fpA
~
N9N.A,lw,i ucca,_t F..,0PY.
2 NORTHERN 5TATES POWER COMPANY MIN N E A PO LI S. M S N N E GOTA 95404 lkl n..
A
/ ' 'I
'f ') v March 7, 1978
< /d [.
a wa 4 v.s m1973 Q Director, Office of Management O
Information & Program Control C3 c/o Distribution Services Branch, DDC, ADM b
U S Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report February 1978 Attached are two copies of the Monthly Operating Report for February, 1978 for the Monticello Nuclear Generating Plant.
Yours very truly,
%. U er$
A L 0 Mayer, PE Manager of Nuclear Support Services IDM/ak cc: Director, IE-III, USNRC (1)
(Director, IE, USNRC (c/o DSB) (10)
MPCA Attn: J W Ferman 0
s, t
l 9212040488 780228 780720022 PDR ADOCK 05000263 R
pyg
NARRATIVE SIM4\\Rf 0F OPERATING EXPERIENCE DOCKET NO.
50-263 LNIT 1
l DATE 3/6/78 00$PLETED BY A. L. Mvrabo TELEPIKNE 612/295-5151, Ext. 239
?DNTI Febmary 4
2/1/78 to Operated at 100% of rated power.
2/2/78 2/3/78 Orderly shutdown for rod sequence exchange and re-pair / inspection of tonis vacuum breakers. Trued up bearing housings and bearings and adjusted end clear-ance on toms to drywell vacuum breakers "B" and
" T". Changed out topworks on "A" relief valve due to leak around strainer plug.
2/4/78 Operated at approximately 100% of rated power, except to for weekend reductions to perform control rod exercising 2/22/78 and valve testing.
2/23/78 Reactor scram due to low condenser vacuum caused by both circulating water pumps tripping from spurious flood protection circuit signal.
2/24/78 to Operated at 100% of rated power.
2/28/78 Spent Fuel Storage Update Fuel assemblies in the core - 484 Fuel assemblies in the spent fuel storage pool - 616 Licensed spent fuel storage pool capacity - 740 Date of last refueling that can be discharged with present capacity -Oct, 1978
1 4
1 l
]
OPER ATING DATA REPORT i
DOCKETNO. 50-263 DATE 3/1/78 COMPLETED BY. A.MYRA110 i
TELEPHONE 612/20s.E151 4
.I i
OPERATING STATUS b
Monticello Notes
- 1. Unit Name:
l
- 2. deportmg Period:
Febmarv
.l. Licenwd Thermal Power (MWI):
1670 569
- 4. Nameplate Rating (Grun Mhel.
j
- 5. Design Electrical Rating (Net MWel:
545.4-564 l
- 6. Masimum Dependable Capacity (Gross MWel:
536 7 Masimum Dependahic Capacity (Net MWe):
- h. If Changes Occur in Capacity Ratine titems Number 3 Through 7) Since Last Report. Gise Reawne (Net MWel:
N/A
- 9. Power Letel To Which Restricted.lf Any/A N
i
- 10. Reasons For Restrictions,If Any.:
i j
This Month Yr..to Date Cumulative 1
672 1.416 5_8,441 1 l
- 11. Hours in Reporting Period l
- 12. Number Of Hours Resetor Was Critical 644.2 1.388.2 46.556 6 1.1. Reactor Resene Shutdown Hours 0.0 0.0
-940.7
- 14. Hours Generatm On.Line 630.3 1,374.3 45,151.7 0.0 0.0 0.0
)-
- 15. Unit Resene Shutdown lluurs
- 16. Cross Thermal Energy Generated (MWH) 974.500.8 2.207.824.8 75_.862.399.4
}
- 17. Gruss Electrical Energy Generated (MWH).
334.120_. _,..
756.750 23.129.440
- 15. Net Electrical Energy Generated (MWH) 321.696 729'.302 22'.105.676
~
4
- 19. Unit Senice Factor 93.8%
97.1%
77.3%
93.8%
- 97.lf.
I-
- 20. Unit Availabi:ity Facto,
'7.3%
i l
- 21. Unit Capacity Factor IUsing MDC Neti 89.3%
96.1%
70.6%
87 8%
94 4%-
69.4%
. 2.'
Unit Capacity Factor (Using DER Net)-
- 23. Unit Forced Outage Rate 1.6%
-0.7%
7.8%
- 21. Shutdowns Schedukd User Ne.st 6 Monthy(Type Date,and Duration of Each):
Refueline Outane. October 16. 1978. 40 days
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operations N/A Forecast
~ Achieved INITI AL CRITICALITY r
INITIA L ELECTRICITY COMMERCI A L OPER ATION
+
i P857 )
1 9'
m A_-,
..A-,
...,m
~m....
..__,a=.,..
~
AVER 4CE D ALLY UNIT POWER LEVEL 50-263 DOCKET NO.
i hbnticello 3,IT DATE 3/1/78 COMPLETED fiY A. hhRABO TELEPl10NE MONTil FEBRUARY DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL Olwe Net) i M w e.Neil i
I 553 553 37 1
345 553 2
ig 3
-5 497 in 221 4
20 547 5
379 2
549 484 6
22 550 23 217 7
RTt 8
538 400 2.s 9
541 25 494 10 540 545 26 11 546 27 549 12 516 d
-28 551 13 553
,9,
14 553 30
}
15 ERO 3
16 553 4
INSTR UCTIONS On this format.hst the average daily umt power Icelin MWe Net for each day m the reporting month.(ompute to the nearest whole megawatt.
tul77 )
4 r
-w
.. -. -. ~.. -
l UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-263 UNIT NAME Mnrit i rel in DATE 1/1/7R COMPLETED BY A-W rabo REPORTMONTis February TELEPHONE 612/295-5151 1 u,
_5
=
c.
E-
,E4 Ln.ensee g,
s%
Cause & Cusressive
~,-!e g
4 ise Event s2 s.E Action to L.
Date i
$5 5
j5g Report :
A0 j'
Presen: Recurrent'e 6
1 770202 F
31.4 A
1 78-02-01-T SA VALVEX Rod sequence exchange and repair /
inspection of torus vacuum breaker (stuck open).. All torus vacuta breakers tested and adjusted.
2 770223 F
10.3
-A-3 N/A IIF ZZZZZE Reactor scram on low condenser vacuum caused by both circulating water pumps tripping from spurious flood protection system signal.
Flood protection system deactivated for further testing.
1 2
1 4
i' Fueced Reaom:
\\tethod :
Exhibis G - Insieuiti ms S Sched ufes!
A l~quipment FailureIExplaml
! \\tanual for Prep.iratum of Dara B. Maintenance of Test 2-Manual Scram.
Entry Sheets fe: Ixemcc C. Refueling LOther i E splaml 01616 4 Aufum iic S, ram.
Esent Repori LI RI File INURE G-D-Regulatos) Restiiction.
' t 1 Operator Training & Litenw 1%aminaiam F4dnunistrati.c -
5 G-Operational Es roe ILsplaml Estubit I - Same Source
' p8!77)
Il-Other t (Nplain t i
,=