Text
_
.
UNITED 5TAf t$
[p340 k
NUCLEAR REGULATORY COMMISSION
%
, iYN
S
nrosoN iv
f
sii nvAN et Az A onivt. suiit 400
ARLINoTON,1f XAS 760118054
g' -
.....
FEB - 41993
Docket:
50-298
Lice.nse: DPR-46
Nebraska Public Power District
ATIN: Guy R. Horn, Nuclear Power
Group Manager
P.O. Box 499
Columbus Nebraska 68602-0499
SUBJECT:
NRC INSPECTION REPORT 50-298/93-03 (NOTICE Of VIOLATION)
This refers to the routine safety inspection conducted by
Dr. D. Blair Spitzberg and Mr. Jack H. Keeton of thia office on January 18-22,
1993. The inspection included a review of activities authorized for your
Cooper Nuclear Station. At the conclusion of the inspection, the findinga
were discussed with those members of your staf f identified in the enclosed
report.
Areas examined during the inspection are identified in the report and include
a review of the operational status of the Emergency Preparedness Program.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
6 valuation of personnel proficiency in performing emergency response duties.
The results of this inspection are documented in the enclosed inspection
report.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violatior (Notice).
The violations involved failure to perform required tests
of the Emergency Response Organization paging system and failure to critique
and foibwpp on certain emergency drills as required.
These_ violations are of
contarn y.aua they indicate insufficient attention to programmatic
requ!rmnts c ' emergency preparedness.
Another violation, discussed in
Section 1.1 of the enclosed report'was identified for failure to submit
changes to an Emergency Plan implementing arocedure to the NRC within 30_ days
of implementation.
This violation is not )eing cited, because the criteria in
paragrech Vll.B.2 of Appendix C to 10 CFR Part 2 of the NRC's " Rules of
Practice" were satisfied.
This violation was an isolated occurrence, and the
licenset.'s staff took prompt and effective actions to correct the probicm.
You are v quired to respond to this letter and should follow the instructions
specifled in the enclosed Notice when preparing your response.
In your
i
response, /ou should document the specific actions taken and any additional
i
actions yot, plan to prevent recurrence.
After reviewing your response to this
Notice, inc#uding your proposed ccrrective actions and the results of future
080002
,
9302100131 930P04
-Q
ADOCK 05000290
Q
g
i
.
-
, -
_
.
._.
_
-
__
_-
-.
. _ - - _ _ .
. . _ .
-
--
.
,
Nebraska Public Power District
-2-
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirchents.
We also bring to your attention another concern, as discussed in Section 4.1
of the enclosed report, related to your selection of operating crews to
participate in emergency drills and exercises. We noted that for the three
drills and practice exercises leading up to the 1992 annual graded exercise,
the scme operating crew was selected for participation that was later
,
'
evaluated during the annual graded exercise.
None of the other five operating
crews were selected for participation in drills or practice exercises during
nearly a 4-month period prior to the graded exercise, and only two other
documented emergency drills were conducted in 1992.
In the future, we
strongly encourage you to provide for a more even distribution of the training
experience of drill and exercise participation among your operating crews.
In accordance with 10 CTP ". '00 of the NRC's " Rules of Practice," a copy of
.
this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
h
J
. Callan, Director
}g L.Division of Radiation
Safety and Safeguards
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/93-03
cc w/ enclosures:
Nebraska Public Power District
ATTN:
G. D. Watson, General Counsel
P.O. Box 499
Columbus, Nebraska 68602-0499
Cooper Nuclear Station
ATIN: John M. Meacham, Site Manager
P.O. Box 98
Brownville, Nebraska 66321
Nebraska Department of Environmental
Control
ATIN:
Randolph Wood, Director
P,0. Box 98922
Lincoln, Nebraska 68509-8922
. - . -
.
.
.- -._ - -
.-
. = .
-
. = . -
1
1
.
i
l
4
Nebraska Public Power District
-3-
)
Nemaha County Board of Commissioners
ATIN: Richard Maody, Chairman
Nemaha County Courthouse
.
1824 N Street
Auburn, Nebraska 68305
Nebraska Deoartment of Health
ATTN:
Harold Borchert, Director
Division of Radiological Health
-
301 Centennial Hall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
Kansas Radiation Control Program Director
Program Manager
FEMA Region 7
911 Walnut Street, Room 200
64106
Director
Nebraska Civil Defense Agency
-
1300 Military Road
Lincoln, Nebraska 68508
.
-. . - .
..
- -.
.
- --.
,. ..
. . , _ .
..
-
--
-
. - - . - . - . -. -_,
_ .
- .
_- . _ - . -
_
.
. - -
.
_ . - .
. - -
.
.
4
.
1
Nebraska Public Power District
-4-
'
l
bec to DMB (IE35)
bec distrib. by RIV:
1
!
J. L. Milhoan
B. Murray, DRSS/FIPS
'
D. B. Spitzberg, FIPS
j
J. M. Keeton, DRS
!
i
Section Chief, DRP/C
1
Project Engineer, DRP/C
'
Section Chief, DRP/TSS
l
Resident inspector - Cooper Nuclear Station
4;
Senior Rosident Inspector - River Bend
i
Senior Resident inspector - Fort Calhoun
MIS System
FIPS File
i
RIV File
i
Lisa Shea, RM/ALF, MS: MNBB 4503
.
H. Rood, NRR Project Manager (MS 13 H16)
',
C. A. Hackney, RSLO
G. F. Sanborn, E0
J. Lieberman, OE (MS 7 H5)
,
!
>
.
l
1
$,0
_
!.
RIV:FIPS T &
C:0lS/088
C:FIPS h
DD:DRSS M
D':dRPY
DDSpitzberg:nh
JMKee d b
BMurray U
ObDChamberlain
ABBeach
C. A
amiehe/93
/ /3 /93
L-/'I/93
2-/l /93
2 / / /93
.
mmmmmmmmmmmmmu
mummmmumummunamummmmmm-
D:DRSS
LJCallan h
!
2./A/93
.
M
m
er
-
,e.,4er,., . ,
--,.-w
-w.
~
n
,
s.
.
..nr,
em.
4
,-e
,.----.a,
,
,
F
,
%
Nebraska Public Power District
-4-
bec to DMB (IE35)
bec distrib. by RIV:
J. L. Milhoan
B. Hurray, DRSS/FIPS
D. B. Spitzberg, FIPS
J. M. Keeton, DRS
Section Chief, DRP/C
Project Engineer, DRP/C
Section Chief, DRP/TSS
'
Resident inspector - Cooper Nuclear Station
Senior Resident inspector - River Bend
Senior Resident inspector - Fort Calhoun
MIS System
FIPS file
RIV File
Lisa Shea, RM/ALF, MS: MNBB 4503
H. Rood, NRR Project Manager (MS 13 H16)
C. A. Hackney, RSLO
G. F. Sanborn, E0
J. Lieberman, OE (MS 7 H5)
), A
RIV:FIPSTS-
0 : 0 1 S / 0116 .
C:FIPS k$
.DD:DRSS M D:dRPY
DBSpitzberg:nh
JMKeetd8b
BMurray
ObChamberlain
ABBeach
U
2-/I /93
2 // /93
hA/93
2 / 3 /93
L/'l/93
D:DRSS[])t
LJCallanfo
2./ 4 /93