ML20101R549
| ML20101R549 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/31/1992 |
| From: | Kane G VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | |
| Shared Package | |
| ML20101Q859 | List: |
| References | |
| NUDOCS 9207160078 | |
| Download: ML20101R549 (3) | |
Text
.
ct.
s, vp__
fl 4
Flevised Pages for May 1992 North Anna Units 1 & 2 Monthly Operating floports
)
l 92071'60070.92071o PDR ADOCK 05000338
-R PDR p;
e
- - _ -. - - - + -. _ _ - _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ - _. _ _. _ - - _ _ _ _ _.
- ~ ~ ~
--. - -... -. -. ~.
- - - - ~ -.
OPERAllWG DATA R$MCf a
DOCKti No.:
50 335 I
DAIE: June 16, 1992 i
CONTACT: C. E. K ane PHOWE: (703) 894 2101 OPEllAf!NG STATUS 1.
Uni t Name s............................... N or t h Anna 1
- 2. R epor t i ng P e r i od s.........................May 1992
, 3.
Licensed therral Power (MWt).............
2.748 4.- Nameplate Rating (Gress MWe)t.............
947 5.
Desten tt u trical Rating (Not Mue):.......
907 6.
Mantrui Dependable Capacity (Crosa Mwe):..
B94 7.
Mexleus cependable Capacity (Nat MWe)....
848
( 3, if changes occur 1r. Capacity Ratings (Items ho. 3 thru 7) ainee lost report, give reasonas_N/A 9.. Power levet to :.hich restricted, If any (Net MWe):,,_N /A
- 10. Reasons for restrictions, If r.y N/A Thlt Month T t-D Cwutative
- 11. Cour s i n R epor t ing Per i od................................
T44.0 3,647.0 122,210.0 ih Nmter of Hours Reactor was Critical.....................
744.0 2,105.3 68,793.8
- 93. Ranc t or Reserve shutdu wn Hour s..........................
0.0 36.3 6,58.0
- 14. Itoura Generator 0n-Line..................................
744.0 2,086.2 85,0 9.7
- 15. Un i t R es e rve Shut down Jour s..............................
0.0 0.0 0.0
- 16. Gross thermal Energy Generat ed (MWH)..................... 2,041,(.39.3 5,571,074.0 zc2,521,846.4
- 17. Cross $lectrical Energy Generated (MWH)..................
676,777.0 1,844,035.0 75,101,ta2.0
- 18. Net El ectr ical Ene, gy Generat ed (MWH)....................
643,876.0 1,751,346.0 71,105,963.0
- 19. Uni t s erv i c e f ac t or............ ~.........................
100.0%
57.3% -
70.3%
l 20. Uni t Aval t abi l l ty F ac t ar.................................
100.0%
57.3%
70.3%
- 81. M t Capac i t y Fac t or (ua l ng HDC Ne t).....................
102.1%
54.2%
65.0%
- 22. Uni t Capaci ty F ac tor (us ing Dt R N e t ).....................
95.4%
52.94 64.1%
- 23. f o rc ed Ou t a g e R a t e......................'.................
0.0%
0.0%
12.0%
--26. Shutdowns Schedoted Over Nest 6 Months (Type, Date, and Duration of f ach)' None M
5 25 -If shutdown at end of Report Period, estimated time of Startup: __ N / *
' 24. Units. in Test Status (Prior to Connerclot Operation):
Forecast Achievsd IWlflAt CRlilCAllif INITIAL ELEfTklCITT CCtHERCIAL OPERATION x
-u ~..
l Q.
4 OPERA 11Nti DATA RLi C T 00CKti No.:
50 339 Daft: June 16, 1992 CONTACT: G. f. Karw PHONE: (703) ti?4 2101 OPERATING STATUS 1.
Uni t N ame t................................ N or t h Anra 2 2.
R epor t i ng Per i od s.........................May 1992 3.
L icemed thermal Power (MWt ).............
2293 6.
N amepla t e R et ing (Gross mie)s.............
947 5.
Design Electrical Rating (Net MWe)t.......
907 G.
Chalws Dependable Capacity (Gross MWe)..
957 7,
Maxitus Depinviable Capacity (Wet MWell....
909 8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since test report, ylve reasons
.N/A i-9.
Power levtl to which restricted, if arr/ (het MWe):,,_,,N/A,, _
- 10. Reasons for restrictions, if tinyt _
N/A This Month YtD Cumalat ive
- 11. H ours i n R epor t i ng Pe r i od...............................
744.0 3,647.0 100,487.0
- 12. Nwher of Hrsur s Re ac t or was cr i t i c al.....................
687.9 2,193.9 81,929.8
- 13. R eac t or R e se*ve Shut down H ours...........................
56.1 164.9 6,222.3
- 14. acurs Gener a t or 0n L i ne..................................
683 2 2,143.9 80,918.3
- 15. Ont t L us t r ye Shutdown N ov s..............................
00 0.0 0.0
- 16. Groas ' Thermal Energy Generet Hj (MWM)..................... 1,949,702.7 5,634,D8.2 217,451,891.3
- 17. tirous El ectr ical Energy Centrated (MWH)..................
642,631.0 1.80,989.0 71,225,115.0 18.' Wet Electrical Energy Ger. orated (MWH)4 611.855.0 1,749,477.0 68,249,210.0
- 19. Uni t S e rv i c e F a c t o r......................................
91.8%
58.8%
80.5%
- 20. Unit Availability Factor...........................
91.8%
56.8%
20.5%
- 21. Unit Capacity Factor (using KDC het).....................
90.5%
$2.8%
75.4 %
- 12. Unit cepacity factor (using t,tk Net).....................
90.7%
51.9%
74.9%
- 23. forced Outage Rate.......................................
0.0%
1.21.
5.9%
v 24 Shutdowns $chedAed Over West 6 Months (Type, Date, ard Ourstion of Each)t_N/A
.~.
- 25. If ShtMioun at end of Report Period, ectimated time uf Startupt N/A
- 26. Units in Test status (Frior to Cotunercial Operation):
{
Forecast Achieved INITIAL-CElVICALITY
!NiilAL ELECTRICITY COMMERCIAL OPERATION I
1
_ - -