Forwards Updated Const Status Rept as of 821228.Unit 1 Const Approx 86% Complete
ML20127D452
Person / Time
Site: 05000000, Callaway
Issue date: 01/20/1983
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 ULNRC-602, NUDOCS 8504150291
Download: ML20127D452 (3)


Text

p.

l UNION ELECTRIC COMPANY 1901 GRATIOT STREET ST. Louis, Missoups maeuwe aoommes.

    • ya ; *l"l'"

January 20, 1983

,,, mO *,,*;;o'ff,,,,,,

l ULNRC-602

\\-

r chief, Management Information Branch Office of Management and Program Analysis l

U.S. Nuclear Regulatory Commission l

Washington, DC 20555 i

i Dear Sir CONSTRUCTION STATUS REPORT CALLAWAY' UNIT 1 i

Enclosed is the Construction Status Report revised j

for a status date of December 28, 1982.

Construction of j

Unit 1 is approximately 86 percent complete.

1 This letter constitutes our report to be filed by January 28, 1983.

Very truly yours,

d l

Donald F.

Schnell FLK/1kr

)

l l

Enclosure i

cc:

Messrs. H. M. Wescott E. K. Dille i

J. Noisler i

i 05041M291 840606

'~

PDR FOIA l

KILLEFEB4-367 PDR l

I k

~

CONSTRUCTION STATUS REPORT Pagi No. 2-018L CALLAMAY 1 NUCLEAR POWER PLANTS Statu2 As cf:

12-28-82 CONSTRUCTION STATUS:

Applicant's Current Estimated Fuel Applicants Construction Comple cion Estimate Loading Date:.

04-02-84

.As Defined in CP:

(Earliest; 06-30-81 Applicant's Previous Estimated Fuel (Latest)

'12-31-83 Loading'Date-06-01-83 Applicant's Estimated Fuel Loading Date At CP-Issuance:

06-01-81 Applicant's Current Estimated Commercial Operation.Date:-

.. Late 1984/Early 1985 Current Estimated Percent Construction Complete: ' 864 Comments Regarding Current _ Construction. Status:

Estimated Actual Estimated Actual

-Estimated Start Start Completion-Completion 4 Complete Mobilize and Prepare Site:

09-03-75 05-01-76 1004 Place ~ Structural Concrete:

04-01-76 10-11-82 1004 Install Reactor Pressure Vessel:

03-15-79 04-01-83 944 Install Large Bore Process. Pipe:

01-12-78 09-01-83 994 Install.Large: Bore Pipe Hangers, Restraints and Snubbers:

01-10-78 11-30-83 88%

Install;Small Bore-Pipe:

01-19-78 08-01-83 98%

. Install Cable Tray:

07-09-78 10-01-83 994 Install. Exposed Metal Conduit:

07-01-78 11-01-83 91%.

Install Power, Control, Instrumentation and Security Cable:

08-08-79 12-01-83 87%

N

_____._.__.__m__..

Estimated Actual Estimated

' Actual-Estimated' Start Start Completion Completion-4 Complete Install Electrical Terminations:

04-04-80 01-01-84 694-Conduct" Reactor Cold Hydrostatic Test:

04-29-83 05-02-83 04-Conduct Hot Functional Test:

09-12-83

. 10-25-83

.04 Conduct Preop.and Acceptance Tests Necessary For Fuel Load:

10-30-81

'02-02-84 284 T