Text

.'

i*

UNION ELECTRIC COM PANY 1901 GRATioT STREET sr. Louis, Missouni January 20, 1984

. c...o o....,

DON ALD F..CHNELL P. O..OX 149

.r. Loui..

...ou......

ULNRC-726 Chief, Management' Information Branch Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

CONSTRUCTION STATUS REPORT CALLAWAY UNIT 1 Enclosed is the Construction Status Report revised for a status date of December 31, 1983.

Construction of Unit 1 is approximately 95 percent complete.

This letter constitutes our report to be filed by January 31, 1984.

Very truly yours, Donald F. Schnell FLK/efh Enclosure cc:

Messrs.

H. M. Wescott E. K. Dille J. Neisler 8504150250 840606 FOIA PDR KILLEFE84-367 PDR

CONSTRUCTION STATUS REPORT Prga No. 2-018

-CALLAWAY l NUCLEAR POWER PLANTS Status As of:

12-31-83 CONSTRUCTION STATUS:

Applicant's Current Estimated Fuel Applicants Construction Completion Estimate Leading Date:

04-02-84 As Defined in CP:

(Earliest) 06-30-81.

Applicant's' Previous Estimated Fuel' (Latest) 03-30-84 Lcading Date:

06-01-83 Applicant's Estimated Fuel Loading Dcte At CP Issuance:

06-01-81 Applicant's Current Estimated Commercial Operation Date:

Late 1984/Early 1985 Current Estimated Percent Construction Complete:

95%

Comments Regarding Current Construction Status:

listimated Actual Estimated Actual Estimated Start Start Completion Completion

% Complete Mobilize and Prepare Site:

09-03-75 05-01-76 100%

Place Structural Concrete:

04-01-76 10-11-82 100%

Install Reactor Pressure Vessel:

03-15-79 05-02-83 100%

Install Large Bore Process Pipe:

01-12-78 05-16-83 100%

Install Large Bore Pipe Hangers,-Restraints and Snubbers:

01-10-78 11-15-83 100%

Install Small Bore Pipe:

01-19-78 09-01-83 100%

Install Cable Tray:

07-09-78 05-09-83 100%

Install Exposed Metal Conduit:

07-01-78 01-16-84 100%

Install Power, Control, Instrumentation and Security Cable:

08-08-79 03-15-84 99%

' Estimated Actual Estimated Actual Estimated Start Start Completion Completion t Complete Install Electrical Terminations:'

04-04-80 03-30-84 944 Conduct Reactor Cold Hydrostatic Test:

06-02-83 06-02-83 1004 Conduct Hot Functional Test:

11-15-83 12-30-83 1004 Conduct Preop and Acceptance Tests Necessary For Fuel Load:

10-30-81 03-30-84 75%

4 a

9 5

4 C0N5TRUCTION 5TATU5 REP 0RT PAGE N04 2-012'-

- BYRON I NUCLEAR P0WER PLANT 5 ST ATUS A5 0F* 12-31-83 FLANT _ C H A R A C T E R I 5 T I C $8 KEY PERS0NNEL8 DOCKET NO:

05000454 CORPORATE CONTACT 3 C. Reed,LVice President CP NO. 4 DATE 155UE0 CPR-130 / 12-31-75 CP EXPIRATION DATE:

CORPORATE ADDRE558 P. D.

BOX 767

~

APPLICANT:

COMMONWEALTH EDISON CHICAGO. ILLINOIS 68690 PLANT LOCATION:

17 MI SW OF ROCKFORD. ILL IE REGIONS 3-CORPORATE PHONE N08 (312) 294-3121 AEs

.SARGENT & LUNDY N555:

WESTINGNOUSE CONSTRUCTOR:

. cot.NONWEALTil EDISON NRC LPM 8 5 CNESTNUT REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

R. Lerch DER (MWE):

1820 IE RESIDENT INSPECTOR 8 J. Ninds '

IN5PECTION 5.T A T U 5:

PUEL L0AD DATE CHANGE 5 TIME PERIOD.

A5 R-E P 0 R T E D B Y UTILITYs GCT., 1983 - DEC., 1983 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUM8fR OF INSP.

OF INSP.

Not Available MODIFICATIONS, AND REDUCET) IDAD ESTIMATES Inspection' Reports are available at local PDRs.

01/8/80 h/82 POST TMI NRC LICENSING SLOWDOWN 09/15/80 h/83 REALIDCATION OF ENGINEERING RESOURCES TO OPERATING PLANT TMI RELATED ITB!S.

09/30/82 8/83 ADDITIONAL TIME REQUIRED FOR RECON-CILIATION ANALYSIS, SYSTEM TURNOVERS AND PREOP SCHEDULE 07/26/83 12/83 REASSESSMENT OF HEIAINIllG WORK AND TESTING PROGRESS 10/27/83 2/84.SAME AS LAST TIME 01/30/84 8/84 LICENSE DEd1AL BY ASLu.

I L0 CAL PUBL IC D 0 C U M E N T-R 0 0 M:

BYRON PUBLIC LIBRARY TNIP.D AND W45NIliGION STREET STRON, ILLIts0!$ 68010 i

e

.,) Us a

~

.C 0 N 5 T R U C T I.0 N 5TATUS REPORT PAGE NO: 2-013 ST ATUS. A5 0' * '12-31-83 s BYROM I NUCLEAR POWER P_LANT5 L

r C0N5TRUCTION 5TATU5:

g APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5

~

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

02-15-84 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

DEFINED IN CP (EARLIEST) 05-08-80 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-80 (LATEST) 10-1-84' i

APPLICANT'S CURRENT ESTIMATED C0t1MERCIAL DPERATION DATE' 11-30-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 93%

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:

Applicant anticipates to be ready for fuel loadin$ prior to above estimated date.

ESTIMATED ACTUAL ESTIMATED ACTUAL' SSTIMATED START START COMPtETION

{1Mfj [1]Og % COMPLETE r.0BILIZE AND PREPARE SITE:

04-00-75 12-00-75 1004 7-82 100%

PLACE STRUCTURAL CONCRETE:

12-00-75' l'

INSTALL REACTOR PRES 5URE VESSEL:

09-00-78 11-00-78 100%

INSTALL.LARGE BORE PROCESS PIPE:

01-00-76 7-82 100%

. INSTALL LARGE BDRE PIPE NANGERS.. RESTRAINTS AND SHUBBERS:

05-00-77 2-84 96%

INSTALL SMALL BORE PIPE:

08-00-76 4-83 100%

12-82 100 IN'51ALL CABLE TRAY:

12-00-76 INSTALL EXPOSED METAL CONDUIT 02-00-78 k-84 8'(%

k 84 92%

INSTALL' POWER, CONTROL, INSTRUMENTATION A'HD AECURITY CAOLE:

08-00-78 INSTALL ELECTRICAL TERMINATIONS:

08-00-78 4-84 83%

^ CONDUCT REACTOR COLD HYDROSTATIC TELI:

07-08-81 07-00-81 100%

h-83 7-83 100%

i' CONDUCT NOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS HECE55ARY FOR FUSL LOAD:

06-00-80 3-84 88%

t w as i

?

O

C0N5TRUCTION 5TATUS REPQRT PAGE NO: 2-014-N U C L *. A R P O 14 E R P L'A N T 5 STATUS A5 0F8 12-31 83 SYRON 2

+

KEY P E R S 0 N N E L:

PLANT

'C H A R A C T E R I 5 T I C Sa CORPORATE CONTACT

  • C. REED, VICE PRESIDENT DOCKET N08 85080455 CP NO. 8 DATE ISSUED

.CPR-138 / 12-31-75 CORPORATE ADDRESS P. O. BOX 767 CHICAGO. ILLINOIS 60698 CP EXPIRATION DATES APPLICANT:

COMMONWEALTH EDISCH.

PLANT LOCATION:'

17 MI SW OF ROCKFORD, ILL CORPORATE PHONE N0s (312) 294-3121 IE REGION:

3 SARGENT 8 LUNDY

-AEr.

WESTINGHOUSE NRC LPMs

5. CNESTMUT N555s CONSTRUCTOR:

COHB 10NWEALTl! EDISON

'IE PROJECT INSPECTOR:

R. Legch REACTOR TYPE PWR IE RESIDENT IN5PECT0tt yg DER (MWE):

1820 FUEL L0AD DATE CNANGE5 IN5PEC. TION 5 T A T U 58 A5 R E_P 0 R T E D BY UTILITYs TIME PERIOD OCT, 1983 - DEC, 1983~

REPORT

. SCHEDULE REPORTED BY UTitfTY NEW REASON FOR CHANGE REPORT

-BEG DATE END DATE DATE puMBER OF INSP.

OF INSP.

01/14/76 5/82' REDUCED LOAD EST1 MATES.

NOT AVAILABLE 01/08/80-3/83 POST Till NRC LICENSING SIDWDOWN.

09/15/80 h/84 ~ RBALIDCATION OF ENGINEERING RESOURCES TO OPERATING PLANT TMI RELATED ITEMS.

Inspection Reports are available at local PDRs.

04/27/83 2/85 REASSESSMENT OF RDIAINING WORK.

07/26/83 5/85 REASSESSMENT OF REMAINING WORK AND EMPRASIS ON UNIT 1.

01/30/84 10/85 FOCUS ON UHlT 1 C0!HD?f10N.

I I

L0 CAL PUBLIC D0CUMENT R 0 0 M8

+

BYROM PUBLIC LIBRARY THIRD AND WASHINGTON STREET SYRUN. ILLINDIS 61010 i

p

.c# % *+W 4' j

e.,s.

,__m,

^

C 0 N.5 T R U C T I O N

'S T A T U S.

R E P,0 R T PAGE N0* 2-015 BYRON 2 '

NUCLEAR

'P0WER PLANT 5 STATUS A5 0Ft 12-31-83~

C0N5TRUCTION 5TATU5 10-31-85 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATES-05-31-85 DEFINED IN Cr (EARLIEST) 11-01 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-88 (LATEST) 04-01-86 APPLICANT'S CURRENT. ESTIMATED COMMERCIAL OPERATION DATE: 04-30-86

~

CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE 67%

COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATLD START

- iLAR Cor1Pt fli.Q.!i

[00.!) fila!! - 3._COMPI E T E MOBILIZE AND PREPARg.* it 04-00-75 02-00-76 100%

PLACE STRUCTURAL CONCF'..

02-00-76 7-82 100%

INSTALL REACTOR PRE 5!*.

V r5':t ' t '

07-00-79 10-00-79 100%

INSTALL'LARGE BORE Pn0CE55 PIrcs 05-00-76 06-84 78%

INSTALL L ARGE BORE PIPE NAMGEn RESTRAINTS AND SHUBBERS 05-00-77 12-84 h2%

INSTALL SMALL BORE PIPE:

08-00-76 08-84 375

- INSTALL CABLE TRAYS 12-30-76 01-84 99%

INSTALL EXPOSED METAL CONDUIT:

02-00-78 01-85 48%

INSTALL POWER. CONTROL. INSTRUMENTATIDH AND SECURITY-CABLE:

11-00-78 02-85 43%

INSTALL ELECTRICAL TERMINATI0H5:

Il-00-78 03-85 40%

CONDt",T REACTOR COLD NYDROSTATIC TEST:

06-84 06-84 ex 02-85 02-85 04 CONDUCT NOT' FUNCTIONAL-TESTS CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

01-84 10-85 0%

F

!