ML20132F668
| ML20132F668 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/20/1996 |
| From: | Mitchell T PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20132F673 | List: |
| References | |
| NUDOCS 9612260049 | |
| Download: ML20132F668 (1) | |
Text
-
~
l Thoma3 N.Mitchell Vice President A
Peach Bottom Atonsc Fbwer Staton i
PECO NUCLEAR e=e-c-n<
1848 Lay Road A Unit of PECO Energy Doha. PA 17314 9032 717 456 4000 rax 717 456 4243 i
l Deceinber 20, 1996 l
U.S. Nuclear Regulatory Commission l
Attention: Document Control Desk Mail Station P1 137 Washington, DC 20555 i
Subject:
Peach Bottom Atomic Power Station Unit 2 - Inservice inspection i
Gentlemen.
\\
In accordance with the PECO Energy Company Second Ten-Year interval Inservice inspection Program, inservice inspections (Isis) were comrbted on Unit 2 during the September 13,1996 i
through October 3,1996, eleventh refuel outa;-
Enclosed are the " Summary Report for the October 22, 1994 to October 3,1996 Periodic Inspection" (NIS 1) and the " Summary of ASME Repair and Replacement Completed." This submittalis required per paragraph IWA-6230 of the ASME Code Section XI,
- Rules for Inservice inspection of Nuclear Power Plant Cornponents."
Sincerely, h
k$
Thomas N. Mitchell Vice President, Peach Bottom Atomic Power Station i
TNM/ME
- tjb
)
gi Enclosures cc:
B. W. Gorman, Public Service Electric & Gas (w/o enclosures)
R. R. Janati, Commonwealth of Pennsylvania (w/o enclosures) l R. l. McLean, State of Maryland (w/o enclosures) j l
H. J. Miller, Administrator, Region I, USNRC W. L. Schmidt, USNRC Senior Resident inspector, PBAPS O
H. C. Schwemm, Atlantic Electric (w/o enclosures)
A. F. Kirby Ill, Delmarva Power (w/o enclosures)
A, Schiaffino, Hartford Steam Boiler Chief Boiler inspector, Commonwealth of Pennsylvania l
{
}
CCN 96-14091 l'
9612260049 961220 t
PDR ADOCK 05000277 l
G PDR