 1

l L

P;ga 36 JE D

$GY REl.ATED TGIIG REIOCEb POEu E3MED FY UNIT AC IE8 ARTG FRO:i 07/27/E;5 TSU OT/30/E5 UNIT 01 SURRY RET'JRt a TO UD IEPT ' SERVICE PHA D 3ER MER WO TITLE HISTOP.Y SUMMRY C2';7 07/30/85 01-CH -TK -1A 018233 HI\\LO TEriP. ALARh IN ON CH. 41 GBSERVED ALARM ACTUATION.0P CECK SAT

]

0237 07/30/25 01-GW -RM -13C-2 022253 MAIN WATER AND DRY OUT REMOVED ALL FILTERS AND CECKED FOR SIGtG OF MDISTURE NONE OBSERVED.

MOKE INLET LINE NO SIGNS Or MOISTURE MONITOR BACK IN SERVIE OPS SAT 0237 07/30/85 01-RPI-ROD -K-6 021909 INODERABLE ) 12 STEFS ADJUSTED CONDITIONS MOILLE FOR 20+200 STEPS PT SENT TO ENGINEERING O

        • M4-
  • ees
  • w au

.m

..w.

,#.m e

4 e

h as

=

=

4

i Page 37 i

o,

  • MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 INSTRUMENT MAINTENANCE SEE THE ATTACHED l

l l

l

Page 38

VEPCt7, S$cETY RELATED DURTNG REDUCED F1%ER SORTED BY UNIT AND DEPARTMENT FROM 07/01/85 TEU 07/03/85 UNIT 02 SURRY RETURNED TO WO DEPT SERVICE MARN NUrEER NUMBER WO TITLE HISTORY

SUMMARY

0237' 07/01/85 02-CH -FI -110 021152 IT AFFEARS THAT FLOW ELEMENT REVERSED POLARITY OF THE SIGNAL e

IS WIRE UP BACKWARD LEADS GOING FROM TE FLOW ELEENT TO TE FLOW CONVERTER 0237 07/01/85 02-CS -LI -200D 012000 PEFFCRM REFUELING CALIBRATION PEFFORMED RACK WORK (REFUELING)

NO ADJUSTMENTS ATTEMPTED TO CAL TRANSMITTER.IT'S REPONSE WAS SLUGGA GED TRANSMITTER IS NO LONGER MADE.

SUBMITTED EWR/ INSTALLED NEW 85-278 0237 07/01/85 02-CS -LT -200D 021243 REMOW EXISTING TRANSMITTER IN REMOVED EXISTING TRANSMITTER INSTALLED NEW TRANSMITTER INSTALLED NEW TRANSMITTER AS PER EWR-85-278 0237 07/01/05 02-FW -FI -2476 021022 FLOW INDICATED WITH NO FLOW OFEN EQUALIZER ON TE TRANSMITTER THROUGH LINE TO EQUALIZE THE WATER IN TE SENSING LINES. CLOSED EDUALIZER AND INDICATION RETURNED TO NORMAL 0237 07/01/95 02-FW -FI -2487.021021 FLOW INDICATED WITH NO FLOW OPENED EDUALIZER ON TE TRANSMITTER THROUGH LINE TO EQUALIZE WATER IN TE SENSING LI NES CLOSED EQUALIZER INDICATION RETURNED TO NORMAL 0237 07/01/85 02-MS -FI -2474 021351 INDICATION HIGH FOR Ft. ANT PERFORMED LOOP CALIBRATION CHECK CON 0! TION WITH EXCEPTION OF TRANSMITTER.FOUND INDICATOR OFF AND ADJUSTED IT. REST OF LOOP CECKED SAT 0237 07/01/85 02-RC -LI -2459A 021098 CH I INDICATING 3% LESS THAN CECKED AND ADJUSTED LM-2-459 TO A c III SAT GUTFilT PT SENT TO ENGINEERING 0237 07/01/95 02-RC -MISC-NA 012568 FERFORM IMP-C-IC-63 ROBO JR NOT REQUIRED ENGINEERS PERF0EtiED FLUX MAP WITH EXISTING FLUX MAPPING EQUIPMENT 0237 07/01/05 02-FFI-RGD -F-8 021213 WOULD-NOT MOVE ) 40 STEFS CALIBRATED SIGNAL CONDITIONING MOW LE WITH OLD AC DATA FROM SECTION DURING ROD DROPS i

-5.6 0F PT 5 2 AND WORKING FINE PT SENT TO ENGINEERING 0237 07/01/85 02-RPI-ROD -J-13 021167 IRPI STOPPED AT 65 STEFS CALIBRATED SIGNAL CONDITIONER DURING HOT ROD DROPS MODLLE WITH OLD AC DATA FROM 5.6 0F PT 5.2 AND WORKING FINE 0237 07/01/05 02-FFI-ROD -L-5 021168 DURING HOT ROD DROFS L-5 CALIBRATED SIGNAL CONDITIONING MODU STOPPED AT 95 STEPS LE WITH OLD AC DATA FROM SECTION 5.6 0F PT 5.2 AND WORKING FINE 0237 07/01/95 02-RPI-ROD -h-10 021166 DURIE HOT ROD DR0cs, M-10 CALIBRATED SIGNAL CONDITIONING STOPPED AT 50 STEPS MODULE WITH OLD AC DATA FROM SECTION 5.6 0F PT 5.2 AND WORKING ~

FINE 0237 07/03/85 02-RC -LI 484 020526 CHANNEL 1 LEVEL INDICATION DID FILLED REFEFfNCE LEG.0PENED HIGH NOT DROP SIDE IRAIN VALVE BUT W NOT GET arf WATER TO COME OUT OF HIGH SIDE OFS CECKED TE ROOT VALVE.FOUND

g gr g Page 39 EPCD SAFETY RELATED IG ING REDUCED POWER SORTED BY UNIT AND DEPARTMENT FROM 07/07/85 TEtl. o7-is-e5

~

UNIT 02 SLERY RETLRED TO WO DEPT SERVICE MARK MJMBER HUMBER WO TITLE HISTORY Sut9%RY 0237 07/08/85 02-FW -FI -2497 021392 ACTED VERY EFRATIC FERFORMED PT 2.10 OPS SAT DURING STLRT-UP PT SENT TO ENGIEERING 0237 07/08/85 02-Al -FI -497 021274 INDICATING FW FLOW WITH NONE PERFORED PT 2.10 OPS SAT ESTABLIS,EO PT SENT TO ENGIEERING 0237 07/08/85 02-RC -YI -200A 021155 ACC0t.GTIC @! TOR INDICATOR FERFORMED BENCH CAL ON SC MODLLE 4

VALVE OPEN PROR.EM DID NOT RE-0CCIR 0237 07/11/85 02-01 -4.T

-102 021023 CORFICT IEVIATION BETWEEN LT-02 'WAS CALIBRATED AND FDL.MD 000D

. TE DEVIATION BETEEN CHAPeELS W4 LT-102-LT-ses S DUE TO LT-165. CALIBRATED LT-165, AND TESTED TE LOOP L-1-165. OPS S AT. PT SENT TO ENGIEERING 0237 07/12/05 02-NI -

-42 021382 REIUCE TRIP STPTS ICE TO CHANGED DVERPOER TRIP AND RESET (LO N ) M N N M NO MORE GAIN LEFT RESET (HI RANGE) SO THAT PT 35.0 (OPS) COLLD BE CO@LETED SATISFACTO RY 0237 07/12/85 02 4 -TE -465 020926 PERCORM 18 MONTH CALIBRATIDH ADJJSTED LOW LEVEL PERFORED 18 MONTH CALIBRATION CK SAT 0237 07/15/85 02-HI -DETR-42I' 021465 INDICATOR READING 2% HIC +ER VERIFIETI PROFER INDICATION WHILE THAN AcTuRAL RESEALING FOJER RANGE DETECTORS INDICATOR READING SAT.

PT SENT TO ENGINEERING.

0237 _07/15/05 C2-RI -Rtt5 -RVLIS 021667 RVLIS TRAIN B STOPPED OPCRATIN) RESET MICROPROCESSOR, PERFORMED PT TO VERIFY PROPER OPS. PLACED IN TREND HOIE FOR 1/2 H0tR TO OBSERVE.

CHECKED SAT. PT SENT TO ENGINEERING 0237 07/15/85 02-RP -DETR-35/36 021408 HIGH FLUX TRIP SETPOINT IS FIADJUSTED I.R. HIGH LEVEL ROD STOP GREATER THAN 25% FULL POWER AND ROD STOP PESET. I.R. HIGH LEVEL TRIP AND TRIP RESET ACCORDINT TO SETFOINT CHANGE B5-15 (N-36) 85-14 (N-35). PT SENT TO ENGINEERING 0237 07/15/85 02-RPI-

-D4 021776 INDICATOR DRIFTING CECKED OUTFilT SIGNAL FROM ROD SIGNAL IRIFTING, SIMULATED SIGNAL, SIGNAL CONDITIONING MOICLE, NO i

LONGER 1 RIFTING. FifT D-4 BACK IN l

SERVICE, NO LONGER DRIFTING.

l l

l

. EkuwL Sawar Nuckwqnnatenulkqurtneent M2e1%sMent its OpixBuXffn6 h & 4***"'

OcjamesRhwIttra Rkhmond Vkytrts23261 o

-N August 15, 1985 Mr. Maurice R. Beebe Serial No.85-591 Office of Resource Management N0/JDH:aca U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D.'C. 20555 50-281 License Nos. DPR-32 Dear Mr. Beebe;

.DPR-37 VIRGINIA POWER SURRY POWER STATION UNIT NOS. 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of July, 1985.

Very truly yours, eb W. L. Stewart Enclosure (3 copies) cc:

Mr.'J. Taylor, Director (12 copies)

Office of Inspection and Enforcement l

Dr. J. Nelson Grace (1 copy) l Regional Administrator Region II i

Mr. D. J. Burke NRC' Resident. Inspector j

Surry Power Station ~

I I

n,o 6

L.