ML20127D513
Text
_ _ _ _ _ _ _ - _
s DuxE Powza GOMPANY P.O. BOX 33189 CHAR 1,OrTE. N.C. 98949 HALB.TUCKEN ret.rrnown vu.s resement (704) 073-4531 stuaae renoiretseme October 29, 1982 Chief, Management Information Branch Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: McGuire Nu<, lear Station, Unit 2; Docket No. 50-370 Catawba :<uclear Station, Units 1 and 2; Docket Nos. 50-413 and 50-414 0'..sokee Nuclear Station, Units 1, 2, and 3; Docket Nos. 50-491, 50-492, and 50-493
Dear Sir:
Attached please find Third Quarter,1982 Yellowbook (NUREG-0030) updates for the above referenced units, i
Very truly yours, 1
A)B.'t L. J wpg y
Hal B. Tucker ROS/php Attachments i
cc:
Mr. W. H. Lovelace Office of Resource Management i
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 41g7840606 PDR LLEFEe4-367
i C0N5TRUCTION 5TATUS REPQRT PACE NO: 2-868 MCGUIRE 2 NUCLEAR POWER PLANT 5 STATUS A5 0F: 0 82 PLANT CHARACTERI5 TIC 5:
EEY PERSONNELt DOCRET NO2 85808378 CORPORATE CONTACT:
M. 8. TUCKER VICE PRESIDENT CP MO. 8 DATE ISSUED: CPPR-84 / 82-23-73 NUCLEAR PRuuw.?**4 DUKE POWER CD.
CF EXPIRATION DATE:
83-01-77 CORPORATE ADDRES5*
PS 33189. 422 5. Cn.2CN STREET APPLICANTS DUKE POWER CHARLOTTE. HORTN CAROLINA 28242 PLANT LOCATION 17 MI N OF CHARLOTTE. NC IE REGION:
2 CORPORATE PHONE NO:
(784) 373-4534 AEt DUEE POWER M555 WESTINGHOUSE CONSTRUCT 02:
DUKE POWER NRC LPM R. BIRKEL REACTOR TYPE PWR IE PROJECT INSPECTOR DER (MWE3 1988 IE RESIDENT INSPECTOR:
P. R. SEMIS IN5PECTION 5TATU5 FUEL L0AD DATE CMANGE5 TIME PERIOD A5 REPQRTED 8Y U T I L I T Y:
Ane. 1982 - Jun. 1982 REPCRT NEW REASON FOR CHANGE REPORT SEG DATE END DATE DATE SCHEDULE REPORTED SY UTItfTY MUMBER OF INSP.
OF INSP.
85-81-77 INITIALLY DELAYED IN RECEIVING CONSTRUCT-8287 84-28-82 84-23-82 ION PERMIT. CONSTRUCTION DELAYED SY 8288 85-11-82 85-14-82 INCREASED DELIVERY TIME OF MATERI AL AND 8218 85-11-82 85-14-82 COMPONENTS.
4211 85-11-82 86-19-82 87-26-74 12-15-77 CONSTRUCTION DELAYED SY INCREASED 8212 84-17-82 85-15-82 DELIVERY TIME OF MATERI AL AND COMPONENTS.
8213 86-87-82 06-19-82 89-27-74 88-88-78 CONSTRUCTION DELAYS DUE TO CRITICAL 8214 86-15-82 86-18-82 CONDITIONS EXISTING IN THE FINANCIAL MARKETS.
Inspection reports are available at local PDRs.
84-21-76 89-15-78 HO REASON GIVEN SY THE UTILITY.
84-18-77 C3-88-79 CONSTRUCTION DELAY.
88-16-77 N/5 LATE EQUIPMENT DELIVERIES. DESIGN MODIFICATIONS 89-28-77 10-19-88 DUE TO CHANGED REGULATORY REQUIREMENTS.
88-13-79 81-88-82 NO REASON GIVEN.
88-88-88 86-88-82 HD REASON PROVIDED.
18-29-81 84-81-83 HD REASON PROVIDED.
I L0 CAL PUSLIC D0CUMENT R 0 0 Ms ATEINS LIBRARY UNIV. OF NORTN CAROLINA l
UNCC STATION CHARLOTTE. NORTN CAROLINA 28223 4
r t
l l
O C0N$TRUCTION 5TATU5 RFPORT PAGE No 2-069 j
MCGUIRE 2 NUCLEAR POWER PLANT 5 STATUS A5 0F 06-30-82 C0N5TRUCTION 5 T A T U 5:
l APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
04-08-83 APPLICANTS CONSTRLtCTION COMPLETION ESTIMATE AS l
APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-00-82 DEFINED -IN CP (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-76 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMMERCIAL DPERATION DATE: 34-01-84 3
si CURRENT ESTIMATED PERCENT CONSTRUCTIDM COMPLETE: 4MP g $7,2 7 COMMENTS REGARDINC CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START iLARL COMPLETION
[QMPLETIQM 3._ COMPLETE MOBILIZE AND PREPARE SITE:
04-01-71 05-08-12 100%
- : -*3 -93 PLACE STRUCTURAL CONCRETE:
05-08-72 44-*+-ee 99%
INSTALL REACTOR PRE 554FE VESSEL:
06-09-75 06-10-75 100%
INSTALL LARGE BORE PROCESS PIPE:
03-01-75 12-01-82 99%
- 1 -ot-t3 INSTALL LARGE BORE PIPE MANGERS RESTRAINTS AMD $NUBBERS:
04-08-75 N
90%
INSTALL SMALL BORE PIPE:
04-01-78 01-08-83 98%
INSTALL CABLE TRAY:
08-01-74
^
98%
~
b
.. INSTALL EXPOSED METAL CONDUIT:
08-01-74 98%
INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:
04-01-77 Y3 98%
INSTALL ELECTRICAL TERMINATIONS:
04-15-77 Y
d 98%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
07-19-82 05-24-82 07-28-82 OS-U~E 100%
CONDUCT HOT FUNCTIONAL TEST 09-01-82 87*38-31 10-26-82 CS *lT -42.
geogg CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
10-27-82 01-27 94-01-83 28 8%
.