Monthly Operating Rept for Feb 1978 for Monticello Nuclear Generating Plant
ML20128C616
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/28/1978
From: Mayer L, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 9212040488
Download: ML20128C616 (5)


Text

-

fpA

~

N9N.A,lw,i ucca,_t F..,0PY.

2 NORTHERN 5TATES POWER COMPANY MIN N E A PO LI S. M S N N E GOTA 95404 lkl n..

A

/ ' 'I

'f ') v March 7, 1978

< /d [.

a wa 4 v.s m1973 Q Director, Office of Management O

Information & Program Control C3 c/o Distribution Services Branch, DDC, ADM b

U S Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report February 1978 Attached are two copies of the Monthly Operating Report for February, 1978 for the Monticello Nuclear Generating Plant.

Yours very truly,

%. U er$

A L 0 Mayer, PE Manager of Nuclear Support Services IDM/ak cc: Director, IE-III, USNRC (1)

(Director, IE, USNRC (c/o DSB) (10)

MPCA Attn: J W Ferman 0

s, t

l 9212040488 780228 780720022 PDR ADOCK 05000263 R

pyg

NARRATIVE SIM4\\Rf 0F OPERATING EXPERIENCE DOCKET NO.

50-263 LNIT 1

l DATE 3/6/78 00$PLETED BY A. L. Mvrabo TELEPIKNE 612/295-5151, Ext. 239

?DNTI Febmary 4

2/1/78 to Operated at 100% of rated power.

2/2/78 2/3/78 Orderly shutdown for rod sequence exchange and re-pair / inspection of tonis vacuum breakers. Trued up bearing housings and bearings and adjusted end clear-ance on toms to drywell vacuum breakers "B" and

" T". Changed out topworks on "A" relief valve due to leak around strainer plug.

2/4/78 Operated at approximately 100% of rated power, except to for weekend reductions to perform control rod exercising 2/22/78 and valve testing.

2/23/78 Reactor scram due to low condenser vacuum caused by both circulating water pumps tripping from spurious flood protection circuit signal.

2/24/78 to Operated at 100% of rated power.

2/28/78 Spent Fuel Storage Update Fuel assemblies in the core - 484 Fuel assemblies in the spent fuel storage pool - 616 Licensed spent fuel storage pool capacity - 740 Date of last refueling that can be discharged with present capacity -Oct, 1978

1 4

1 l

]

OPER ATING DATA REPORT i

DOCKETNO. 50-263 DATE 3/1/78 COMPLETED BY. A.MYRA110 i

TELEPHONE 612/20s.E151 4

.I i

OPERATING STATUS b

Monticello Notes

1. Unit Name:

l

2. deportmg Period:

Febmarv

.l. Licenwd Thermal Power (MWI):

1670 569

4. Nameplate Rating (Grun Mhel.

j

5. Design Electrical Rating (Net MWel:

545.4-564 l

6. Masimum Dependable Capacity (Gross MWel:

536 7 Masimum Dependahic Capacity (Net MWe):

h. If Changes Occur in Capacity Ratine titems Number 3 Through 7) Since Last Report. Gise Reawne (Net MWel:

N/A

9. Power Letel To Which Restricted.lf Any/A N

i

10. Reasons For Restrictions,If Any.:

i j

This Month Yr..to Date Cumulative 1

672 1.416 5_8,441 1 l

11. Hours in Reporting Period l
12. Number Of Hours Resetor Was Critical 644.2 1.388.2 46.556 6 1.1. Reactor Resene Shutdown Hours 0.0 0.0

-940.7

14. Hours Generatm On.Line 630.3 1,374.3 45,151.7 0.0 0.0 0.0

)-

15. Unit Resene Shutdown lluurs
16. Cross Thermal Energy Generated (MWH) 974.500.8 2.207.824.8 75_.862.399.4

}

17. Gruss Electrical Energy Generated (MWH).

334.120_. _,..

756.750 23.129.440

15. Net Electrical Energy Generated (MWH) 321.696 729'.302 22'.105.676

~

4

19. Unit Senice Factor 93.8%

97.1%

77.3%

93.8%

- 97.lf.

I-

20. Unit Availabi:ity Facto,

'7.3%

i l

21. Unit Capacity Factor IUsing MDC Neti 89.3%

96.1%

70.6%

87 8%

94 4%-

69.4%

. 2.'

Unit Capacity Factor (Using DER Net)-

23. Unit Forced Outage Rate 1.6%

-0.7%

7.8%

21. Shutdowns Schedukd User Ne.st 6 Monthy(Type Date,and Duration of Each):

Refueline Outane. October 16. 1978. 40 days

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operations N/A Forecast

~ Achieved INITI AL CRITICALITY r

INITIA L ELECTRICITY COMMERCI A L OPER ATION

+

i P857 )

1 9'

m A_-,

..A-,

...,m

~m....

..__,a=.,..

~

AVER 4CE D ALLY UNIT POWER LEVEL 50-263 DOCKET NO.

i hbnticello 3,IT DATE 3/1/78 COMPLETED fiY A. hhRABO TELEPl10NE MONTil FEBRUARY DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL Olwe Net) i M w e.Neil i

I 553 553 37 1

345 553 2

ig 3

-5 497 in 221 4

20 547 5

379 2

549 484 6

22 550 23 217 7

RTt 8

538 400 2.s 9

541 25 494 10 540 545 26 11 546 27 549 12 516 d

-28 551 13 553

,9,

14 553 30

}

15 ERO 3

16 553 4

INSTR UCTIONS On this format.hst the average daily umt power Icelin MWe Net for each day m the reporting month.(ompute to the nearest whole megawatt.

tul77 )

4 r

-w

.. -. -. ~.. -

l UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-263 UNIT NAME Mnrit i rel in DATE 1/1/7R COMPLETED BY A-W rabo REPORTMONTis February TELEPHONE 612/295-5151 1 u,

_5

=

c.

E-

,E4 Ln.ensee g,

s%

Cause & Cusressive

~,-!e g

4 ise Event s2 s.E Action to L.

Date i

$5 5

j5g Report :

A0 j'

Presen: Recurrent'e 6

1 770202 F

31.4 A

1 78-02-01-T SA VALVEX Rod sequence exchange and repair /

inspection of torus vacuum breaker (stuck open).. All torus vacuta breakers tested and adjusted.

2 770223 F

10.3

-A-3 N/A IIF ZZZZZE Reactor scram on low condenser vacuum caused by both circulating water pumps tripping from spurious flood protection system signal.

Flood protection system deactivated for further testing.

1 2

1 4

i' Fueced Reaom:

\\tethod :

Exhibis G - Insieuiti ms S Sched ufes!

A l~quipment FailureIExplaml

! \\tanual for Prep.iratum of Dara B. Maintenance of Test 2-Manual Scram.

Entry Sheets fe: Ixemcc C. Refueling LOther i E splaml 01616 4 Aufum iic S, ram.

Esent Repori LI RI File INURE G-D-Regulatos) Restiiction.

' t 1 Operator Training & Litenw 1%aminaiam F4dnunistrati.c -

5 G-Operational Es roe ILsplaml Estubit I - Same Source

' p8!77)

Il-Other t (Nplain t i

,=