C
jS" "%t
UNITED STATES
y
[
NUCLEAR REGU!.ATORY COMMISSION
- .
REcloN iv
- 'A
l{l
' C
$ ,% 'l%'[
611 RYAN PLAZA DRIVE, SUITE 400
't, . ' . . .
,
AR LINGToN. T E XAS 76011-8064
.
SEP l 81996
T. L. Patterson, Division Manager
Nuclear Operations
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399, Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/96-07 AND NOTICE OF VIOLATION
Dear Mr. Patterson:
-
An NRC inspection was conducted August 19-23,1996, at your Fort Calhoun Station
reactor facility. The enclosed report presents the scope and results of that inspection.
Additionally, on August 26 and September 6,1996, telephonic conversations were held
between representatives of this office and representatives of your staff.
The Fort Calhoun Station access authorization program was examined during the
inspection inspection activities consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities in progress.
During the inspection two violations of NRC requirements were irP ntified. These violations
are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding
the violations are described in detail in the enclosed report. The NRC has concluded that
information regarding the reason for Violation A, and the corrective actions taken to correct
the violation and prevent its recurrence, have already been adequately addressed.
Therefore, you are not required to respond to Violation A unless the description therein
does not accurately reflect your corrective actions or your position, in that case, or if you
choose to provide additionalinformation, you should follow the instructions specified in the
enclosed Notico. You are required to respond to Violation B and should follow the
instructions specified in the enclosed Notice when preparing your response. The NRC will
use your response, in part, to determine whether further enforcement action is necessary
to ensure compliance with regulatory requirements.
It is our understanding that, during the August 23,1996, exit meeting that the Manager,
Nuclear Services stated that Omaha Public Power District would audit the security
background investigation files for allindividuals currently granted unescorted access
authorization to your plant, as discussed in Section S1.2 of the enclosed inspection report.
Please confirm this regulatory commitment in writing within 30 days of the date of this
letter that our understanding of this commitment is correct.
9609230124 960918
ADOCK 05000285
G
4
.
.
Omaha Public Power District
-2-
8
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
,
its enclosures, and your response to Violation A (should you choose to provide a
response), and to Violation B will be placed in the NRC Public Document Room (PDR). To
the extent possible, your response should not include any personal privacy, proprietary, or
'
safeguards information so that it can be placed in the PDR without redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
'
enneth
ck
n, Acting Director
.
Division of Reactor Safety
Docket No.: 50-285
License No.: DPR-40
Enclosures:
2. NRC Inspection Report
50-285/96-07
cc w/ enclosures:
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005-3502
Jack Jensen, Chairman
Washington County Board of Supervisors
Blair, Nebraska 68008
j
!
'
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
i
Nebraska Department of Health
301 Centennial Mall, South
1
P.O. Box 95007
Lincoln, Nebraska 68509-5007
i
l
- . .
.
-
.
- , . _
.
--.
- - -
-
.
.
. - - -
,.
?
.
!
.-
Omaha Public Power District
-3-
i
James W. Chase, Manager
Fort Calhoun Station
,
P.O. Box 399
Fort Calhoun, Nebraska 68023
i
.
f
.
'
Omaha Public Power District
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
g cc to DMB (IEO'4)
b
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
Branch Chief, DRS-PSB
Branch Chief (DRP/B)
Project Engineer (DRP/B)
MIS System
RIV Docket File
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Elaine Koup (NRR/DRPM/SGB; MS: OWFN 9D24)
DRS/PSB Security File (Goines)
Nancy Ervin (NRR/DRPM/SGB; MS: OWFN 9D24)
bRS - 9(o * $ "C//6
cp N
DOCUMENT NAME: G\\ REPORTS \\FC607RP.DWS
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" =gCopy with eficiosures
= No
p-
- ^~kg
RIV PSS PSB
.,l
E
PSS PSB
4
C PSB
yl
l"
C.PSB l f/ l
k 9 'det
DWSchaefer f f!0).
ABEarnest }/
BMMurray j)
KEBrockman p
WJohnsy
og996
09Q96
09gy6
09g96
V
09(fA[
-
/
i
l 4/
l
l
l
l
KEBrockman, /</j
WQ[ I,. I ) L P
OFFICIAL RECORD COPY
\\
23003%
i
.-
.
Omaha Public-Power District
-4-
E-Mail report to D. fJetson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bec to DMB UE04)
bec distrib. by RIV:
L. J. Callan
Resident inspector
DRP Director
Branch Chief, DRS-PSB
Branch Chief (DRP/B)
Project Engineer (DRP/B)
MIS System
RIV Docket File
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Elaine Koup (NRR/DRPM/SGB; MS: OWFN 9D24)
DRS/PSB Security File (Goines)
Nancy Ervin (NRR/DRPM/SGB; MS: OWFN 9D24)
bes-96 -e -OHG
DOCUMENT NAME: G\\ REPORTS \\FC607RP.DWS
v
p
To receive copy of document. Indicate in box: "C" = Copy without enclosures "E"(Copy with efclosures
= No
k;
RIV.PSS.PSB
j E
PSS PSB
$
C.PSB
,,l
lF
C;PSB
p/ l
DWSchaefer ff{//)
ABEarnest
')
BMMurray
)
KEBrockman pg
WJohnsy
'
d
9 ,h ,
/
M 996
OSW96
54t96
09W96
V
09H96f
/ /
,
l //
l
l
l
l
l KEBrockman, ////
l W9h Til VU
.
OFFIGIAL REGORD GOPY