Forwards Updated Const Status Repts as of 821001 for Inclusion in NUREG-0030.Unit 2 Fuel Load Date Currently Under Review Due to Ruling to Defer/Cancel Facility by Pennsylvania Public Util Commission
ML20127D520
Person / Time
Site: 05000000, Limerick
Issue date: 10/19/1982
From: Clarey J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504150366
Download: ML20127D520 (5)


Text

_

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET -

P.O. BOX 8699 PHILADELPHI A. PA.19101 saisi e414ooo October 19, 1982 Chief. Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Conunission Washington, D.C.

20555'

SUBJECT:

CONSTRUCTION STATUS REPORT (NUREG-0030)

(Yellow Book)

Dear Sir:

Attached is the updated construction status through 10/1/82 for Limerick Generating Station Units 1 & 2.

Changes are shown in green.

Please note that Unit 2 fuel load date is currently under review due to a recent ruling to defer / cancel Unit 2 by the Pennsylvania Public Utility Commission.

Very truly yours,

."Clarey Project Manager - Construction Attach.

JJC/JTS/cp cc Site NRC Inspector File:

13.d g 41 g g 840606 KILLEFE84-367 PDR

C005TRUCTION 5TATU5 REPORT

  • AGE NO: 2-064 LIRERICK 1 NUCLEAR P0WER PLANT 5 STATUS A5 0F:

03-31-82

(

PLANT C H A R A C T E R I 5 T I C 5:

KEY P E R S O N N E L:

l DOCFET NO:

85800352 CORPORATE CONTACT:

V. 5. BOYER. SENIOR VICE PRESIDENT l

CP WD. 8 DATE ISSUED: CPPR-186/ 86-19-74 NUCLEAR POWER CP ErPIRATION DATE:

10-B1-85 CORPORATE ADDRESS:

PHILADELPHIA ELECTRIC COMPANY APPLICANT:

PHILADELPHIA ELECTRIC 2301 MARKET STREET l

PLANT LOCATION:

35 MI NW OF PHILADELPHIA. PA PHILADELPHIA. PENNSYLVANIA 19101 IE REGION:

1 CORPORATE PHONE NO:

(215) 841-4500 AE:

BECHTEL N555:

GENERAL ELECTRIC CONSTRUCTOR:

BECHTEL NRC LPM:

H. ABEL5ON REACTOR TYPE:

SWR IE PROJECT INSPECTOR:

DER (1% E):

1865 IE RESIDENT INSPECTOR:

N (g,CQWpgf IQ5PECTION 5 T A T U 5:

FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REP 0RTED 5Y U T I L I T Y:

l Jan. 1982 - Mar. 1982 REPORT MEW REASON FOR CHANGE

~

REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

89-27-74 10-01-80 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING l

82-81 08-28-81 81-21-82 PROBLEMS.

42-82 81-26-82 82-02-82 18-15-75 08-01-80 SCHEDULE REFINEMENT AND BUDGET 82-83 01-11-82 51-29-82 ADJUSTMENTS.

42-04 52-81-82 02-28-82 85-24-76 10-01-82 NIGNER CAPITAL COSTS AND LOWER THAN 82-85 B3-81-82 83-30-82 EXPECTED DEMAND FOR ELECTRICITY.

82-06 83-15-42 04-23-82 89-23-80 10-80-83 INCREASE OF SCOPE DUE TO DESIGN CHANGES l

8 NEW REGULATORY REQUIREMENTS. DESIGN PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT.

REFINEMENT OF ESTIMATES. PND LIMITS ON Inspection Reports are available at loca! PDRs.

YEARLY CAPITAL AVAILABLE.

82-20-81 15-80-84 REFINEMENT OF MANHOUR ESTIMATES AND DURATIONS REQUIRED TO COMPLETE REMAINING ENGINEERING AND FIELD W3RK.

l L0 CAL PURLIC DCCUMENT R 0 0 M:

POTTSTDWN PUBLIC LIBRARY 508 HION STREET l

POTTSTDWN PENNSYLVANIA 19464 l

C0NSTRUCTION 5TATUS REP 0RT PAGE NO: 2-06S LIMERICK l NUCLEAR POWER PLANTS STATUS AS OF:

03-31-82 C0N$TRUCTION STATUSt APPLICANT'S CUR *ENT ESTIMATED FUEL LOADING DATE:

10-00-84 APPLICANTS CONS!RUCTIDH COMPLETI0M ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-00-83 DEFINED IN CP (EARLIEST) 10-00-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

04-00-79 (LATEST) 10-00-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-08-85 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: J>rf 79f1h COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WE CONTINUE TO REPORT THE OVEPALL COMPLETION PERCENTAGES BASED ON ON* TOTAL SCOPE AND NANNOUR EXPENDITURES.

wSTIMATED ACTUAL ESTIMATED ACTUAL ESTIMAT'ED START 11AE COMPLETION COMPL M % COMPLETE MOBILIZE AND PREPARE SITE:

05-00-70 05-00-70 09-00-74 09-00-14 10c%

PLACE STRUCTURAL CONCRETE:

07-03-74 07-00-74 11-00-80 11-00-80 100%

INSTALL REACTOR PRESSURE VESSEL:

11-00-76 11-00-76 12-00-76 12-00-76 100%

INSTALL LARGE BORE PROCESS PIPE:

01-c0-76 01-00-76 02-00-83 JWMc Tfj INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBEASE 01-00-76 01-00-76 04-C2-83

.39RS3'E

- =-

INSTALL SMALL BORE PIPE:

01-00-77 01-00-77 06-00-d3 JA4/76${

INSTALL CABLE TRAY:

01-00-76 01-00-76 02-08-83 I

01.se-84 100%

INSTALL EXPOSED METAL COPDUIT:

02-00-76 02-00-76 11-00-83

.PetII.1%

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-00-81 01-00-81 01-00-84 sWMCfyg INSTALL ELECTRICAL TERMINATIONS:

01-00-88 01-00-81 03-00-84 J4tj7g CONDUCT REACTOR COLD NYDR0 STATIC TEST:

'00-83

.3$-00-83 0%

CONDUCT NOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

07-00-82 0$".40HRL 10-00-84

.64 /jF,

-t

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-066' LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF:

03-31-82 PLANT CHARACTERI5 TICS:

KEY PERSONNEL DOCKET NO:

85000353 CORPORATE CONTACT:

V. S. BOYER. SEMICR VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-187/ 06-19-74 NUCLEAR POWER CP EXPIRATION DATE:

10-01-87 CORPORATE ADDRESS:

PHILADELPHIA ELECTRIC COMPANY APPLICANT:

PHILADELPHIA ELECTRIC 2301 MARKET STREET PLANT LOCATION:

35 MI NW OF PHILADELPHIA, PA PHILADELPHIA. PENNSYLVANIA 19101 IE REGION:

1 CORPORATE PHONE NO:

(215) 841-4500

.AE:

BECHTEL NSSS:

GENERAL ELECTRIC CONSTRUCTOR:

BECHTEL NRC LPM.

M. ABELSON REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

N Sg.CM(ggjgY DER (MWE):

1065 IE RESIDENT INSPECTOR:

IN5PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER DF INSP.

OF INSP.

09-27-74 10-01-81 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING 82-01 01-26-82 02-02-82 PROBLEMS.

82-02 01-11-82 01-29-82 10-15-75 01-01-82 SCHEDULE REFINEMENT AND BUDGET 82-03 02-01 02-28-82 ADJUSTMENTS.

82-04 03-01-82 03-30-82 05-24-76 10-01-84 NIGNER CAPITAL COSTS AND LOWER THAN EXPECTED DEMAND FOR ELECTRICITY.

09-23-80 10-00-86 INCREASE OF SCOPE DUE TO DESIGN CHANGES 8 NEW REGULATORY REQUIREMENTS, DESIGN Inspection Reports are available at local PDRs.

PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT, REFINEMENT OF ESTIMATES AND LIMITS ON YEARLY CAPITAL AVAILABLE.

02-20-81 04-00-87 REFINEMENT OF MANNOUR ESTIMATES AND l

DURATIONS REQUIRED TO COMPLETE REMAINING ENGINEERING AND FId.D WORK.

0744-D MA/D64 EANIftd Pena Vaseia [q4N*c b og8 4,

c. w,37 k C44fCf khh 2 L0 CAL PUBLIC D0CUMENT R 0 0 M:

POTTSTOWN PUBLIC LIBRARY 500 MIGH STREET POTTSTOWN. PENNSYLVANIA 19464 a

C0NSTRUCTION STATUS REPORT PAGE NO: 2-067*

LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 C0N5TRUCTION

$TATU5 g

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

N NM APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

"O 0 0 0', d-ee-f7 DEFINED IN CP: (EAPLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

09-00-80 (LATEST) /s g. g APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 30%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: IJE CONTINUE TO REPORT OVERALL COMPLETION PERCENTAGES BASED ON TOTAL SCOPE AND MANHOUR EXPENDITURES.

ESTIMATED ACTUAL FSTIMATED ACTUAL ESTIMATED START 11 ART fatLP@g

{pMPLETION % COM? TETE MOBILIZE AND PREPARE SITE:

05-00-70 05-0070 09-00-74 09-00-74 200%

PLACE STRUCTURAL CONCRETE:

09-00-74 09-00-74 11-00-80 11-00-80 100%

INSTALL REACTOR PRESSURE VESSEL:

09-00-77 09-00-77 10-00-77 10-00-77 100%

INSTALL L ARGE BORE PROCESS PIPE:

01-00-76 01-00-76 04-00-85 34422'%

INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND $NUBBERS:

01-00-76 01-00-76 12-00-84

.AM (37, INSTALL SMALL BORE PIPE:

01-00-78 01-00-78 01-00-85

-44 N INSTALL CABLE TRAY:

06-00-78 06-00-78 06-00-85

.A4t l3T INSTALL EXPOSED METAL CONDUIT:

12-01-82 04-00-86

. Der 37, INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

01-0C-84 09-00-86 0%

INSTALL ELECTRICAL TERMINATIONS:

03-00-84 11-00-86 0%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

05-00-86 05-00-86 0%

CONDUCT NOT FUNCTIONAL TEST:

N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

08-00-85 04-00-87

',