CD&L Carolina Power & Light Company SERIAL: NLS-84-026 B 31984 s
Mr. R._A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis United States Nuclear Regulatory Commission Washington, DC 50555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO. 50-400 CONSTRUCTION STATUS REPORT
Dear Mr. Hartfield:
Carolina Power & Light Company hereby submits the updated Shearon Harris Nuclear Power Plant construction information for the forth quarter of 1983 to reflect the construction status data as of December 31, 1983. This report reflects CP&L's December 21, 1983 decision to cancel Unit 2.
Yours very truly, S. R. Zimmerm Manager Nuclear Licensing Section PSA/ lev (9331PSA)
\\
Attachment cc:
Mr. B. C. Buckley (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J. P. O'Reilly (NRC-RII)
~
8504150247 840606 PDR FOIA KILLEFE84-367 PDR 411 Fayetteville Street
- P. O. Box 1551
- Raleign, N. C. 27602
~. - -
CONSTRUCTION STATUS REPORT-PAGE NO.: 1 H ARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF: 12/3 t A3 PLANT CHARACTERISTICS:
KEY PERSONNEL:
DOCKET NO:
05000400 CORPORATE CONTACT:
M. A. MCDUFFIE, SEN. V. PRESIDENT.
CP NO. & DATE ISSUED:
CPR-158 / 01-27-78 CORPORATE M) DRESS:
NUCLEAR GENERATION.
CP EXPIRATION DATE:
06-01-84 411 FAYETTEVILLE STREET APPLICANT:
CAROLINA POWER & LIGtT RALEIG4, NORTH CAROLINA 27602
~ PLANT LOCATION:
NEW H ILL, NC IE REGION:
11 CORPORATE RIONE NO:
(919) 836-6663 AE:
EBASCO NRC LPM:
B. C. BUCKLEY NSSS:
WESTINGt0USE lE PRINCIPAL INSPECTOR:
CONSTRUCTOR:
DANIEL INTERNATIONAL
-CONSTRUCTION :
REACTOR TYPE PWR
-TEST AND STARTUP:
DER (MWE):
900 IE RESIDENT INSPECTOR :
G. F. MAXWELL INSPECT l0N S T A T U S:
FUEL LOAD DATE CHANGES AS REPORTED BY U T I L 1.T Y :
TIME PERIOD REPORT NEW REASON FOR Of ANGE REPORT BEG DATE END DATE DATE SOiEDULE REPORTED BY UTILITY NtMBER OF INSP.
OF INSP.
05-07-75 06-01-83 REVISED CURRENT ENERGY AND LOAD FORECAST.
09-08-80 06-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND TH AN PROJECTED.
12-16-81 12-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND TH AN PROJECTED.
09-30-82 05-00-85 12-31-82 06-00-85 LOCAL PUBL1C DOCUMENT ROOM:
CAKE COUNTY PUBLIC Li!RARY 104 FAYETTEVILLE STREET RALEIGI, NOR1H CAROLINA 27601 (6776 PUB)
CONSTRUCTION STATUS REPORT PAGE NO.: 2 H ARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF: 12/31/83-CONSTRUCTION STATUS:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-00-85 APPLICANT'S CONSTRUCTION COWLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-00 DEFINED IN CP: (EARLIEST) 06/01/83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
'09-00-80 (LATEST) 06/01/84 APPLICANT'S CURRENT ESTIMATED COMMERCI AL OPERATION DATE: 03-01-86 CURRENT ESTIMATED PERCENT CONSTRUCTION CO W LETE: 837 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
f EST IMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START CO WLET10N COWLETION 5 COWLETE MOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28 01-28-78 1005 PLACE STRUCTURAL CONCRETE:
01-28-78 01-28-78 02-01-84 985
- INSTALL REACTOR PRESSURE VESSEL:
12-01-79 04-15-80~
04-01-80 08-29-80 1005 INSTALL LARGE BORE PROCESS PIPE:
04-01-79 04-01-79 08-01-84 90%
INSTALL LARGE BORE PIPE H ANGERS, RESTRAINTS AND SNUBBERS:
04-01-79 04-01-79' 01-01-85 665 lNSTALL SMALL BORE PIPE:
04-01-79 04-01-79 08-01-84 885 lNSTALL CABLE TRAY 04-01-79 04-01-79 04-01-84 985' lNSTALL EXPOSED METAL CO@UIT:
04-01-79 04-01-79 01-01-85 865 lNSTALL POWER, CONTROL, INSTRtMENTATION AND SECURITY CABLE:
03-01-81 02-26-81 01-01-85 58%
' INSTALL ELECTRICAL TERMINATIONS: (POWER AND CONTROL ONLY) 01-01-82 06-15-81 01-01-85 25%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
09-04-84 09-25-84 05 CO@UCT HOT FUNCTIONAL TEST:
01-02-85 01-11-85 05 CONDUCT PREOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:
06-01-83 03-24-83 06-01-85 05
(6776 PUB)
CONSTRUCTION STATUS REPORT PAGE NO.: 3 H ARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF: 12/31/83 P'L A N T CHARACTERISTICS:
KEY PERSONNEL:
DOCKET NO:
05000401 CORPORATE CONTACT:
M. A. MCDUFFIE, SEN. V. PRESIDENT CP NO. & DATE ISSUED:
CPR-159 / 01-27-78 CORPORATE M) DRESS:
NUCLEAR GENERATION CP EXPlRATION DATE:
06-01-86 All FAYETTEVILLE STREET APPLICANT :
CAROLINA POWER & LIG4T RALEIGi, NORTH CAROLINA 27602 PLANT LOCATION:
NEW H ILL, NC IE REGION:
.ll CORPORATE IHONE NO:
(919) 836-6663 AE:
EBASCO NRC LPM:
B. C. BUCKLEY NSSS:
WESTING 400SE IE PRINCIPAL INSPECTOR:
CONSTRUCTOR :
DANIEL INTERNATIONAL
-CONSTRUCTION:
REACTOR TYPE-PWR
-TEST AND STARTUP:
DER (MWE):
900 IE RESIDENT INSPECTOR :
G. F. MAXWELL 1NSPECTlON S T A T U S:
FUEL LOAD DATE CHANGES AS REPORTED BY UTILITY:
TIME PERIOD REPORT NEW REASON FOR 04ANGE REPORT BEG DATE END DATE DATE S01EDULE REPORTED BY UTILITY NtMBER OF INSP.
OF INSP.
05-07-75 06-01-85 REVISED CURRENT ENERGY AND LOAD FORECAST.
01-00-80 06-01-86 REVISED CURRENT ENERGY AND LOAD FORECAST.
09-08-80 06-01-87 SLOWER RATE GROWTH IN CUSTOMER DEMAND TH AN PROJECTED.
12-16-81 06-01-88 EXPAtOED CONSERVATION AM) LOAD MANAGEMENT PROGRAM.
09-30-82 UM)ER REVIEW 12-31-82 06-00-89 12-21-83 CANCELLED LOCAL PUBLiC DOCUMENT ROOM:
t'AKE COUNTY PUBLIC LIERARY 104 FAYETTEVILLE STREET RALEIG4, NOR1H CAROLINA 27601 (6776 PUB)
s CONSTRUCTION STATUS REPGRT PAGE NO.: 4 H ARRIS 2 NUCLEAR P O c E'R PLANTS STATUS AS OF: 12/31/83 CONSTRUCT l0N STATUS:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
CANCELLED APPLICANT'S CONSTRUCTION COW LETION ESTIMATE AS
. APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-01-88 DEFINED IN CP: (EARLIEST) 06/01/85-APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
06-01-85 (LATEST) 06/01/86 APPLICANT'S CURRENT ESTIMATED C0weERCI AL' OPERATION DATE: CANCELLED CURRENT ESTIMATED PERCENT CONSTRUCTION COWLETE: 45 COW 4ENTS REGARDING CURRENT CONSTRUCTION STATUS: CANCELLED ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COWLETION CO WLETl0N
$ COWLETE MOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STRUCTURAL (X)NCRETE:
02-01-79 02-01-79 31%
INSTALL REACTOR PRESSURE VESSEL:
05 INSTALL LARGE BDRE PROCESS PIPE:
06-01-79 06-01-79 13%
INSTALL LARGE BDRE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
07-01-82 07-01-82 05 lNSTALL SMALL BDRE PIPE:
06-01-79 06-01-79 4%
INSTALL CABLE TRAY 04-01-85 Of INSTALL EXPOSED METAL C000U17:
35 INSTALL POWER, CONTROL, INSTRlMENTATION AND SECURITY CABLE:
05 INSTALL ELECTRICAL TERMINATIONS:
Of CONDUCT REACTOR COLD HYDROSTATIC TEST:
05 COM)UCT HOT FUNCTIONAL TEST:
Of CONDUCT PREOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:
Of (6776 PUB)