ML20102C282

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Replacing Six Manual Valves W/Eight Solenoid Operated Valves to Provide Capability to Install Hydrogen Recombiner
ML20102C282
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/27/1985
From:
FLORIDA POWER CORP.
To:
Shared Package
ML20102C276 List:
References
NUDOCS 8503050448
Download: ML20102C282 (4)


Text

...

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 4.

CIV-41*

iso. CI sys. fr. RB 60 CIV-40

  • 60 CIV-34
  • 60 CIV-35*

60 5.

DHV-93 check iso. DH system fr. pzr.

NA DHV-91

  • 60 DHV-43 #

iso. DH sys. fr. RB sump 120 120 DHV-42 #

DHV-4# & 41#

iso. DH sys. fr. RC 120 DHV-6 #

iso. DH system from Reactor Vessel 60 DHV-5 #

60 6.

DWV-162 check iso. DW system fr. RB NA DWV-160 (A/B)*

60 7.

FWV-44 check #

iso. feedwater from RCSG-1A NA FWV-45 check #

NA FWV-43 check #

iso. feedwater from RCSG-1B NA FWV-46 check #

NA l

8.

LRV 87 & 88*

iso. H2 recombiner ports from RB NA NA l

LRV 89 & 90*

[

LRV 91 & 92*

NA LRV 93 & 94*

NA 9.

MSV-130 #(A/B)*

iso. MDT-1 from RCSG-1 A 60 l

[

l MSV-148 #(A/B)*

iso. MDT-1 from RCSG-1B 60 MSV-411 #

$g[0{D 2

P CRYSTAL RIVER - UNIT 3 3/46-18

TACLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) l 10.

MUV-40 (A)*

iso. MU system from RC 60 MUV-41 (A)*

60 MUV-49 (B) 60 MUV-261 iso. MU system from 60 control bleed-off MUV-260 60 MUV-259 60 MUV-258 60 MUV-253 60 MUV-163 check #

open during HPI and closed dur.

NA nor. operation MUV-25 60 MUV-164 check #

NA MUV-26 #

60 MUV-160 check #

NA MUV-23 #

60 MUV-161 check #

NA MUV-24 #

60 MUV-27 #

open dur nor, operation and closed during RB Isolation 60 11.

SWV-39 #

iso. NSCCC from AHF-IC 60 l

SWV-45 #

60 SWV-35 #

iso. NSCCC from AHF-1 A 60 SWV-41 #

60 SWV-37 #

iso. NSCCC from AHF-1B 60 SWV-43 #

60 SWV-48 #

  • iso. NSCCC from MUHE-1A & IB and WDT-5 60 SWV-47 #
  • 60 SWV-49 #
  • 60 SWV-50 #
  • 60 SWV-80 #

iso. NSCCC from RCP-1A 60 SWV-84 #

60 SWV-82 #

iso. NSCCC from RCP-lC 60 SWV-86 #

60 SWV-81 #

iso. NSCCC from RCP-ID 60 SWV-85 #

60 SWV-79 #

iso. NSCCC from RCP-1B 60 SWV-83 #

60 SWV-109 #

iso. NSCCC from DRRD-1 60 SWV-Il0 #

60 CRYSTAL RIVER - UNIT 3 3/46-19

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 12.

WDV-4 (B) iso. WDT-4 from RB sump 60 WDV-3 (A) 60 WDV-60 (A)*

iso. WDT-4 from WDT-5 60 WDV-61 (B)*

60 WDV-94 (A) iso. WDT-4 from WDP-8 60 WDV-62 (B) 60 WDV-406 (A)*

iso. waste gas disposal from 60 vents in RC system WDV-405 (B)*

60 13.

WSV-3 iso. containment monitoring 60 l

system from RB WSV-4 60 WSV-5 60 WSV-6 60 B.

CONTAINMENT PURGE AND EXHAUST 1.

AHV-IC (A) iso. pur. sup. system fr. RB 60 AHV-ID (B) 60 AHV-1B (A) iso. pur. exhaust system fr. RB 60 AHV-1 A (B) 60 C.

MANUAL 1.

IAV-28 iso. IA from RB NA IAV-29 NA 2.

LRV-50 iso. leak rate test system fr. RB NA LRV-36 NA CRYSTAL RIVER - UNIT 3 3/4 6-20

TABLE 3.6-1 (continued)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds)

LRV-45 iso. LR test panel from RB NA NA LRV-44 NA LRV-46 3.

MSV-146 #

iso, misc. waste storage NA tank from RCSG-1B MSV-128 #

NA l

4.

NGV-62 iso. NG system from steam NA generators NGV-81 #

NA NGV-82 iso. NG system from pzr.

NA 5.

SAV-24 iso. SA from RB NA SAV-23 & 122 NA 6.

SFV-18 iso SF system NA NA SFV-19 SFV-Il9 #

iso. Fuel Transfer tubes from NA F.T. Canal SFV-120 #

NA 7

WSV-1 iso. containment monitoring NA system from RB NA WSV-2 D. PENETRATIONS REQUIRING TYI Z B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 202 NA CRYSTAL RIVER - UNIT 3 3/4 6-21

.