Forwards Updated Const Status Repts as of 830619.Info for Inclusion in Yellow Book
ML20127D482
Person / Time
Site: 05000000, Vogtle
Issue date: 08/15/1983
From: Foster D
GEORGIA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 GN-249, NUDOCS 8504150308
Download: ML20127D482 (8)


Text

-

Geg:a Fower Compary 333 P ecmoe1 Ave %e At:anta. Georg a 30308.

Teiechone 404 526-7726 Maeg Addrett Post off,ce Boa 4545 Atlanta Gecfg a 30302 h

Georgia Power

o. o. Foster the sout%m etecinc system Vice Pres; cent and General Manager Vogtle Project August 15, 1983 Chief, Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington,.D. C.

20555 File: X78G48 L g:

GN-249

Reference:

50-424/50-425 Gentlemen :

Infomation is provided herewith for your use in updating the NRC Construction Status Report (yellow book). Should you have any questions pertaining to this report, please contact my office at (404) 526-7713.

Very truly yo s,

da D. O. Foster REF/D0F/cc attachments xc: James P. O'Reilly, NRC Region II.

R. E. Conway D. E. Dutton R. H. Pinson L. T. Gucwa

. H. H. Gregory, III 840606

^

~367 pgR

~

. ~. <

e-.----

e

C 0 N S i R'O C T I O N STATUS R E P 0 R T-

PAGE N0:

2-138 UNIT l'

NUCLEAR P U.p C R PLANTS STATUS AS OF: 06-19-83 PLANT C H A R A C T E R I S'T I C S:

K E Y-P E R S O N N E L:

DOCKET NO:

05000424 CORPORATE CONTACT:

D. O. F0 STER, VICE PRESIDENT AND CP N0. & DATE ISSUED:

CPR-108/06-28-74 GENERAL MANAGER, V0GTLE PROJECT

~ CP EXPIRATION DATE:

03-01-88 CORPORATE ADDRESS:

GEORGIA POWER COMPANY APPLICANT:

GEORGIA POWER COMPANY P. O. BOX 4545, ATLANTA, GA. 30302 PLANT LOCATION:

BURKE COUNTY / GEORGIA CORPORATE PHONE NO:

(404) 526-6526' II REGION:

II NRC LPM:

M. MILLER AE:

SOUTHERN SERVICES /BECHTEL IE PRINCIPAL INSPECTOR:

NSSS:

WESTINGHOUSE

-CONSTRUCTION:

CONSTRUCTOR:

GPC

-TEST AND STARTUP:

REACTOR TYPE:

PWR IE RESIDENT INSPECTOR:

W. F. SANDERS DER (MWE):

1167 INSPECTION S T A T U S:

FUEL LOAD DATE CHANGES AS REP 0RTED BY U T I L I T Y:

TIME PERIOD REPORT BEG DATE END DATE REPORT NEW REASON FOR CHANGE NUMBER OF INSP.

OF INSP.

DATE SCHEDULE REPORTED BY UTILITY 09-27-74 Not Known Construction Suspended For Financial Reasons 05-11-77 05-00-83 No Reason Given 01-09-78 05-01-84 Overestimated Projected Need For Power 07-17-80 11-00-84 No Reason Given 11-18-81 09-01-86 Schedule Reassessment L0 CAL PUBLIC D0CUMENT R 0 0 M:

BURKE COUNTY LIBRARY 4TH STREET WAYNESBORO GEORGIA 30830

C0NSTRUCT'I0N S T A' T U S R E P 0'R TL PAGE NO:

2-139 3

' UNIT 1

NUCLEAR P 0 W.E R PLANTS STATUS.AS.0F:

06-19-83.

C0NSTRUCTI0'N S T A T U S:

~

APPLICANT'SClJRRENTESTIMATEDFUELLOADINGDATE:

09-01-86 APPLICANT'S CONSTRUCTION COMPLETION

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00 ESTIMATE AS DEFINED IN CP:

' APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-79 (EARLIEST) 03-01 --

APPLICANT,'S CURRENT ESTIMATED COMERCIAL OPERATION DATE:

03-01-87 (LATEST) 03-01-88 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

55.8%

DATE CONSTRUCTION STARTED:

08-01-761 CURRENT ESTIMATED CONSTRUCTION DURATION.IN MONTHS:

126' COMENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION

% COMPLETE-MOBILIZE.AND PREPARE SITE:

08-01-76 09-15-77 100 PLACE STRUCTURAL CONCRETE:

08-01-78 02-15-84 89.2 %:

INSTALL REACTOR PRESSURE VESSEL:

02-21-83 03-15-83 03-16-83

.100 INSTALLED LARGE BORE PROCESS PIPE:

09-01-80 05-01 42-I

. INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND-SNUBBERS:

09-01-80 05-01-86 19 INSTALL SMALL BORE PIPE:

07-01-81 05-01 21 5-INSTALL CABLE TRAY:.

09-22-80 04-01-85 67.7 %

INSTALL EXPOSED METAL-CONDUIT:

11-01-81 01-01-86 20.5 %

INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:

03-01-83 01-15-83 11-01 1.4 %-

INSTALL ELECTRICAL TERMINATIONS:

08-01-83E 01-01 0 CONDUCT REACTOR COLD HYDROSTATIC TEST:

03-01-86 04-01-86 O

%~

CONDUCT HOT FUNCTIONAL' TEST:

05-15-86 07-15-86 0

~

LCONDUCT. PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

07-24-84 08-01-86 0

C0NSTRUCTI0N STATUS REP 0RT

.PAGE N0:

2-140 UNIT 2 NUCLEAR P0WER PLANTS STATUS AS OF:

06-19-83 PLANT C H A R A C T E R I S T I C S:

K'E Y P E R S 0 N N E L:

DOCKET N0:

05000425 CORPORATE CONTACT:

D. O. FOSTER, VICE PRESIDENT AND CP NO. & DATE ISSUED:

CPR-109/06-28-74 GENERAL MANAGER, V0GTLE PROJECT CP EXPIRATION DATE:

09-19-89 CORPORATE' ADDRESS:

GEORGIA POWER C0!!PANY APPLICANT:

GEORGIA POWER COMPANY P. O. B0X 4545, ATLANTA, GA. 30302-PLANT LOCATION:

BURKE COUNTY / GEORGIA CORPORATE PHONE N0:

(404) 526-6526 II REGION:

II NRC LPM-il' MILLER AE:

SOUTHERN SERVICES /BECHTEL IEPRINblPALINSPECTOR:

NSSS:

WESTINGHOUSE

-CONSTRUCTION:

CONSTRUCTOR:

-GPC

-TEST AND STARTUP:

REACTOR TYPE:.

PWR IE RESIDENT INSPECTOR:

W. F. SANDERS 1167 DER (MWE):

INSPECTION S T A T U S:

FUEL LOAD-DATE CHANGES AS REP 0RTED BY U T I L I T Y:

TIME PERIOD REPORT BEG DATE END DATE REPORT NEW REASON FOR CHANGE NUMBER OF INSP.

OF INSP.

DATE SCHEDULE REPORTED BY UTILITY 09-27-74 Not Known Construction Suspended For Financial Reasons 05-11-77 05-00-84 No Reason Given 11-02-77 05-00-85 Overestimated Projected Need For Power 07-17-80 05-00-87 No Reason *Provided l

11-18-81 03-01-88 Schedule Reassessment L0 CAL PUBLIC D0CUMENT R 0 0 M:

l i

i BURKE COUNTY LIBRARY 4TH STREET j

WAYNESBORO, GEORGIA 30830

'a

'C 0 N S T R U C T.I O N STATULS R E P.0 R T PAGE N0:-

2-141

' UNIT 2

NUCLEAR P0WER PLANTS STATUS AS OF:

06-19-83 t

CONSTRUCTION S T A T U S:

il APPLICANT'S CURRENT ESTIMATED' FUEL LOADING DATE:

03-01-88 APPLICANT'S' CONSTRUCTION COMPLETION 05-00-87 ESTIMATE AS DEFINED IN CP:

APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-80 (EARLIEST) 09-19-87

'09-01-88 (LATEST) 09-19-89 APPLICANT'S CURRENT. ESTIMATED COMERCIAL OPERATION DATE:

i CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

17.8%

DATE CONSTRUCTION STARTED:

08-01-76 CURRENT ESTIMATED CONSTRUCTION DURATION.IN MONTHS:

~ 147

' COMENTS REGARDING CURRENT CONSTR' CTION STATUS:

J ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START-START-COMPLETION COMPLETION

% COMPLETE i MOBILIZE AND PREPARE SITE:

08-01-76 09-15-77 100; i

PLACE STRUCTURAL' CONCRETE:

08-01-78 08-15-84--

62.7 %

INSTALL REACTOR PRESSURE VESSEL:

08-01-84 09-15-84 0

. INSTALLED LARGE BORE PROCESS PIPE:

09-01-80 11-01-87 1.8 %-

INSTALL LARGE. BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

09-01-80 11-01-87 3

INSTALL SMALL BORE PIPE:

02-01-83 02-06-83 04-01-88 5

INSTALL CABLE TRAY:

09-22-80 10-01-86 12.8 %

INSTALL EXPOSED METAL CONDUIT:

03-01-83 07-01-87 0.7 %

INSTALL POWER, CONTROL, INSTRUMENTATION AND. SECURITY CABLE:

09-01-84 05-01-87 0

I INSTALL: ELECTRICAL TERMINATIONS:

11-01-84 07-01-87 0'

- CONDUCT REACTOR COLD HYDR 0 STATIC TEST:

09-01-87 10-01-87 0

CONDUCT HOT FUNCTIONAL TEST:

12-15-87 02-15-88 0

l

' CONDUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

01-24-86 02-01-88 0

T

~

Q Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101 = 215 / 770 5151 August 12, 1983

'R.

A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.

20444 SUSQUEHANNA STEAM ELECTRIC STATION CONSTRUCTION STATUS REPORT (NUREG 0300)

ER 100450 FILE 841 PLA-1791

Dear Mr. Hartfield:

In response to your request for quarterly input to the Construction Status Report (NUREG 0300), please find enclosed an update of Susquehanna's Status.

The report reflects data as of the end of June, 1983.

Comments or questions regarding this information may be addressed to John M.

Finnegan, (215) 770-7875.

Sincerely, f RsDwKA f

N. W. Curtis Vice President Engineering and Construction - Nuclear JMF/nd Enclosure cc:

W.

E. Barbarich A6-1 J. M. Finnegan A2-3 R. M. Harris A6-1 R. A. Mazzini A2-3 SRMS Corresp. File A6-2 SRMS Letter File A6-2 Date File A2-2 NP&C File (2)

A2-3

~

C0NSTR9CTIOQ STATUS REPORT PAGE NO: 2-12

'WDSOUEIANNA 2 NUCLEAR POMER PLANTS STATUS AS OF 06-30-83' PLANT CHARACTERISTIC 38 KEY PERS0NNEL DOCRET NO:

65000344 CORPORATE CONTACT:

N. W. CURTIS, VICE PRESIDENT ENGINEERING 8 CONSTRUCTION CP MO. 8 DATE ISSUED: CPPR-192/ 19-02-73 CF EXPIRATION DATE:

03-31-84 CORR 0 RATE ADDRESS:

2 NORTH Ninth Street APPLICANT PENNSYLVANIA POWER 8 LIGHT ALLENTOWN, PENMSYLVANIA-18101 PLANT LOCATION:

7 MI NE OF BERWICR, PA IE REGION:

1 CORPORATE PHONE N0s (215) 770-7501 AE8 SECHTEL CSSS:

GENERAL ELECTRIC R. PERCll CONSTRUCTOR 8 SECHTEL NRC LPM:

REACTOR TYPES

  • BWR IE PROJECT INSPECTOR:

DER (HME):

1952 IE RESIDENT INSPECTOR:

6. G. RNOADS i

IOSPECTION 5TATUS F'U E L L0AD D A T E-C H A N G E S l

TIME PERIOD A5 REPORTED BY UTILITYi Jan. 1982 - Mar. 1982 REPORT NEW REASON FOR CPANGE REPORT SEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-10-74 11-01-81 REVISED LOAD FORECASTS FOR THE 1980:5.

t 82-01 01-19-82 01-22-82 02-00-80 04-08-82 NO REASON PROVIDED.

82-02 02-01-82 02-04-82

~10-30-80 18-08-82 NO REASON PROVIDED.

I 82-03 02-19-82 02-25-82 I

09-30-81 07-08-83 NO REASON PROVIDED.

i 12-31-81 01-01-84 NO REASON PROVIDED.

P Inspectlen Reports are avaltable at local PDRs.

1 j

L0 CAL P U B L I C' D0CUMENT R 0 0 Ms OSTERN0GT FREE LIBRARY 78 SOUTH FRANRLIN STREET WILRES-BARRE, PENMSYLVANIA 18701 i

l

\\

i 4

C 0 0 5 T R O'c T I O Q STATUS REPORT PASE N#s.2-027 STATUS AS '0:06-30-83..

SUS 90ENANNA 2 NUCLEAR POMER PLANTS C0NSTRUCTION STATUS 8 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

. 31-90-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

07-15-85 DEFINED IN cps (EARLIEST) 11-88-88 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 11-01-80 (LATEST) 95-S1-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 11-08-54 i

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

92%

COMMENT

  • REGARDING CURRENT CONSTRUCTION STATUS ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START COMPLETION g E COMPLETE 4

1984 1-

-S MOBILIZE AND PREPARE SITE:

PLACE STRUCTURAL CONCRETE:

18-88-74 89-00-78 test 12-00-76 07-00-77 190E INSTALL REACTOR PRESSURE VESSEL:

06-00-82 100%

e4-se-s2 INSTALL LARGE BORE PROCESS PIPE:

INSTALL LARGE BOGE PIPE MANGERS. RESTRAINTS AND SNUDSER$8 SS-80-77 09*00-83 96%

INSTALL SMALL f8RE PIPE:

89-00-75 04-00-83 99%

I 84-80-77 04-08-82 lett INSTALL CALLE TRAYS 07-00-75 04-00-83 99%

INSTALL EXPOSED METAL. CONDUITS INSTALL POWER,' CONTROL, INSTRUMENTATION AND SECURITY CABLE:

84-00-79

'06-00e83 99%

10-80-79 09-00-83 97%

INSTALL ELECTRICAL TERMINATIDMS8 06-se-se 06-20-83 100%

CONDUCT REACTOR COLD NYDR0 STATIC TEST!

N/A N/A N/A N/A N/A CONDUCT NOT FLnCTIONAL TESTS CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOADS 01-00-84 31%

j i

e a

e a

j

9 Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372 5000 July 25, 1983 G02-83-651 Docket No.:

50-397 50-508 Mr. R. A. Hartfield, Chief.

Management Information Branch Office of R.esource Management U. S. Nuclear Regulatory Commission-Washington, D. C.

20E55

Dear Mr. Hartfield:

Subject:

CONSTRUCTION STATUS REPORT (NUREG-0030)

Reference:

Letter, RA Hartfield to RL Ferguson, same subject, dated October 30, 1981 Enclosed for your information are the updated construction status reports for our Nuclear projects 2 and 3 as of June 30, 1983.

4 Very truly yours, b

,% ! = r h G. D. Bouchey, Manager Nuclear Safety and Regulatory Programs GCS/ cdp Attacnments cc: R Auluck NRC

^

M Thadani NRC WH Lovelace NRC NS Reynolds D&L A Vietti NRC

{

<r n c/~ I < u J q "I (PW4

t G.

v v

I C0H5TRUCTIOH 57ATUS REPQRT PACE NO: 2-123 y

WASHINGTON NUCLEAR 2 HUCLEAR PQWER PtAHTS STAIUS AS OF: DEC*. l982 f g r.C I

i.

O' l PLANT CHARACTER ! 5 T I C 5:

KEY PERS0NNEL:

3

", I l-1 DOCKET NO:

05000397

, CORPORATE CONTACT *-

R. L.."ERGUSON.' MANAGING DIRECTOR I CP NO. 8 CATE ISSUED:

CPPR-93 / 03-19-73 CP ExPIRATIDH DATE:

12-01-31 CORPORATE ADDRESS:

P. O. BOX 955 1.

APPLICANT:

WASHINGTON PU'LIC POWER SUPPLY SYSTEM I RICHLAND. WASHINGTCH 99352 i

PLANT LOCATION:

11. 25 MI NW OF RICHLAND, WA5!!

l l

l 4E REGION:

5 i

CORPORATE PHONE HO:

(5093 372-5000 l

l AE:

BURN 5 3 ROE l

l l

N555:

GENERAL ELECTRIC I

IE PRINCIPAL INSPECTOR: k Ad 'UCK 1

1 CONSTRUCTOR:

BECHTEL i

NRC LPM:

E.

kEUCK l

REACIOR TYPE:

EWR IE PROJECT IH5PECTCR:

I

'l DER (MWI):

1803 IE RESIDENT INSPECTOR:

R.

FEIL L

i H

IlIH5PECTION 5 T A T U 5:

FUEL L0A D DA T E CHANCE 5 l

l TIME PERIOD A5 REPORTED BY UTILITY l

Jan. 1952 - Mae, 1932 3

i REPORT NEW REASON FCR CHANGE l

l

. -REPORT BEG DATE END DATE DATE SCHEDULE FEPOPTED BY UTilTTY"""

l l

l NUM3ER OF TNSP, OF TNSP.

t 05-15-74 07-00-77 NO REASON HOTED.

I 32-01 01-11-82 01-15-82 0I-10-75 12-00-77 INSUFFICIEtIT MANPCWER BY NAJOR l

82-02 01-01-32 01-31-52 CONSTRUCTOR.

82-03 02-01-32 02-04-82 08-00-75 04-00-75 PERSISTING CIRTICAL PROBLEMS.

I i

82-04 02-03-82 02-12-52 02-00-76 01-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND l

82-05 02-08-32 02-23-32 MECHANICAL CONTRACTCRS.

I' l

'82-06 03-01-52 03-05-82 07-31-76 06-15-79 CIVIL CCf4 TRACT DEFAULT AND EXTENDED l

82-07 03-01-82 03-31-E2 LABOR DISPUIE.

l I

10-12-76 12-00-79 CONTINUED SLIPPAGE BY M?JOR CIVII AND I

l Inspection Reports are available at local PDRs.

I MECHANICAL CutlTRACTOR AND CONTIN' ING PIPE I J

l l

FITTER STRIKE.

l' l

l 01-17-77 03-00-80 PIPE FITTER STRIKE.

H I

l 04-27-79 03-00-81 SCHEDULE REEVALUATION I

06-00-30 03-00-82 HD REASON PROVIDED.

I 11-20-81 03-30-83 QUALITY PROBLEML. LABOR DISPUIE, 1

SCllE DUL E RE-EV AL U A T I ON.

ll l

03-31-82 09-00-83 SCHEDULE RE-LVALUATION.

I h

I l

1 I

I I

l I

l l

l l L0CA L PUBL IC D0CUMEHT R 0 0 M:

i I

RICHLAND PUELIC LIBRARY l

SUIFT AND HOMING /.TL SIREETS l

RICHL At D. MA51tIttGT0ti 99352 l

1 i

.)

-t.

l.

N' 0

g c

C0N$TRUCTION 5TA TUS REPORT

, PACE N3: 2-129 f

se:5f f!NGT ON NUCLEAR 2*

HUCLEAR, P O tJ E R P L A ti T 5 STATUS A5 0F:iWCH J J,.h

~

C0N5TRUCT IOH 5TA T U 5:

I 0 's -

APPLICANTS CONSTRUCTION CCMPLETION ESTIMATE A5 I

03/g o-r.3uG/32,

oEFInCo in CP: (EAet!Esr> v2-Oc-e2 I

APPLICAtiT'S CURRENT ESTIMATED FUEL LOADING DATE:

I APPLICANT *$ PRfv!OUS ESTIMATED ruCL LDAD!tiG DATE:

l APPLICAf4T'S E5finiTED FUEL LOADING DATE AT CP ISSUANCE:

04-00-77 (LATEST) 02-00-54 I

APPt !C A:iT 'S CURRErif EST IMAT ED C0=LRCI AL OPER AT ION DATE: 02-00-34 I

I l

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

95,2T I

i C0=ENTS RECARDING CURRENT CUNSTRUCTION STATUS:

I I

I ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

-l STAPT STAPT COP-p t E T T ON C0f*P t f 7 T ON % C C'*P t F T E l

I MOSILIZE AND PREPAKE SITE:

De-00-72 05-00-13 200:

e I

05-00-73 03-00-75 100%

i PLACE STRUCTURAL CONCRETE:

03-00-77 100%

INSTALL REACTOR PRESSURE VESSEL:

03/00/83

~ 96.8%

INSTALL LARGE 50RE PROCESS PIPE:

07-00-75 l

INSTALL LARGE CORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

07-00-75 05/00/83 17,13 I

INSTAtt Snatt n0RE PIPE:

07-00-75 03/00/83

.' i.. 95.95 I

I 02-00-75 11/00/79 1005 l

INSTAtt cA:LE TRAY:,

1 1

I In4TAlt EXPO 5ED nETAL CONDUIT:

02-00-75 08/00/83 i94.3%

a INSTALL POWER. CONTROL, INSTRUMENTATION AND SECURITY CABLE:

02-00-75 08/00/83

/

93.4%

l I

I In5T Att ELECTRICAL TERnIHAT10h5:

02-00-75 08/00/83

. ~ 35.9%

08/00/82 100:;

c0NDUCT RE AcTCR COLD HTDR0 STATIC TEST:

I I

(cNDUCT HOT rur;C T IDft AL TEST:

N/A

, N/A N/A N/A N/A I

I CONDUCT rREOP AnD ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:

02/20/82 09-00-33 155

.I I

1

~

t-

~

L G

v C0N5TRUCTION 5TATUS REPORT PAGE N3 2-130 WASHINOTON NUCLEAR,3-NUCLEAR POWER P L A'N T 5 STATUS A5 0F:OE6) 1982 w. s.,

PL: ANT C H A R A C'T E R I 5 T I C 5:

KEY P E R 5 0 N N 'E L:'.

~

~

~l ROCKET NO:

05000503 CORPORATE CONTACT:

R. L. FERGU50tt.'MitiAGING DIRECTOR CP~NO. 4 DATE ISSUED:

CPPR-154/ 04-11-73 CP EXPIRATION DATE:

01-01-83 CORPORATE ADDRESS:

P. O. BOX 955 A P P L IC A tif

- WASFf!NGTON PUBLIC PDMER SUPPLY SYSTEf1 RICHLAND, NASHINGTON.'99352 PLANT LOCATION:

'l I E : R EG10ti s

~

25 MI W OF OLYMPIA, WA S'

CORPORATE PHONE NO:

(509) 372-5000

-l AEs

. C0atLUSTION ENGINEERING ESASCO I

H555:

I C3NSTRUCTOR:

EBASCO NRC LPM :

' L. Wi! EEL ER l

REACTOR TYPE:

PWR 1

DER Cr%JE):

1242-IE PROJECT INSPECTOR:

IE RESIDENT INSPECTOR:

W. G. ALBERT l'

i

'I l

D.A T E C M A N_G E 5 IN5PECTION 'S T A T U 5:

F U E L.

L0AD I

i TIME PERIOD A 5. R E P O R T E D B Y-U T-I L'I T Y:

Jan. 1982 - Mar.

1982

~

3 REPORT NEW REA50?I FOR-CHANGE i-REPORT BEG DATE EMD DATE DATF SCHEDULE REPORTED BY UT f t ITY l-

' NtNB ER OF INSP.

OF INSP.

l 05-22-79 05-00-34 SCHEDULE REEVALUATION.

.' )

82-0t 0t-11-82 01-15-52 06-00-30 12-00-35.. REASON FOR 13 MONTH SLIP WAS:

82-02 01-01-82 01-3t 6 MONTHS - CUE TO LATE PIPING START

'l 82-03 02-01-32 02-05-E2, 12 MONTHS - DUE 10 REVISED QU.*.NIITY-

-l 32-04 03-01-32 03-19-E2 AND PRODUCTIVITY ELi! MATES.

I 82-05_

'02-08-32 02-23-32 1

E2-06s 03-0t-82 03-31-82 11-00-8 06/00/86 r0UR MONTHS SC!!EDULE RECOVERY -

l

'82-07 03-23-32

'03-25-22 BASED ON REASSESSMENT OF PP.0 JECT -

I CAPABILITY AfiD CONTPACT INCENTIVE 5'

-l Inspecilon Reports are available at. local PDRs.

FOR PRIME CONTRACTOR 5.

.l I

07/15/82 06/00/86-Reporting based on official fuel load -

l date. The project target fuel load I

date is 12/85.

Present construction

-l-progress, schedule and licensing activitics support 12/85.

1

}

, q s. q'.

.,r

/Y: M' j

r-

.I I

l ILDCA L PUSLIC DDCUMENT R 0 0 M:

l.

s l

M. 11 ABEL MEMORIAL LIBRARY 1

125 MAtti Sil:ELT. SOUTH.

MONTE 5AND, WA5 FLING 10tl 13563

c I.

'S..

g.

'C D N 5 T R U C T I O 5TA T U 5, R E-P,0 R T EIlo:'2-83s]

MA5NINGTON NUCLEAR 3 NUCLEAR P O W E R.

P L A N.T 5 STATUS A5 0F: rlARCH 31;il,

i.

C 0 N 5 T R U C T.I O N 5 T A T'U 5:

l

-l-

~

6/86*

APPLICANTS CONSTRUCTION COMPLET!cM ESTIMATE'AS-I APPLICANT *5 CURRENT ESTIMATED FUEL LDADING DATE:

I APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

ISSU Ai!C E:6 86 DEFINED IN.CP: (EARLIEST) 01-01-83 1/83 (LATEST).

01-01-85 i

APPLICANT'S ESTIMATED-FUEL LOADING DATE AT CP APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:12/86 CURRENT ESTIMATED'PC'RCENT CONSTRUCTION COMPLETE: 72.8%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NOFFICIAL PUBLISHED SCHEDULE IS JUNE 1986.

DEC.

19s5 REPRE5rHTS PROJECT TARGET FUEL t o AD nAIE. ALL ESTIMATED START AND COMPLETION-

-l DATES ARE BASED ON THE Occ.1985 PROJECT T ARGET DATE.

.1 i.l-ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED'l

__jfAPT START COMPLETION

$0-"tETTDN % C05pt [T F l.

MOBILIZE AND PREPAFf SITE:

04-00-77 04-00-77 04-00-15 800

. PLACE STRUCTURAL CONCRETE: '

09-00-78 09-00-78 10/00/84

-92.1%i s

I INSTALL REACTOR PRESSURE VE5SEL:

08-00-ci 08-00-81 08-00-81 100:

1-l i

j INSTALL LARGE ECRE PROCESS PIPE:

03-00-50

'03-00-80 02/00/85

...",91.2%i INSTALL LARGE BORE PIPE NANGERS, RESTRAINT 5'AND SNUBBERS:

03-00-80 00-80 08/00/85

.s. 84.8%

I

!NSTALL SMALL BORE PIPE:

.03-00-81 03-00-81 05/00/85

'59.6%

I 09-00-80 69-00-80

-02/00/84 90.0%I INSTALL CABLE TRAY:

I INSTALL EXPOSED METAL. CONDUIT:

04-00-81; 04-00-8 04/00/85 51'9%I 04/00/85

30.3%l.

INSTALL POWER CONTROL. INSTRUMENTATION AND SECURITY CABLE:

02-00-82 l

INSTAtt ELECTRICAL TERnINATIONS:

03-00-82 03/09/82 08/00/85 9,g t

' CONDUCT REACTOR COLD NYDROSTATIC TEST:

.10/00/84 04/00/85 0:

1 CONDUCT NOT FUNCTIONAL TEST:

11/00/84 06/00/85

,0:

i I

CONDUCT PREOPsA:D ACCEPTANCE TESTS NECESSARY FOR FUCL LDAD:

03/00/83 12/00/85 0:

I I

I l

[

l 1

k 6

F i;.

s

-