ML20128C867

From kanterella
Jump to navigation Jump to search
Expresses Apologies for Misspelling Recipient Name in Which Forwarded Photographs of Geologic Sections.Ja Bailey to J Armbruster Encl
ML20128C867
Person / Time
Site: 05000000, Vogtle
Issue date: 07/07/1982
From: Wolff M
BECHTEL GROUP, INC.
To: Alterman I
Office of Nuclear Reactor Regulation
Shared Package
ML19292B772 List: ... further results
References
FOIA-84-624 NUDOCS 8505280439
Download: ML20128C867 (2)


Text

_ - _ - _ _ _ _ _ _.

W 3_[

Bechtel Civil & Minerals,Inc.

Engineers-Constructors Fif ty Beale Street San Francisco. Cahfornia Mad Addreso-PC Bos 3965. san Francisco.CA 9a119 July 7, 1982 Ms. Ina Alterman Geosciences Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Transmittal of Geologic Sections Vogtle Electric Generating Plant

Reference:

Letter Crosby /Alterman July 6, 1982

Dear Ms. Alterman:

The above-referenced letter transmitted to you color photographs of geologic sections prepared for studies of the suggested Hillett Fault near the Vogtle site. As you are no doubt aware, we inadvertently misspelled your name.

Please accept our apologies for this unfortunate error.

I trust the photographs are satisfactory for information purposes, and I look forward to meeting you next week during your site visit.

i Very truly yours, M. Wolf Engineer ng Geology Supervisor MW:rl cc:

J. A. Bailey, Southern Company Services D. O. Foster, Georgia Power Company i

l g 52 g 9 841015 l

SHOLLYB4-624 PDR

(

uno

I

. t.+e. Ce n

.k a.

Pr &+,co B-N25 B r-n g m. cm 4.0. '

Te eeve,a 5 e7; e t 3

4d Southern CompanySuvices the sournem eg.,c s Atem July 15, 1982 Mr. Jeffery Ambruster District Chief U.S.'Geolenical Survey 6481 Peachtree Industrial Boulevard Suite B Doraville, GA 30360

Dear Mr. Armbruster:

.. Enclosed is a copy of the final geophysical logs for drill holes Wr-8, VSC-1, VSC-2, VSC-3 and PSR. An acoustic velocity log for hole VSC-1 was run to calibrate the ma4=mic reflection survey run along the river. For hole P5R, the existing well cm the SRP p@Ly, only the nuclear and caliper logs were run, due to the hole being caaad.

The cmly remaining hole to be logged is VSC-4. '1his log will be transmitted when it is ccm1pleted.

Very truly yours,

.Q.

J. A. Bailey ~

Project Licensing Manager JAB /ssb sc:

R. A. Jackson (w/ attachment)

I. W. Marine (w/attachnent)

M. Hawkins (w/attachnent)

W. V. Conn (w/ attachment)

R. Morris (w/o attachment)

D. O. Foster (w/o attachment)

D." E. Dutton (w/o attachnent)

F O. Batum (w/o attachnent)

R. A. Ttx2nas (w/o attachment)

C. R. McClure (w/o attachnent)

J. M. Grant (w/o attachment) f

.' )

_ - _ _