P.O. BOX 8699 PHILADELPHI A. PA.19101 saisi e414ooo October 19, 1982 Chief. Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Conunission Washington, D.C.
20555'
SUBJECT:
CONSTRUCTION STATUS REPORT (NUREG-0030)
(Yellow Book)
Dear Sir:
Attached is the updated construction status through 10/1/82 for Limerick Generating Station Units 1 & 2.
Changes are shown in green.
Please note that Unit 2 fuel load date is currently under review due to a recent ruling to defer / cancel Unit 2 by the Pennsylvania Public Utility Commission.
Very truly yours,
."Clarey Project Manager - Construction Attach.
JJC/JTS/cp cc Site NRC Inspector File:
13.d g 41 g g 840606 KILLEFE84-367 PDR
C005TRUCTION 5TATU5 REPORT
- AGE NO: 2-064 LIRERICK 1 NUCLEAR P0WER PLANT 5 STATUS A5 0F:
03-31-82
(
PLANT C H A R A C T E R I 5 T I C 5:
KEY P E R S O N N E L:
l DOCFET NO:
85800352 CORPORATE CONTACT:
V. 5. BOYER. SENIOR VICE PRESIDENT l
CP WD. 8 DATE ISSUED: CPPR-186/ 86-19-74 NUCLEAR POWER CP ErPIRATION DATE:
10-B1-85 CORPORATE ADDRESS:
PHILADELPHIA ELECTRIC COMPANY APPLICANT:
PHILADELPHIA ELECTRIC 2301 MARKET STREET l
PLANT LOCATION:
35 MI NW OF PHILADELPHIA. PA PHILADELPHIA. PENNSYLVANIA 19101 IE REGION:
1 CORPORATE PHONE NO:
(215) 841-4500 AE:
BECHTEL N555:
GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM:
H. ABEL5ON REACTOR TYPE:
DER (1% E):
1865 IE RESIDENT INSPECTOR:
N (g,CQWpgf IQ5PECTION 5 T A T U 5:
FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REP 0RTED 5Y U T I L I T Y:
l Jan. 1982 - Mar. 1982 REPORT MEW REASON FOR CHANGE
~
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
89-27-74 10-01-80 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING l
82-81 08-28-81 81-21-82 PROBLEMS.
42-82 81-26-82 82-02-82 18-15-75 08-01-80 SCHEDULE REFINEMENT AND BUDGET 82-83 01-11-82 51-29-82 ADJUSTMENTS.
42-04 52-81-82 02-28-82 85-24-76 10-01-82 NIGNER CAPITAL COSTS AND LOWER THAN 82-85 B3-81-82 83-30-82 EXPECTED DEMAND FOR ELECTRICITY.
82-06 83-15-42 04-23-82 89-23-80 10-80-83 INCREASE OF SCOPE DUE TO DESIGN CHANGES l
8 NEW REGULATORY REQUIREMENTS. DESIGN PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT.
REFINEMENT OF ESTIMATES. PND LIMITS ON Inspection Reports are available at loca! PDRs.
YEARLY CAPITAL AVAILABLE.
82-20-81 15-80-84 REFINEMENT OF MANHOUR ESTIMATES AND DURATIONS REQUIRED TO COMPLETE REMAINING ENGINEERING AND FIELD W3RK.
l L0 CAL PURLIC DCCUMENT R 0 0 M:
POTTSTDWN PUBLIC LIBRARY 508 HION STREET l
POTTSTDWN PENNSYLVANIA 19464 l
C0NSTRUCTION 5TATUS REP 0RT PAGE NO: 2-06S LIMERICK l NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 C0N$TRUCTION STATUSt APPLICANT'S CUR *ENT ESTIMATED FUEL LOADING DATE:
10-00-84 APPLICANTS CONS!RUCTIDH COMPLETI0M ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
10-00-83 DEFINED IN CP (EARLIEST) 10-00-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
04-00-79 (LATEST) 10-00-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-08-85 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE: J>rf 79f1h COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WE CONTINUE TO REPORT THE OVEPALL COMPLETION PERCENTAGES BASED ON ON* TOTAL SCOPE AND NANNOUR EXPENDITURES.
wSTIMATED ACTUAL ESTIMATED ACTUAL ESTIMAT'ED START 11AE COMPLETION COMPL M % COMPLETE MOBILIZE AND PREPARE SITE:
05-00-70 05-00-70 09-00-74 09-00-14 10c%
PLACE STRUCTURAL CONCRETE:
07-03-74 07-00-74 11-00-80 11-00-80 100%
INSTALL REACTOR PRESSURE VESSEL:
11-00-76 11-00-76 12-00-76 12-00-76 100%
INSTALL LARGE BORE PROCESS PIPE:
01-c0-76 01-00-76 02-00-83 JWMc Tfj INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBEASE 01-00-76 01-00-76 04-C2-83
.39RS3'E
- =-
INSTALL SMALL BORE PIPE:
01-00-77 01-00-77 06-00-d3 JA4/76${
INSTALL CABLE TRAY:
01-00-76 01-00-76 02-08-83 I
01.se-84 100%
INSTALL EXPOSED METAL COPDUIT:
02-00-76 02-00-76 11-00-83
.PetII.1%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-00-81 01-00-81 01-00-84 sWMCfyg INSTALL ELECTRICAL TERMINATIONS:
01-00-88 01-00-81 03-00-84 J4tj7g CONDUCT REACTOR COLD NYDR0 STATIC TEST:
'00-83
.3$-00-83 0%
CONDUCT NOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
07-00-82 0$".40HRL 10-00-84
.64 /jF,
-t
C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-066' LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF:
03-31-82 PLANT CHARACTERI5 TICS:
KEY PERSONNEL DOCKET NO:
85000353 CORPORATE CONTACT:
V. S. BOYER. SEMICR VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-187/ 06-19-74 NUCLEAR POWER CP EXPIRATION DATE:
10-01-87 CORPORATE ADDRESS:
PHILADELPHIA ELECTRIC COMPANY APPLICANT:
PHILADELPHIA ELECTRIC 2301 MARKET STREET PLANT LOCATION:
35 MI NW OF PHILADELPHIA, PA PHILADELPHIA. PENNSYLVANIA 19101 IE REGION:
1 CORPORATE PHONE NO:
(215) 841-4500
.AE:
BECHTEL NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
BECHTEL NRC LPM.
M. ABELSON REACTOR TYPE:
N Sg.CM(ggjgY DER (MWE):
1065 IE RESIDENT INSPECTOR:
IN5PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITY Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER DF INSP.
OF INSP.
09-27-74 10-01-81 DELAY ENTIRELY ATTRIBUTABLE TO FINANCING 82-01 01-26-82 02-02-82 PROBLEMS.
82-02 01-11-82 01-29-82 10-15-75 01-01-82 SCHEDULE REFINEMENT AND BUDGET 82-03 02-01 02-28-82 ADJUSTMENTS.
82-04 03-01-82 03-30-82 05-24-76 10-01-84 NIGNER CAPITAL COSTS AND LOWER THAN EXPECTED DEMAND FOR ELECTRICITY.
09-23-80 10-00-86 INCREASE OF SCOPE DUE TO DESIGN CHANGES 8 NEW REGULATORY REQUIREMENTS, DESIGN Inspection Reports are available at local PDRs.
PROBLEMS ASSOCIATED W/ MARK II CONTAINMENT, REFINEMENT OF ESTIMATES AND LIMITS ON YEARLY CAPITAL AVAILABLE.
02-20-81 04-00-87 REFINEMENT OF MANNOUR ESTIMATES AND l
DURATIONS REQUIRED TO COMPLETE REMAINING ENGINEERING AND FId.D WORK.
0744-D MA/D64 EANIftd Pena Vaseia [q4N*c b og8 4,
- c. w,37 k C44fCf khh 2 L0 CAL PUBLIC D0CUMENT R 0 0 M:
POTTSTOWN PUBLIC LIBRARY 500 MIGH STREET POTTSTOWN. PENNSYLVANIA 19464 a
C0NSTRUCTION STATUS REPORT PAGE NO: 2-067*
LIMERICK 2 NUCLEAR POWER PLANTS STATUS AS OF 03-31-82 C0N5TRUCTION
$TATU5 g
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N NM APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
"O 0 0 0', d-ee-f7 DEFINED IN CP: (EAPLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
09-00-80 (LATEST) /s g. g APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 04-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 30%
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: IJE CONTINUE TO REPORT OVERALL COMPLETION PERCENTAGES BASED ON TOTAL SCOPE AND MANHOUR EXPENDITURES.
ESTIMATED ACTUAL FSTIMATED ACTUAL ESTIMATED START 11 ART fatLP@g
{pMPLETION % COM? TETE MOBILIZE AND PREPARE SITE:
05-00-70 05-0070 09-00-74 09-00-74 200%
PLACE STRUCTURAL CONCRETE:
09-00-74 09-00-74 11-00-80 11-00-80 100%
INSTALL REACTOR PRESSURE VESSEL:
09-00-77 09-00-77 10-00-77 10-00-77 100%
INSTALL L ARGE BORE PROCESS PIPE:
01-00-76 01-00-76 04-00-85 34422'%
INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND $NUBBERS:
01-00-76 01-00-76 12-00-84
.AM (37, INSTALL SMALL BORE PIPE:
01-00-78 01-00-78 01-00-85
-44 N INSTALL CABLE TRAY:
06-00-78 06-00-78 06-00-85
.A4t l3T INSTALL EXPOSED METAL CONDUIT:
12-01-82 04-00-86
. Der 37, INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
01-0C-84 09-00-86 0%
INSTALL ELECTRICAL TERMINATIONS:
03-00-84 11-00-86 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
05-00-86 05-00-86 0%
CONDUCT NOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
08-00-85 04-00-87
',