Text
..
t E
q VIHOINI A ELncTHIc AND POWER COh!PANY HICilblOND, VIRGINIA 23261 October 13, 1992-l-
U.' S. Nuclear Regulatory Commission Serial No.92-669 Attention: Docurnent Control Desk NL&P/JMJ:Jmj L
-Washington, D.C. 20555 Docket Nos.
50-338-50-339 License Nos. NPF-4)
NPF,
L L
[
Gentlemen:
-VIRGINIA ELECTRIC AND POWER-COMPANY.
L HQRTH ANNA POWER STATION UNITS 1.AND 2 l'
MONTHLY OPERATING REPORT
~ Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 D
for the month of September 1992.
p Very truly yours, q
/k j.
l M. L. Bowling, Manager l
Nuclear Licensing and Programs Enclosure cc.
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW i
Suite 2000 :
Atlanta, GA 30323
- Mr. M. S. Lesser;
-NRC Senior Recident inspector
. North Anna Power-Station.
[L
~j I
l i-9210150252 92L#30
' g ' ;-
ap PDR ;ADOCK 03000338
. _R.
[
j' y(,
y b
a
. - S P
VIRGIN 1A POWER COMPANY NORTil ANNA POWER STATION MONTIILY OPERATING REPORT MO;rril:
Sostegber YEAR:'_1992 Approved:
9 tat 10n Manager
j l
OPERATikG DATA REPORT l
DOCKET ho.,
50-338 DATE: 0:tober 2, 192 CONTACT: G. E. Kane PHONE: (703) 894 2101 OPERATING STATUS
- 1.. Uni t Name :............................... N or t h Anna 1 2.
Reporting Periodi.........................$EPTEMdER 1992 3.
Licensed Thermal Power (MWt):.............
2,748
.,, Nameplate Rating (Grow,.(" t):...........
947 5.
Design Electrical Rating (Net MWe):.......
907 6.
Maximin Deperdable Capacity (Gross MWe):..
f)94
- 7. ' Maxiam Dependable capacity (het MVe)....
348 8.
If chhnges occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasorts:_,N/A _
9.
Power level to which restricted. If any (Net MWe): _ N/A
- 10. Reasons for restrictions, if any N/A This Month Y-t 0 Cunulative
- 11. Hours in Reporting Period............................
720.0 6,575.0 125,147.0
- 12. Nunter of Hours R eac t or was Cr i t i cal.....................
720.0 5,03L 3 91,721.8 l
- 13. Reac tor R earve Shutdown Hours...........................
0.0 36.3
,5,758.0 t
- 14. Hours Generstor 0n-Line..................................
720.0 5,016.2 88,787.7 15, ' Un i t R ese rve Shut down H our s............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH).................
1,860,476.8 13,465,346.C 236,418.118.4 17 Gross E l ectr ical Energy Generat ed (MWW)..................
611,340.0 4,437,910.0 77,695,757.0
- 18. Met Electrical Energy Generated (MWM)....................
580,035.0 4,216,356.0 73,570,973.0
- 19. Uni ? Serv i c e F ac t e r....................................
100.0%
76.3%
70.9%
l
- 20. Unit Availability Factor.................
100.0%
76.3%
70.9%
- 21. Unit Capacity Factor (using MOC Net).....
95.0%
73.8%
65.7%
(
- 22. Unit Capacity Factor (using DER Net)......
88.)%
70.7%
6/.8%
~
l
- 21. Forced Out e ge R at e........................
v.0%
0.0%
11.7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_ Steam Generator Replacement and Refueling Outage, January 1993, approximately 120 days.
l I
l
- 5. If Shutdown at er:d of Report Ptriod, estimated time of Star *up:
N/A
- 26. Wts in Test Status (Prior to Corrinercial Operation):
j j
Forecast Achieved
~j
(-
INITIAL CRITICALITY l
i INITIAL ELECTRICITY
.l I
COMMERCIAL' OPERATION
_]
i I
,a.
4 AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unit:
NA-1 Dates Oct.
2.
1992
Contact:
G.
E.
Kane Phone:
1703) 894-2101 MONTil:
September 1992 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 856-17 798 2
856 18 795 3
855 19 793 4
855 20 783 5
856 21 781 6
856 22 779 7
857 23 764 8
047 24 764 9
839 25 761 10 837 26 754 11 817 27 751 12 829 28 749 13 818 29 741 14 816 30 736 15 814 16 809 l
l l'
l-l:
Instructions:
On this fornat, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest l
whole raegawatt.
L
.e UNIT SHUTDOWNS AND POWER REDUCTIONS
^
DOCKET NO.:
50-338 UNIT NAME:-
NA-1 DATE: Oct.
2, 1992 REPORT MONTH: Sep. 1992 CONTACT:
G.
E. Kane-PHONE: (703) 894-2101 1
2 3
4 5
No.
Date
. Type Duration Reason
' Method of Licensee System componsot cause & Corrective (hrs).
Shutting Event Code Code Ace' on to Down' Reactor Report /
Prevent' Recurrence
No entry this month.
~
._: Type 2: Reason 3: Method 4:
F= Forced.
A= Equipment'Failuce (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4=Continuat. ions Event Report (LER) File-E= Operator' Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other-(explain)
Exhibit H - Same Source i
4 5
e-
~
-__.L_._--.---_.a=,_
.E. -...
Page, 1 o f __1 UNIT SIIUTDOWN AND POWER REQUCTIONS 3
Explanation Shoct Docket No.:
50-338 Report Month Sentember Unit Name:
,IA-1 Year:
1992 Date: Oct.
2, 1992
Contact:
G.
E.
Kano
- No entry this month.
I
riORTH ANNA POWER STATION
~
UNIT NO.: J __
MONTH:
September
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data September 01, 1992 0000 Began mor.th with unit at 95% power, 903 MWe.
07, 1992 1351 Reactor Coolant boron concentration is n ppm, commenced Unit Coastdown IAW 1-OP-2.2.
08, 1992 1014 Ramped turbine down to reduce Tave 1 F less than Tref IAW 1-OP-2.2, Unit stable 93%, 887 MWe.
11, 1992 0817 Commenced unit ramp-down to 90% power for TVFT-and repairs on Circulating Water Inlet valve to "C" main condenser (1-CW-MOV-101C).
0838 Unit stable at 90% power, 852 MWe.
0935 TVFT completed satisfactorily.
1818 Repairs complete on 1-CW-MOV-101C, commenced unit ramp-up.
1824 Unit stable at 91% power, 876 MWe, 12, 1992 1014 Ramped turbine down IAW 1-OP-2.'i.
Unit stable 90% power, 364 MWe.
16, 1992 1014 Ramped turbine down IAW 1-OP-2.2, Unit stable 89% power, 8 5 MWe.
20, 1992 1014 Ramped turbine down TAW 1-OP-2.2, Unit stable 87% powcr, 830 MWe.
22, 1992 2334 Ramped turbine down.IAW 1-OP-2.2, Unit stable-85% 812 MUs, 23, 1992 2034
- 1 Throttle valve went shut due to mechanical failure, actuator stem separated from linkage, lost approx. 20 MWe.
i' 25, 1992 0500 Ramped-turbine down IAW 1-OP-2.2, Unit stable 81% power, 778 MWe.
30, 1992 2400 Ended month with unit at 81% power, 778 MWe.
C7ERATING DAT A REPORT DOCKET NO.:
50 339 DATE: October 2, 192 CGdTACT: G. E. Kane PHokis (703) 894*?101 51RAilWG $1ATUS 1.
Un i t
- ee :................................ N or t h Anne 2 2.
R eport f rs. Peri od:........................ 5ept ember 1992
- 3. - L icensed ther mat Power (MWt ) t............
2673
- 4. -Nameplate Rating (Gross MWe).............
947 5.
Design Electrical Rating (Net MVe).......
907 6.
Qasimum Dependable Capacity (Gross MWe):..
957 7.
Danimus Dependebt s capacity (Net MWe):....
909 8.
If changes occur in Capacity Ratings (items No. 3 thru 7) since last report, give reasons:
N/A 9.
Power levet to which restricted, if eny (Net kWe):,__N/A
- 10. mensons for restrictions, if any; N/A l
This Month Y t-D Cumulative i
l
- 11. Hours in Repw Ur.9 F.riod..............................
720.0 6,5 75. 0 103,415.0 12.11 aber of Nourt Reactor was Critical...................
720.0 5,D99.3 84,835.2 13, ceac tor Reserve shut down Hours.......................
0.0 187.0
- 244.4
.14. Hours Generator 0n-Line.....................
720.0 5,029.7 a3,804.1
- 15. Unit Reserve shutdown Houra..............................
0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generat ed (MWH)..................... 2,073,940.4 13,921,172.8 225,738,305.9
(
.17. Gross E l ec t r ica' E nergy Genera t ed ( MWH ).......
J78,945.0 4,560,800.0 73,940,926.0 l
- 10. Net Electrical Energy Generated (MWH)......
645,114,0 4.329,34C.0 70,829,081.0 h.
- 19. Unit =crvicf Factor.......................
100.0%
76.5%
81.0%
- 20. Unit Avaltabit('f Factor.................................
100.0%
76.5%
81.0%
l.
- 21. Uni t Capac i t y F ac t or ( us i t.g MDC N e t ).......
98.6%
72.4%
76.1%
- 22. Uni t Capaci ty Fac tor ( using DER Net ).............
98.8%
72.6%
75.5% '
- 23. F or c ed Out age R a t e....................................
0.0%
1.4%
5.7%
- 26. $hutdowns Scheduled Over Next 6 M aths (Type, Date, and Curation of Each):_N/A i
l' l
- 25. If shu-lown at end of Report Period, estimated time of Startup:
N/A _
1.
I
- 26. Onits in fes* Status (Prior to Convercial Operation):
Forecast Achieved
!NITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL CPERATION
4 AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unit:
NA-2 Date:
Oct 2.
1992
Contact:
G.
E.
Kane Phone:
(703) 894-2101 MONTil:
September 1992 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWo-Net) 1 900 17 901 2
900 10 900 3
900 19 900 4
900 20 901 5
900 21 901 6
900 22 900 7
901 23 900 8
900 24 903 9
899 25 903 10 899 26 903 11 899 27 901 32 831 28 901 13 833 29 901 14 900 30 902 15 901 16 901 Instructions:
On this f ormat, list the average daily unit power level in MWe-Net for each day in'the reporting month.
Compute to the nearest whole megawatt.
l
s, UNIT SHUTDOWNS AND POWER REDUCTIONS
]
DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: Oct.
2, 1992 REPORT MONTH: Sep. 1992 CONTACT: G.
E.
Kane PHONE: (703) 894-2101 1
2 3
4 5
l No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective l
(hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 1
- No entry this month.
l l
3: Method 4:
1: Type 2: Reason F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data 3= Automatic Scram Entry Sheets for Licensee C= Refueling 4= Continuations Event Report (LER) File D= Regulatory Rentriction E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Othe -
5:
G2 Operational Error Exhibit H - Same Source H20ther (explain)
~
Page 1
of __1 UNIT SIIUTDGWN AND POWER REDUCTIONS Explanation Shoot Docket No.:
50-339 Report Month Septgmber Unit Name:
NA-2 Year:
1992 Date: Oct.
2.
1992
Contact:
G.
E.
Kane
- No entry this month.
I i
l l
l l
l' L
.u.
NORTil ANNA POWER STATION "IT NO.:
2 MONTil:
September SVEihBY OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Tine DA%A September 01, 1992 0000 Began month with unit at 100% power, 948 MWo.
12, 1992 0748 Commence rampdown to 90% power for TVFT and maintenance on "A"
Main Condenser Waterbox.
OC33 Unit stable at 90% power, 845 MWe.
0933 Completed TVFT satisfactorily.
1100 Removed "A" condenser waterbox from service for maintenance.
13, 1992 1459 "A" condenser waterbox returned to service, commenced ramp to 100%
power.
1621 Unit stable at 100% power, 94 / MWe,
30, 1992 2400 Endc ' month cith unit at 100% power, 948 MWo.
.