Text
UMTf D STATES
[]
hC
"
p* Moo
f,,
NUCLEAn nEGULATOnY COMMisslON
'
D'
, ,.
[
yj
$
REGION lit
a
f
a
%
4
GLEN t LLYN ILLINOIS 60137
%...../
JAN 2 51993
Docket No. 50-483
License No. NPF-30
EA 92-249
Union Electric Company
ATTN:
Mr. Donald F. Schnell
Senior Vice President - Nuclear
Post Office Box 149 - Hail Code 400
-
St. Louis, MO 63166
Dear Mr. Schnell:
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-483/92015(DRP)
AND ENFORCEMENT CONFrRENCE REPORT NO. 50-483/93002(DRP))
This refers to the routine inspection conducted from October 1 through
December 18, 1392, at the Callaway Plant, Unit 1.
During this inspection
violations of NRC requirements were identified and considered for escalated
enforcement. A public enforcement conference was held in the Region III
office on January 12, 1993, with you and members of your staff and me and
other members of the NRC staff. We have enclosed a report summarizing the
enforcement conference.
Based on the results of the inspection and in conjunction with the information
,
presented during the enforcement conference, certain of your activities
appeared to be in violation of NRC requirements.
The violations included
-
multiple examples of failure to follow procedures during the performance of
maintenance activities on and subsequent verification of an essential service
water valve.
These are considered Severity Level IV violations and are
contained in the enclosed Notice of Violation (Notice).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures, and your response to this letter will be
placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Hotice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9301290065 930125
[
ADOCK 05000483
j
G
i
JAN 2 51993
.
Union Electric. Company
2
=
We will gladly discuss any questions you have concerning this Enforcement
Conference.
Your cooperation with us is appreciated.
Sincerely,
f'gg ,
fp-v4
Edward G. Greenman, Director
Division of Reactor Projects
Enclosures:
2. Enforcement Conference
Report No. 50-483/93002(DRP)
3. Attachment A
Licensee Presentation Material
cc w/ enclosure:
G. L. Randolph, Vice President,
Nuclear Operations
J. V. Laux, Manager Quality
Assurance
S. E. Sampson, Supervising
Engineer, Site Licensing
DCD/DCB-(RIDS)
OC/LFDCB
.
Resident inspector, RIII
Region IV
Resident Inspector, Wolf Creek
,
K. Drey
'
C. John Renken, Engineer
Policy & Federal Dept.
Gerald Charnoff, Esq.
R. A. Kucera, Deputy Director,
Department of Natural Resources
I