TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 4.
CIV-41*
iso. CI sys. fr. RB 60 CIV-40
- 60 CIV-34
- 60 CIV-35*
60 5.
DHV-93 check iso. DH system fr. pzr.
NA DHV-91
- 60 DHV-43 #
iso. DH sys. fr. RB sump 120 120 DHV-42 #
DHV-4# & 41#
iso. DH sys. fr. RC 120 DHV-6 #
iso. DH system from Reactor Vessel 60 DHV-5 #
60 6.
DWV-162 check iso. DW system fr. RB NA DWV-160 (A/B)*
60 7.
FWV-44 check #
iso. feedwater from RCSG-1A NA FWV-45 check #
NA FWV-43 check #
iso. feedwater from RCSG-1B NA FWV-46 check #
NA l
8.
LRV 87 & 88*
iso. H2 recombiner ports from RB NA NA l
LRV 89 & 90*
[
LRV 91 & 92*
NA LRV 93 & 94*
NA 9.
MSV-130 #(A/B)*
iso. MDT-1 from RCSG-1 A 60 l
[
l MSV-148 #(A/B)*
iso. MDT-1 from RCSG-1B 60 MSV-411 #
- iso, main steam lines from RCSG-1 A 60 MSV-412 #
- iso. main steam lines from RCSG-1 A 60 MSV-413 #
- iso. main steam lines from RCSG-1B 60 MSV-414 #
- iso. main steam lines from RCSG-1B 60
$g[0{D 2
P CRYSTAL RIVER - UNIT 3 3/46-18
TACLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) l 10.
MUV-40 (A)*
iso. MU system from RC 60 MUV-41 (A)*
60 MUV-49 (B) 60 MUV-261 iso. MU system from 60 control bleed-off MUV-260 60 MUV-259 60 MUV-258 60 MUV-253 60 MUV-163 check #
open during HPI and closed dur.
NA nor. operation MUV-25 60 MUV-164 check #
NA MUV-26 #
60 MUV-160 check #
NA MUV-23 #
60 MUV-161 check #
NA MUV-24 #
60 MUV-27 #
open dur nor, operation and closed during RB Isolation 60 11.
SWV-39 #
iso. NSCCC from AHF-IC 60 l
SWV-45 #
60 SWV-35 #
iso. NSCCC from AHF-1 A 60 SWV-41 #
60 SWV-37 #
iso. NSCCC from AHF-1B 60 SWV-43 #
60 SWV-48 #
- iso. NSCCC from MUHE-1A & IB and WDT-5 60 SWV-47 #
- 60 SWV-49 #
- 60 SWV-50 #
- 60 SWV-80 #
iso. NSCCC from RCP-1A 60 SWV-84 #
60 SWV-82 #
iso. NSCCC from RCP-lC 60 SWV-86 #
60 SWV-81 #
iso. NSCCC from RCP-ID 60 SWV-85 #
60 SWV-79 #
iso. NSCCC from RCP-1B 60 SWV-83 #
60 SWV-109 #
iso. NSCCC from DRRD-1 60 SWV-Il0 #
60 CRYSTAL RIVER - UNIT 3 3/46-19
TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 12.
WDV-4 (B) iso. WDT-4 from RB sump 60 WDV-3 (A) 60 WDV-60 (A)*
iso. WDT-4 from WDT-5 60 WDV-61 (B)*
60 WDV-94 (A) iso. WDT-4 from WDP-8 60 WDV-62 (B) 60 WDV-406 (A)*
iso. waste gas disposal from 60 vents in RC system WDV-405 (B)*
60 13.
WSV-3 iso. containment monitoring 60 l
system from RB WSV-4 60 WSV-5 60 WSV-6 60 B.
CONTAINMENT PURGE AND EXHAUST 1.
AHV-IC (A) iso. pur. sup. system fr. RB 60 AHV-ID (B) 60 AHV-1B (A) iso. pur. exhaust system fr. RB 60 AHV-1 A (B) 60 C.
MANUAL 1.
IAV-28 iso. IA from RB NA IAV-29 NA 2.
LRV-50 iso. leak rate test system fr. RB NA LRV-36 NA CRYSTAL RIVER - UNIT 3 3/4 6-20
TABLE 3.6-1 (continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)
LRV-45 iso. LR test panel from RB NA NA LRV-44 NA LRV-46 3.
MSV-146 #
iso, misc. waste storage NA tank from RCSG-1B MSV-128 #
NA l
4.
NGV-62 iso. NG system from steam NA generators NGV-81 #
NA NGV-82 iso. NG system from pzr.
NA 5.
SAV-24 iso. SA from RB NA SAV-23 & 122 NA 6.
SFV-18 iso SF system NA NA SFV-19 SFV-Il9 #
iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 #
NA 7
WSV-1 iso. containment monitoring NA system from RB NA WSV-2 D. PENETRATIONS REQUIRING TYI Z B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA CRYSTAL RIVER - UNIT 3 3/4 6-21
.