A. OPERATING DATA REPORT Docket No: 50 - 456 s
l Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: December 1995 Gross Hours:
744
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Mr.x Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (if Any):
None
- 4) Reasons for restrictions (If Any):
None This Mo.
Yr to Date Cumulative i
- 5) Report Period Hours:
744 8760 65073 l
- 6) Hours Reactor Critical:
547.6 6379.1 50977.9
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
427.1 6214.9 50180.7
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
1,004,550 20,040,969 158,484,816 11 Gross Elect. Energy (MWH):
328,304 6,886,498 53,390,320 12 Net Elect. Energy (MWH):
307,159 6,594,540 51,127,360 13 Reactor Service Factor:
73.6 72.8 78.3 14 Reactor Availability Factor:
73.6 72.8 78.3 15 Unit Service Factor:
57.4 70.9 77.1 16 Unit Availability Factor 57.4 70.9 77.1 17 Unit Capacity Factor (MDC NET):
36.9 67.2 70.2 18 Unit Capacity Factor (DER NET):
36.9 67.2 70.2 19 Unit Forced Outage Rate:
0.0 2.9 7.7 20 Unit Forcod Outage Hours:
0.0 184.0 4214.5
)
21 Shutdown Schedule Over Next 6 Months:
22 If Shutdown at End of Reporting Period, Estimated Date of Startup: