ML20129E919
| ML20129E919 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/26/1996 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20129E922 | List: |
| References | |
| NUDOCS 9610040003 | |
| Download: ML20129E919 (4) | |
See also: IR 05000341/1996006
Text
. . _ _ _ _ _ - . _ . _ . . _ _ _ _ _ _ . - .
y
,
1
9
h
ol
!
'
l
September 26, 1996
l
Mr. D. R. Gipson
j
i
Senior Vice President
-Nuclear Generation
The Detroit Edison Company
!
'
6400 North Dixie Highway
Newport, MI 48166
i
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-341/96006
Dear Mr. Gipson:
l
On August 2, 1996, the NRC completed an inspection at your Fermi 2' reactor
l
facility. The enclosed report presents the results of that inspection,
j
Areas examined during the inspection are identified in the report.- Within~
!
these areas, the inspections consisted of a selective examination of
procedures and representative records, interviews with personnel, and
i
observatics of activities in progress. The purpose of the inspection effort
j
was to determine whether activities authorized by the license were conducted
safely and in accordance with NRC requirements.
l
!
This inspection report represents an integrated product of a number of diverse
j
inspections that were conducted during the inspection period. The summary
contained in the report provides an overview of our assessment of your
!
performance in the four functional areas (Operations, Maintenance,
i
Engineering, and Plant Support) in which inspections were performed.
Based on the results of this inspection, certain of your activities appeared
'
~
to be in violation of NRC requirements, as specified in the enclosed Notice of-
Violation. Specifically three violations of NRC requirements were identified.
In the first instance, corrective actions for a previously cited violation
'
were insufficient to prevent recurrence in that your staffs monitoring of
,
safety related service water system performance failed to identify repeat
fouling of a drain line.
In the second violation, workers . failed to follow
site procedures by improperly staging equipment in the Division II Battery
.
Room.
l
l
The third violation involving the failure to include a valve in the Residual
!
Heat Removal Service Water System Operating Procedure was of' concern because
l
it was a another example of inadequate procedures.
Problems with inadequate
and incorrect procedures were documented in Inspection Reports 96002, 96004,
l
and 96005. _ In your response to the third violation, you are requested to
,
l
discuss corrective actions implemented in response to the continuing trend of
j
inadequate procedures and provide a status of these actions.
t
i
!
9610040003 960926
~
,
ADOCK 05000341
\\
G
,
l
_
_
.
. - -
--
.
T
e
9
i
D. R. Gipson
-2-
These violations are cited in the enclosed Notice of Violation, and the
circumstances surrounding the violations are described in detail in the
l
enclosed report.
Please note that you are required to respond to this letter
i
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to deter-
mine whether further enforcement action is necessary to ensure compliance with
l
regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
l
this letter and its enclosures will be placed in the NRC Public Document Room
l
(PDR).
.
Sincerely,
!
/s/ John A. Grobe for
James L. Caldwell, Acting Director
i
Division of Reactor Projects
'
l
Docket Nos:
50-341
!
License Nos: NPF-43
l
Enclosures:
'
l
1.
l
2.
Inspection Report
l
No. 50-341/96006
i
4
cc w/ encl:
N. Peterson,
Supervisor of Compliance
P. A. Marquardt, Corporate
Legal Department
l
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Monroe County, Emergency
Management Division
(See attached concurrence)
Document:
R:\\insprpts\\ powers \\ferm\\fer96006.drp
(See attached cont.
dist)
<
g 7..
. .
., ... .
-. . . w.
.. . . .
. -c . cm w .
... i
-c . c.,
.. ..
f i
.
OFFICE
RIII
RIII
,n
RIII
N
RIIL,f4
N
NAME
Kobetz
Jorda h k
Creed /Ringkht
Gr[thbldwell
DATE
09/ /96
09/6/96'
09/ /96
09/7A/96
0FFICIAL RECORD COPY
!
. . -
.-
. _ - . -
-
. _ - - - . - .
. - . . - - . - . - -
. - - - . . . -
. - . - -
!
.
'
,
,
D. R. Gipson
-2-
procedures were documented in Inspection Reports 96002, 96004, and 96005.
In
your response to the third violation, you are requested to discuss corrective
actions implemented in response to the continuing trend of inadequate procedures
and provide a status of these actions.
These violations are cited in the enclosed Notice of Violation, and the
circumstances surrounding the violations are described in detail in the enclosed
report. Please note that you are required to respond to this letter and should
i
follow the instructions specified in the enclosed Notice when preparing your re-
sponse. The NRC will use your response, in part, to determine whether further
i
enforcement
action
is necessary to
ensure
compliance with
regulatory
requirements.
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this
i
letter and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
j
James Caldwell, Director
Division of Reactor Projects
Docket Nos:
50-341
l
License Nos: NPF-43
Enclosures:
1.
2.
Inspection Report
l
j
No. 50-341/96006
!
cc w/ encl:
N. Peterson,
Supervisor of Compliance
l
P. A. Marquardt, Corporate
'
Legal Department
James R. Padgett, Michigan Public
Service Commission
i
Michigan Department of
Public Health
Monroe County, Emerger.cy
%
i
Management Divisior
i
'
Document: R:
(See attached cont. dist)
g
, .
.,\\.i.n..sprpts\\ power..s\\.fo..rm\\fer96006.d..rp
. . . .
.
c . c. .
...
f.-i
c
.c.,,.........f.-i
-.
_
OFFICE
RIII
RIII
RIII
RIII
-
l
NAME
-Ch:t # IAIbordan
Creed / Ring
Grobe/Caldwell
i
DATE
09/4/96
09/ /96
09/ /96
09/ /96
0FFICIAL RECORD COPY
,
. _ - .
..
_
-
.
.-
..
..
.. . ...
.
. _ . .
. .
..
.
.
I
t
s
1
0. R. Gipson
3
i
Distribution continued:
Docket File /w encl
Project Manager, NRR/w enci
PUBLIC IE-01/w enci
DRP/w enci
OC/LFDCB/w/ encl
RIII PRR/w encl
{
SRI Fermi /w/ enc 1
CAA1 w/enci (E-mail)
A. B. Beach, w/enci
B. L. Burgess, w/enci
l
W. L. Axelson, w/enci
l
l
l
1
._