ML20127D510
Text
O Consumers Power Company M6dlend Project:
P.O. Box 1963. Midland. Michigan 44640. Aree Code 517 631 0951 October 25, 1982 Mr. R. A. Hattfield Chief, Management Ir. formation Branch Offace of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C. 20555 MIDLAND PROJECT GWO 7020 NRC SQiEDULE File: 0652.1 UFI: 53*54, 70*01 Serial: CSC-6394 Attached is the October 1, 1982 information for updating the status of Midland Units 1 and 2 of the NRC Yellowbook.
'Ihe construction percent complete is 83% for both Units 1 and 2.
f tk d
D. B. Miller Site Manager DBM/DDJ/klb Attachment cc:
Mr. James G. Keppler, Regional Director, Region III Mr. Wayne Schaefer, Midland Project Inspector, Region III Mr. Frederick C. Williams, Isham Lincoln & Beale, Washington Mr. Phil Steptoe, Isham Lincoln & Beale, Chicago 05041%350040#
hLEFE
-367 PDR
~ -..-
.. ~
~
[
C0D5TROCTIOO STATUS AEP0RT PAGE Nes 2-C55 hMIDLAN31 OOCLEAR P0WER PLCDTS ST.*TUS AS OF. ' 9/30/82 PL4NT CMARACTERI$TICSs EEY P E R'S O N N E Le DOCKET Nes 85084329 CORPORATE CONTACT:
J. W. Cook.'Vice President CP NO. E DATE ISSUEDs CPR-St / 52-14-72 Frojects. Eng & Cosastruction CP EXPIRATION DATES 12-01-84 CORPORATE ADORES $s 1945 W. Parnall P.oad APPLICANTS CONSUMERS POWER COMPANY PLANT LOCATION:
Midland. MI 48640 Jackson MI 49201 IE REGION:
III CORPORATE PHONE Net
-(St73 788-0453 I
AEs BECNTEL NRC LPMs S. N000 '
s NS$5s BASCOCE & MILCOX IE PRINCIPAL INSPECTORS CONSTRUCTOR:
SECNTEL
-CONSTRUCTION:' R. J. COOK (RESIDENT INSPECTOR)
REACTOR TYPEr PWR
-TEST AND STARTUPs DER (NWE):
492 (4.000.000 Lb/Er process steam)
IE RESIDENT INSPECTOR:
IN5PECTISN STATUSs FUEL L0AB BATE CNAN4E$
TIME PERIOD A5 REPORTED 5Y UTILITYs E
REPORT NEW REASON FOR CHANGE REPORT BES DATE END DATE BATE SCNEBULE REPARTER BY UTILITY NUMAER OF INSP.
OF IMSP.
18-07-74 11-80-44 CONSTRUCTION SCHEDULE STRETCHOUT TO REDUCE CURRENT CASH OUTFLOW.
e' 41-84-75 11-80-88 CONSTRUCTION SCNEDULE STRETCHED OUT TO REDUCE CURRENT CAST GUTFLOW.
99-90-80 12-90-43 PteJECT SCHEDULE REEVALUATION INCORPORATING OUTSTANDING LICENSING ISSUES.
I b
LeCAL PUSLIC 3 0 C U M E N T R S 0 MssRACE seu MEMORIAL LTSRARY
~
.1798 M. ST. ANDREMS R048 I
- MIDLA888 MICNIGAN 44448
't
- l e.
4 E
C00STROCTIOQ STATUS REP 0Ri PAGE NO: 2 086 MID*AnD T D0CLEA0 POOEQ PLACTS STiTUS AS OP 9/30/82-C0NSTRUCTIoN STATUSs APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATES 12-08-45 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-88-81 DEFINED IN cps (EARLIEST)
Dee==nhar 1. 1983 APPtICANT'S ESTIMATES FUEL LOADING DATE AT CP ISSUANCES 11-80-79 (LATEST)
De h r 1. 1984 APPLICANT'S CURRENT ESTIMATED CaretERICAL OPERATION DATE: 87-40-84*
CURRENT ESTIMATES PERCENT CONSTRUCTION COMPLETE: 83%
CarW9ENTS REGARDING CURRENT CONSTRUCTION STATUS:
s ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED STAar CMfLETION conPLETION 2 COMPLETE MetILIZE ANS PREPARE SITES 3-73 JOU %
PLACE STRUCTURAL CONCRETE:
8-73 99 4 INSTALL REACTOR PRESSURE VCSSEL:
6 'i8 -
8-7b 200 %
INSTALL LARGE SSRE PROCESS PIPES 7 *,6 1-83 98 %
- !NSTALL LARGE SORE PIPE MANGERS. RESTRAINTS AND SNUSSERS:
12-77 3-83 97 %
INSTALL SMALL DORE PIPES 1-77 4-83 97 %
INSTALL CABLE TRAY:
4-77 32-82 99 %
INSTALL EXPSSES METAL CONDUITS 4-77 6-83 93 %
INSTALL POWER. CONTROL. INSTRUMENTATION,AND SECURITY CABLE:
11-78 6-83 94 %
INSTAtt ELECTRICAL TERMINATIONS:
6 -78 7-83 80 %
CSNSUCT REACTSR COLD NYDRGSTATIC TESTS 12 12-82 CONSUCT NOT FUNCTIONAL TESTS 5-83 6-83 CONSUCT PRESP ANS ACCEPTANCE TESTS MECESSARY FOR FUEL LOADS 10-82 12-83
- Cosessercial operation for both process stem and electrical..
- Percent complete is large bare hangers. Restraints and sratters are not inclu1ed.
- Structural camerete is 99h couplete with minimal remaining to be done as requirai. Does not include structural concrete aeiated with soils fix.
e
- s mW h
1
___m._
m C e O 5 T a e C T I e Il &T&TUS REP' ORT PAGE Iles F-ec7 MIaLANs 2
.4OCLEAR P S C3 E R P L A O T 4 ST*TUS Al eft 9/30/83 P L A II T CNARACTERI5 TIC 58 EEY PERSSNNELI J. WJ M. n Presh
'30CEET 300s 85848334 CORPeRATE CONTACT:
'* IIs. 4 SATE ISSWES Cre-42 # 12-14-72 Ptejects. Eng & Cemetructies 8'
- EMPIRATIGII 3&ggs 07-01-44 CSRPORATE ASSRESS' 1945 B. Parmall Emed APPLItamTs CSIISURERS PebER CeIFANY
"".M 49M PLAIIT LeCATIGIIs neid1==d. NI 48640 -
IE REGIGIIs
!II CSEPORATE PIISIIE IISs (5173 788-0453 -
AEs DECIITEL IEC LPHs
- 9. 81009 Is5558 SaeceCE & IIILCSE~
IE PR&aICIPAL IsISPECTOR:
e.'
CeIISitecites
.SECNTEL
-CSIISTRWCTIGII:
R. J. Cast (aESIDENT IIISPECTOR)
REACTea TYPE:
-TEST AIIS STARTUP:
y 3ER ts00E3s 4 94 IE RESISENT INSPECTets INSPECTIeM S T A T W Se FWEL lea 3 3 ATE CNAN4ES
., - TIIIE PERIce AS REFSRTE3 8Y.5TILITYs REPORY IIEIf REAleII PSE REPest SES SATE East DATE matt StaIERIIL E REPEATER SY MTILITY M
N 1mSP.
AP 1MSP.
11-07-74 11-04-79 CGIISTRUCTIGII SCNESULE STRETCNES SWT TS'
. 0-REeWCE CURRENT CASII SUTFLest ANIISIIIICES SY -
e t
WTILITY.
Ot-94-75 11-04-44 CGIISTRtICTISII SCIIESIILE STRETctIED SUT.
49-18-79 06-04-49 DEVELeftIERIT SP A TIIS IIIIIT IIITEGRATED TEST SCIItSIILE.
~.
. 09-40-4e 37-00-43 PeeJECT SCIIESIILE REEvaluATIGII IIICORPeRATIIIe SWTSTAIISIII6 LICESISIIIe ISSWES.
3
[
~
I LeCALPW3LIC30CUMENY R e e Na seaCE Seu IIDIeRIAL LItaARY
~ l 1788 M. ST. AIIORBIS 8048
~
MISLAIIS MICaIIGAII 44644
- W_
4 E
1 i
e
c C8O5TROCTIOO $TATCS_QEF0RT PAGE lesa 2-3AS CID'AD2 OOCLEaO POOER PLoOTS ST;TUS AS OF 9/30/"2',
CONSTRUCTION 5 T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE 07-09-23 APPLICANTS CateSTRtecTIces CeMPLETIOet ESTIMATE AS APPLICANT'S ESIIMATED FSEL LSADING DATE AT CP ISSUANCE:
88-90-78
~ DEFINES IN cps (EARLIEST) July 1, 1983 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
86-08-88 (LATEST)
July 1, 1964 APPLICANT'S CURRENT ESTIMATES CeeveERICAL OPERAT100s DATE: 82-88-83 e
CURRENT ESTIMATED PERCENT CateSTRUCTIsse CenPLETE: 83%
CetWEENTS REGAR9Iset CURRENT C80eSTRUCTItal STATU$s ESTIMATED ACTUAL ESTIIeATED ACTUAL ESTIMATED l
START CEFLETIall canPLETIGel 2 CanPLETE reBSILIZE ANS PREPARE SITES 8-73 100 %
PLACE STRUCTIIRAL CateCRETE:
8-73 99 h INSTALL REACTOR PRESSURE VESSELS 4-78 5-78 100 %
I INSTALL LARGE SSRE PROCESS PIPES 4-76,
1-83 98 %
' ' INSTALL LARGE DeRE PIPE IsA800ERS, RESTRAINTS AND SeeUBBER$s 11-77 3-83 93 5 INSTALL SMALL Bete PIPES 3-77 4-83 93 %
j INSTALL Caste TRAY:
4-77 12-82 99 %
4-77 6-83 87 %
INSTAti EXPOSES stETAL CasseUITs INSTALL PeedER.CeelTROL.INSTRUMENTATIcet,AND SECURITY CABLE:
1-78 6-83 94 %
INSTALL ELECTRICAL TERMINATItsess 6-78 7-83 80 %
CSesOUCT REACTOR COLD NYDR0 STATIC TESTS 12-82 12-82 CeleDUCT NOT FUseCTItseAL TESTS 1-83 3-83 CasseuCT PRESP AteS ACCEPTA80CE TESTS NECESSARY FOR FUEL LSA8s 8-82 7-83
- Percent ensplete is Idge txre twgers. leestraints and snubbers are not included.
- Structural amcrete is 995+ onuplete with minimal remaining to be dme as regtaired. Des rut include shulm.1 cxmcrete==ww-iated with soils fix.
~
l
.e l
i I
6