SEABROOK STATION e)(-
,q
" J : 'a Omem c
y 1671 Worcesser Reed handnohem. Meseechwens 01701 (4171 - 872 8100 Pub 5c Serv 6ce of New Hornpehire July 29, 1983 SBN-539 T.F. B4.4.2 United States Nuclear Regulatory Commission Washing ton, D. C. 20555 Attention:
Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444
Subject:
Construction Status Report:
Seabrook Station Unit 1 and Unit 2
Dear Sir:
4 We have attached the Ccnstruction Status Report for the period ending June 30,1983.
ry
- yours, i 'cen s Project Manager l
MH0/pf cc: Atomic Safety and Licensing Board Service List 8504150301 840606 PDR FOIA KILLEFE84-367 PDR 1000ElmSt. P.O. Box 330.Monchester,NHO3105 Telephone (603)669-4000. TWX 7102207595
^
~..
l C0N5TQUCT IOH STA TUS REPORT PAGE NO: 2-10t SEADROOK t HUCLEAR P0WER PLAHT$
STATUS AS OF:
06-34 M S]
C0H$TRUCT ION
$TATUSt 20 O! 3*30*IY APPLICANTS CONSTRUCTICH COMPLETI0H ESTIMATE AS APPLTCANT'S CURRENT ESTIMATED FUEL LOADING DATE:
APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
O! ;. ^ ; //=30-93 DEFIHED IN CP (EARLIEST) 02-00-79 1
APPLICANT'S ESTIMATED FUEL iOADING DATE AT CP ISSUANCE:
08-01-81 (LATEST) 06-00-83g j-APPLICANT'S CURRENT ESTIt1ATED COMt1ERCIAL OPERATION DATE: e 'a " /2-SW het Q CURRENT ESTINATED PERCENT CONSTRUCTION COMPLETE:
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
11 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START m gl, gt!PJ gl]Q3 QMPJWQ3 3,,J0MPLETE MOBILIZE AND PREPARE SITE:
07-00-76 aaa?
08-00-77 100x PLACE STRUCTURAL CONCRETE:
09-00-77 08-00-83
.Se%%
INSTALL REACTOR PRESSURE VESSEL:
05-00-88 05-00-81 100%
INSTALL LARGE DORE PROCESS PIPE:
10-0C-79 44-44-44 '/-$Y
.He 70 INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
10-00-79 44 84-44 g.gf 3.24 g INSTALL SMALL BORE PIPE:
09-00-80 N 7-gf 144 6 INSTALL CABLE TRAY:
09-00-79 14-44-82 q. y p%
INST AL L EXPOSED F1ET AL CONDUIT:
04-00-79
&2.=44-e5 7-SY 544r $
INSIALL ? ctJER, CONTROL, INSTRUMENT ATIDH AND SECURITY CABLE:
05-00-81 64-44-65 "?-fV 32*r72 INSTALL ELECTRICAL TERMIlt'ATIONS:
06-00-81 84-44-97 $.$Y 44fN
- . G 4/-g 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
t/-949f-99-95
^7 CONDUCT HOT FUNCTIONAL TEST:
p g an-nn-44 64 44,e3 g.gf 0%
CONOUCT PREOP AND ACCEPT'ANCE TESTS HECESSARY FOR FUEL LOAD:
44-49-t!T 4 40-92 14-09-95g.gaf 0%
w ss suamiyren w Anacaur t.mca. wrn May 26, ag3.
WRC APPeovest PEubiWG.
3
l C0NSTRUCTI0N 5TA TU$
REPORT PACE N08 2-100 SEABR00R t MUCLgAR POWER PL LMTS STATUS AS OFs 06-30 M PLAHT CHARAC1 E R I 5 Y I C St KEY P E R S 0 H H E La 1
DOCKET NO:
05e00443 CORP 0 FATE CONTACT:
W. C. TALLMAN. CHIEF EXEC. OFFICER CP NO. & DATE ISSUED CPPR-135/ 07-07-76 CP EXPIRATION DATE:
06-30-33 CORPORATE' ADDRESS:
1000 ELM STREET APPLICANT PUBLIC SERVICE OF HEW HAMPSHIRE e
MANCHESTER, NEW HAMPSHIRE 03105 PLANT LOCATION:
10 MI $ OF PORTSMOUTH. NH IE REGICH' t
CORPORATE PHONE N08 (603) 661-40C0 AEt.
UNITED Et:0. 8 CONSTRUCTORS HSSSt WESTINCHOUSE F
g.
CONSTRUCTOR UtlITED ENG. 8 CONSTRUCTORS HRC LPM:
L. WHEELER REACTOR TYPE:
DER.tMWE):
119E IE RESIDENT INSPECTOR 8 A.
C. CERNE IN5PECTIOM S T A T U Ss FUEL L0AD DATE CHAHGES TIf1E PERIOD A$ REPORTED EY UTILITY Aor. 19M - Jun. 198/[3 "pq REPORT HEW REASON FOR CHANCE REPORT U BEG DATE-EMD DATE DATE SCHEDULE REPORTED BY UTILITY gj!M M 3 CF. f HSP. '
0F THSP.
art 09-06-77 09-01-82 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 82-0 OS-04 06-18 APPROVAL 0F OHCE THROUGH CIRCULATING 82 5 05-
-82 05-
-82 WATER SYSTEM 4 SUB3EQ. HRC WITHDRAWAL OF
-06 P 82 82 CCHST PE;MIT. 4 TIME REQ TO REM 081LIZE 11-08-78 01-01-83 SCHEDULE REEVALUATION.
04-04-81 11-30-83 SCHEDULE REEVALUATIDH.
Inspection Reports are available at local PDRs.
83-04, e4-il-93 os.u-23 gggg 7 gAf
'j)LANMGb ?sto(7ggSs ME To 23-O?
oG-D3-83 c5-21-93 Abbeb t.A 8og REquieWMTS S3-di os -PV-93 0 7 - o f-S'S MIM AR lLY To MFE7 73-Io og 'o]- $2 06-07-93 EM6f tlEERIMG cHAWdS.
- li i t i.
)
- \\
i'.
I. 0 d 'k)LP'U B'L,I'C D 0 C U M E'M T; R 0 0 M8 L
g i;
. i; il -l EXETERPUB['ICiLIBRARY
- ,.(. '.l.,
i t,; ERO STREET I.4 i
,}
I, '
(q.)),.,,ic t h
..p !
r.
! " M!I '
l a
- +
3 l! ! i'.
i I i I
4 F
^
Q.,,
',,,., p,, ig, J...,;,,,,,,,,, c4,
y,-.
C0NSTRUCTION STATU$
REP 0RT PAGE N04 2-103 ~
SEABROOK 2 NUCLEAR POWER PLANTS STATUS AS OF8 C6-30-g M C0NSTRUCTION STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
40-44 44 i-30* N APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS APPLICANT'S PREWIOUS ESTIMATED FUEL LOADING DATE:
N g.3t-fg DEFINED IN CP (EARLIEST) 01-00-88 APPLICANT'S ESTIMATED FUEL LDADING DATE AT CP ISSUANCE:
10-08-83 (LATEST) 10-00-84 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 44-44-44 7.g-g CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 1&T 7do COMMENTS REG 4RDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START HAE
$_0MPtEiION Smit, RIDE U WPLETE MOBILIZE.AND PREPARE SITE:
07-00-76 03-00-77 100%
PLACE STRUCTURAL CONCRETE:
08-00-81 N S-S(.
54*Sy INSTALL REACTOR PRESSURE VESSEL
- to-23 es-as-es-F4 0%
8 INSTALL LARGE BORE PROCESS PIPET 4+-44-tr3 9-M 43-44-46 /d-S(,
.aata f INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SHUBBERS 4+-ef"Ir3 9 - T.7.
44-44 34 //-Pf
.cJkQ INSTALL SMALL BORE PIPE 7-h N N M-M tv I INSTALL CABLE TRAY:
f-fg94-44-97 84m44=44 /- 96 0%
INSTALL EXPOSED METAL CONDUIT f - g at-nn aq m 9 34
.ag. 6 INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLEy-g64-04-44 4+-44-699-S$
0%
INSTALL ELECTRICAL TERMINATIONS:
/d.$8.4-44-99 44m44=44/O.gf 0%
CONDUCT REACTOR COLD NYDR0 STATIC TEST
//-$ 44-44-49 44-44 es /2.-96 0%
CONDUCT NOT FUNCTIONAL TEST:
./-ga4=&4-66 64-44-ee.7 -97 0%
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD* g 5 ?? **.
43 44 84 //-kf 0%
1
\\
~
C0N5TRUCTION
$T4TUS REPORI-PAGE NO: 2-102' 06-30-p D SEABROOK 2 HUCLEAR P0WER PLAHTS STATUS AS OF
' PLANT CHARACTERISTICSt KEY PERSONNELt DOCKET NO:
05000444 CORPORATE CONTACT W. C. TALLMAN. PRESIDENT CP MO. 8 DATE ISSUED: CPPR-136/ 07-07-76 CP EXPIRATION DATE:
10-31-84 CORPORATE ADDRESS:
1000 ELM STREET APPLICANTS PUBLIC SERVICE OF HEW HAMPSHIRE MANCHESTER. NEW HAMPSHIRE 03105 PLANT LOCATION:
10 MI $ OF PORTSMOUTH. NH IE REGION:
1 CORPORATE PHONE HO (603) 669-4000 AEs UNITED ENG. 8 CONSTRUCTORS NS$$t WESTINGHOUSE 4
CONSTRUCTOR:
UNITED ENG. 8 CONSTRUCTORS HRC LPM:
L. WHEELER I
REACTOR TYPE:
DER (MWE):
1998 IE RESIDENT INSPECTOR:
A. C. CERNE IN$PECTION STATUSt FUEL L0AD DATE CHANGES TIME PERIOD A5 REPORTED BY UTILITY
- Aor. 198F - Jun. 198[
g g
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF TNSP.
OF INSP.
82-tha 05-0 06-1 09-01-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 09-04-77 APPROVAL OF ONCE THROUGl! CIitCUL ATING 8M5 0
-82 6-82 kATER SYSTEM 8 SUBSEO. NRC WITHDRAWAL OF i-CONST PERMIT. 8 T!??E REQ TO REMOBILIZE 11-08-78 11-01-84 SCHEDULE REEVALUATION.
04-04-81 02-28-86 SCHEDULE REEVALUATION.
Inspection Reports are available at Ioeal Pc2s.
" - 3* - 9 2 11-3 -94 by aertscrs suwse. 7349
%3-M 04-ll-93 c ed3-23 h.awueb Pitostess, we r. mb 73-07 o;- o7.g3 oc-o7-93 LAeoA RecutesmeWs ?stiwigajay l
To geg T E9GIQCGiltM6s SS-cir o f-M-93 o7-of -93 CH ANG65 6~%0'93 4-30-97 Sch' tuts (cGvst.uerroH L0 CAL PUBLIC D0CUMEHT R00M EXETER PUBLIC LIBRARY FRONT STREET EXETER. HEW HAMPSHIRE 03883
m_
William S.' Jordan. III, Esquire Ms. Olive L. Tech Harmon & Weiss Designated Representative of 1725 I Street, N.W. Suite 506 the Town of Brentwood Washington, DC 20006 R.F.D. 1, Dalton Road Brentwood, NH 03833 Roy P. Lessy, Jr., Eoquire Office of.the Executive Legal Director Edward F. Meany U.S.~Nuclaur Resclatory Commission Designated Representative of Washington, DC 20555 the Town of Rye 155 Washington Road Robert A. Backus, Esquire Rye, NH 03670 116 Lowell Street P.O. Box 516 Calvin A. Canney
.Mancenster, NH 03105 City Manager City E211 Philip Ahrens, Esquire 126 Daniel Street t
Assistant Attornt+y General Portsmouth, NH 03801 Department of the Attorney General Augusta, HE 04333 Dana Bisbee, Esquire Acsistant Attorney General Mr. John B. Tanzer Office of the Attorney General Designated Representr.tive of 208 State House Annex the Toen of Hampton
. Concord, NH 03842 5 Morningside Drive Hampton, NH 03842 Anne Verge, Chairperson Board of Selectmen.
Roberta C.' Pevear Town Hall-Designated Representative of South Hampton, NH 03842 the Town of Hampton Falls Drinkwater Road Patrick J.-McKeon Hampton Falls,NH 03844 Selectmen's Office i
10 Central Road Mrs. Sandra Gavutis Rye, NH 03870 Designated Representative of the. Town of Kensington David R. Lewis, Esquire RFD 1 Atomic Safety and Licensing Board East Kingston, NH 03827 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Jo Ann Shotwell, Esquire Assistant Attorney General Mr. Angie Machiros Environmental Protection Bureau Chairman of the Board of Selectmen Department of the Attorney General Town of Newbury One Ashburton Place,19th Floor Newbury, MA 01950 Boston, MA 02108 Maynard B. Pearson Senator Gordon J. Humphrey 40 Monroe Street U.S. Senate Amesbury, MA 01913 Washington, DC 20510 1
(Attn: Tom Burack)
Senator Gordon J. Humphrey 1 Pillsbury Street Diana P. Randall Concord, NH 03301 70 Collins Street (Attn: Herb Boynton)
SEabrook, NH 03874 Richard E. Sullivan, Mayor Donald E. Chick City Hall Town Manager =
Newburyport, MA 01950 Town of Exeter 10 Front Street Exeter, NH 03833 y
c -----,.
--e
4
w m A. e v.e
-g
.w w
LONG ISLAND LIGHTING COMPA NY 7
,d%m SHOREHAM NUCLEAR POWER STATION P.O. BOX 618. NORTH COUNTRY ROAD
- WADING RIVER. N.Y.11792 Direct Dial Number
)
August 2,19 83 SNRC-943 Chief, Management Information Branch Office of Management and Program Analyses U.S. Nuclear Regulatory Commission Washington, DC 20555 Construction Status Report, NUREG 0300 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Sir:
In response to your letter, dated October 30, 1981, we submit the attached data for the Construction Status Report, NUREG 0300, for the first quarter, ending June 30, 1983.
Very truly yours,
( i NT'. L. Smith Manager, Spacial Projects VAB/em Attachment cc:
J. Higgins "All Parties Listed on Attachment 1" fM568HH4e4 830802 PDR ADOCK 05000322 R
PDR f52V
,p
,c......,
J ATTACHMENT 1 Lawrence Brenner,.Esq.
Herbert H. Brown, Esq.
Administrative Judge Lawrence Coe Lanpher, Esq.
Atomic Safety and Licensing Karla J. Letsche, Esq.
Board Panel Kirkpatrick, Lockhart, Hill U.S. Nuclear Regulatory Commission Christoper & Phillips Washington, D.C.
20555 8th Floor 1900 M Street, N.W.
Washington, D.C.
20036 Dr. Peter A. Morris Administrative Judge Atomic Safety and Licensing Mr. Marc W. Goldsmith Board Panel Energy Research Group U.S. Nuclear Regulatory Commission 4001 Totten Pond Road Washington, D.C.
20555 Waltham, Massachusetts 02154 Dr. George A. Fergus6n MHB Technical Associates School'of Engineering 1723 Hamilton Avenue Howard University Suite K 2300 Fifth Street San Jose, California 95125 Washington, D. C.
20059 Stephen B.
Latham, Esq.
Twomey, Latham & Shea Daniel F.
Brown, Esq.
33 West Second Street Attorney P.O.
Box 398 Atomic' Safety and Licensing Riverhead, New York 11901 Board Panel U.S.' Nuclear Regulatory Commission Washington, D.C.
20555 Ralph Shapiro, Esq.
Cammer ar.d Shapiro, P.C.
9 East 40th Street Bernard M. Bordenick, Esq.
New York, New York 10016 David A. Repka, Esq.
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Matthew J. Kelly, Esq.
State of New York-Department of Public Service James Dougherty Three Empire State Plaza 3045 Porter Street Albany, New York,12223 Washington, D.C.
20008
_.=
_m
-m y_
C O 14 S T R U C T I O N STATUS REPORT PAGE NO : 2-110 SilOREllAM NUCLEAR POWER PLANTS STATUS AS OF: 6/30/63'
' PLANT C II A R A C T E R I S T I C S:
KEY PERSONNEL DOCKET NO:
05000322 CORPORATE CONTACT:
M. S. - POLLOCK, VICE PRESIDM4T u
CP HO. & DATE ISSUED:
CPR-95 / 04-14-73 CP. EXPIRATION DATE:
03-31-83 CORPORATE ADDRESS:
175 EAST OLD COUNTRY, ROAD. _
APPLICANT:
IDNG ISIAND LIGIITING COMPANY
.IIICKSVILLE, NEW YORK 11801 PLANT LOCATION:
BROOKHAVEN,'NY (LI)
IE REGION:
I CORPORATE PilONE NO:
(516) 733-4013 AE -
STONE & WEBSTER NSSS:
GENERAL ELECTRIC CONSTRUCTOR:
STONE & WEBSTER NRC LPM:
R. CARUSO REACTOR TYPE:
DER (MWE) 849 IE RESIDENT INSPECTOR:
J. C. HIGGINS I'N S P E C T I O N
.S T A T U St FUEL LOAD DATE CHANGES AS REPORTED B Y.
' U T I L I T Y:
TIME PERIOD REPORT NEW REASON FOR CHANGE.
REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY
-NUMBER OF INSP.
OF INSP.
02-20-74.12-00-77
- 1. CHANGE IN AEC SEISMIC & PIPE BREAK 83-05 2/1/83 2/28/83 CPITERIA RESULTFD IN 2 MONTHS ADD-
'83-08
.3/1/83 3/31/83 ITIONAL EFFORT IN Tile INSTALLATION -
'83-09 4/12/83 4/15/83 OF PRIMARY CONTNMT & PRV PEDESTAL.
83-10 4/1/83 5/1/83
- 2. DIFFICULTIES ENCOUNTERED DURING
]
83-11' 4/5/83 4/16/83, CONSTRUCTION OF PRIMARY CONTNMT.
83-12 4/25/83 4/29/83 WALL & RPV PEDESTAL AND IMBEDME*3T.
FOR PIPE BREAK INSIDE CONTNMT.
,83-13 4/26/83 4/28/83 LABOR STRIKES, UNAVAILABILITY OF MA-83-14 4/27/83 4/29/83 11/10/75 12-00-78 83-15 5/16/83 5/19/83 TERIAL, WEATHER & CONSTR. DIFFICULTIES
.83-16 5/10/83
'5/12/83 IIAVE RESULTED IN A 12 MONTil DEIAY...
83-19 5/31/83
.6/3/83 09-21-77 03-00-80
- 1. LATE DELIVERY OF PURC11ASED MATERI.
AL (PIPING & VALVES).
' 2.10WER TilAN EXPECTED LABOP PRODCVTY.
- 3. DESIGN CHANGES DUE.TO REG. REQMTS.
01-10-79 06-00-80 MANPOWER CONSTRAINTS & DESIGN PROCURE-MENT PROBLEMS.
L O C A'L P U B L I C D0CUMENT R O O H:
02-00-80 11-00-80 NO REASON PROVIDED.
06-19-80 05-00-82 DEIAY DUE TO COMPLETION OF SYSTEMS.
06-09-81 09-00-82 DEIAY DCE TO COMPLETION, OF SYSTEMS.
SilOREHAM-WADING RIVER PUBLIC LIBRARY '
09-30-82 02-00-83 DEIAY IN SYSTEM COMPLETION DUE TO LATE MATERIAL DELIVERIES & FINAL PIPE STRS.
ROUTE.25A-SilOREHAM,'NEW YORK 11786 RECONCILIATION REVIEW.
12-31-82 05-00-83 DEIAY IN SYSTEM COMPLETION.
3-31-83 08-00-83 DELAY IN SYSTEM COMPLETION
.s CONSTRU'CTION STATUS. REPORT PAGE NO:'2-111-18 U C L E A R POWER PLANTS STATUS AS OF: 6/30/83 SilOREllAM C O N S T R U.C T I O N' STATUSt
~
APPLICANT'S' CURRENT ESTIMATED FUEL LOADING DATE:
08-00-83 APPLICANT'S CONSTRUCTION COMPLETION ESTI-
' APPLICAttr'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-83 MATE DEFINED IN CP: EARLIEST -
APPLICANT'S ESTIMATED FUEL IAADING DATE AT CP ISSUANCE:
03-31-77 LATEST 00-83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:
02-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 98.2%
. COMMENTS REGARDING CURREfff CONSTRUCTION STATUS:
ESTIMATED. ACTUAL ESTIMATED ACTUAL ESTIMATE START START COMPLETION COMPLETION % COMPLETE 11-00-72 03-00-73 100. %
MOBILIZE AND PREPARE SITE:
03-00-73 12-00-77 100 %
PLACE STRUCTURAL CONCRETE:
03-00-75 12-00-75 100. s INSTALL REACTOR PRESSURE VESSEL:
INSTALL LA14GE BORE PROCESS PIPE:
05-00-75 10-00-79 100 %
INSTALL LARGE BORE PIPE HANGERS, RESTRAlllTS & SNUBBERS 07-00-75 08-31-83 99 s
' INSTALL SMALL BORE PIPE:
05-00-75 09-00-82 100 %
INSTALL' CABLE TRAY:
02-00-76 08-00-82 100 %
IllSTALL EXPOSED METAL CONDUIT:
02-00-76 08-31-83 99.9%
IllSTALL POWER, CONTROL, INSTRUMENTATION & SECURITY CABLE:
06-00-76 0,o-31-83 99.9%
INSTALL ELECTRICAL TERMINATIONS:
06-00-76 08-31-83 99.9s
. CONDUCT REACTOR COLD HYDROSTATIC TEST:
10-00-79 10-00-79 10-00-79 100 CONDUCT llOT FUNCTIONAL TEST:
N/A N/A N/A N/A N/A
+
CONDUCT PREOP ACCEPTANCE TESTS NECESSARY FOR FUEL IDAD:
01-00-80 08-00-83 95 s