,_
c,l
.e 2
NIAGARA M0 HAWK POWER CORPORATION 1
NINE MILE POINT NUCLEAR STATION UNIT #1 k
NARRATIVE OF OPERATING EXPERIENCE i
The station operated during the month of October 1984 with i
a Unit Availability Factor of 100.0%
and a Net Design Electrical Capacity Factor of 97.1%
There were O
challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to Warm circulating water tempera tures.
CLASS I WORK - MECHANICAL MAINTENANCE - OCTOBER 1984 WR# 29153
- 13 Rx. Bldg. Closed Loop Cooling Heat Exchanger inspected, checked for leaks, plugged tubes, WR# 28755 Air Start Solenoid on 102 D/G - replaced air start valve WR# 29235 Diesel Generator 102 - repaired fuel oil leak WR# 26237 Snubber #39-HS Tightened cylinder bolts, WRs 28115 50V Bracket for Valve 201.7 installed new tapered washer WRt 29254 Rx. Bldg. Air Lock 261' - greased fittings, tightened up screws, and cleaned dirt from door stop WR# 29731
- 11 CRD Filters - replaced filter elements WR# 29210 Emergency condenser vent valve #05 replaced packing CLASS I WORK - ELECTRICAL MAINTENANCE - OCTOBER 1984 WR# 29200 Diesel Generator 102 - Inspected the electrical circuitry for the generator start and raw water pump.
Circuit check acceptable, and diesel started properly.
WR# 29202 Post Accident Sampling - Solenoid Valve 122-04 was replaced with an equipment qualified solenoid.
WR# 29205 Reactor Building Closed Loop Cooling - #11 (70-01) motor was rewound due to a turn to turn short.
MO 1927 This major order involves updating station equipment for Equipment Qualification. The work performed includes wiring replacement solenoids, position limit switenes, dif ferential pressure transmitters and sealing the condulets.
The systems involved are Emergency Condenser Vent,* Reactor Building Emergency Ventilation, Condensate Make up to Torus, Containment Spray and Containment Spray Cooling Raw Water.
CLASS I WORK - IrLSTRUMENTATION & CONTROL - OCTOBER 1984 No Class 1, Safety Pelated, Corrective Maintenance performed this month.
8412110502 841031
{DRADOCK 05000220 PDR
1 f
_,.n.
a 5
OPERATING DATA REPORT T
DoCKETSO
~
^
DATE 11/6/84 COMPLETED liY T _.F Rnman TELEPHONE (110 349-2422 1
i OPERATING STATUS Nine Mile Point Unit il Notes
- 1. Unit Name:
October 1984, 10/1/84 - 10/31/64 i
- 2. Reporting Period:
IDDU
- 3. Licensed Thermal Power (MWr):
640
- 4. Nameplate Rating (Gross MWe):
630
- 5. Design Electrical Rating (Net MWe):
620
- 6. Maximum Dependable Capacity (Gross MWe):
610
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 71 Since Last Report. Gise Reasons:
- 9. Power Level To Which Restricted lf Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr. to.Date Cumulatise 745 7321.0 132,601.2
- 11. Hours la Reporting Period 745 5034.5 91,335.7
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
0 1204.2 745 49/1.5 88,459.8
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0
0 20.4
- 16. Gross Thermal Energy Generated (MWH) 1374.183.0 8,761,059.0 146,855,4 W. 0 17 Gross Electrical Energy Generated (MWH 461.502.0,.
2,921,940.0 48553,721.0
- 15. Net Electrical Energy Generated (MWH) 448,288.0 2.832.919.0 47.027,678.0
- 19. Unit Service Factor 100.0L 67.9 60./
100.0a 67.9 66.7
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) 98.6%
63.4 58.1
- 22. Unit Capacity Factor (Using DER Net) 97.h 62.4 57.2 0
0 1o.3
- 23. Unit Forced Outage Rat,
- 24. Shutdowns Schedcled Over Next 6 Months IType. Date.and Duration of Eacht
- 25. if Shut Down At End Of Report Period. Estimated D2:e of Startup-
- 26. Units in Test Status (Prior io Corrmercial Operation Fi. recast w :. sed INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION p3l 9
[
. a.
. 3-
+
s 4
, +: g-q-_
s
/
AVER AGE D ALLY L* NIT POh ER. LEVEL -
s.
1-
~
4 m
DOCKET No. 50 220 t3.,j9 Mile Pt. El 11/6/84
_ p g77 TW Roman- ~
- coslPLETED riy TELEPliONE h1C Mac.94pp
.j e
October 1984 ~
~
.\\t0 NTH DAY AVER ACE DAILY POWER LEVEL DAY
-AVER ACE DdlLY POWER LEVEL l.\\1h e.N er i gg w, 3,,,
590 605 i
1, 2
600 604 33 3
603
- 601 i,
4 601 603
)
,o 5
600 602 6
603 604 602 602 7
.s 601 8
601 9
601 604 10 602 605 il 601 605 601 605
,3 601 603 13
,9 1.:
601 603
,a0
- rs 600 605 3,
i6
'601 g
9 Ii INSTRUCTIONS Ort ains format. ! s the n erage dan) usur p.m er ie.et in stu t.se: :,,, c, 23 in,3,,.,,,,,,,,,.,n.,,,,,,,,,,y,,,,,
the neuest v.In,!f - f;2w2 :.
I lI! '
l f-p-
m-y.givy
,-yy-4--N
-p
- w p.-
,m-+v h
y
+.e,-
'*-wa-r+74-4 W -W
-+r+to
'*wY wi-y-
-*miyrw--
7
~ '
~
50-220 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT N AME 9 Mile Pt. #1
~~
DATE l l / M R4 October 1984 COMPLETED BY T _ W_ Roman REPORT MONill 1ELEril0NE (315)349-2422
~h
=
3m e
1,. -
5_$
5 2E'd II"5C' 5 ".
g4 Cause A Correceive s,,'
g, g '.
9
_is 5 a:
Event u7 El Action to
$3 c5 j5j RePuti "
N0 j'
Psevent Recurrence 6
I None this month e
s l
1 2
3 4
P.ns eil Reason:
Metfiosi.
Exliibit G. Instructions
~
s L l.cil..b '
A 14pnpment l'ailure f E vilain) 141anual for Preparation of Data U4taintenante.pr les:
2 Manusi Scram.'
Entey Slieces for Licensee 0 Reluchng J. Automatic Strani.
Event Repost (LER) file int! REG-4 Ollier flinplain) 0161)
D.Hegi.latiny itestritii m
! Operatus leaining A 1.icense 1.tamination I - Ailnunisitat ive 5
G Operational lies.n (Fsplamt Exliibit I Same Souwe l9/77) li Oiliceti =l. lain)
.-.x.d_i.
w m._g-x
._s-me.y ?
y e --
e.
.n. 3,
.o m
~. q.. w..
.,.,7,..
q
- )
Q. -
.f' yyp.9700
+
NIAGARA MOHAWK POWER CORPORATION NI AGAR A MOHAWK 300 Entt boulevard WEST SV R ACUSE. N V.13 202 November 9,1984
)
?
' 041ccio.1 T
Office 'of Inspection and Enforcemed
. U.S. Nacient Regulatory Commission
~ Washington, DC 20555 Attn:
Document and Control Desk Re: Docket No. 50-220 DPR-63
Dear Sir:
/
Submitted herewith is the Report of Operaling Statistics and Shutdown for Ottober 1984 for the Nine Mite Point Nuctcar Station Unit 91.
Also' included is a narrative report of Operating Experience for 0 %tber 1984 Very traly yours,
//
J e
ff Thomas E. Lempge.s -
p~
Vice P.1esided Nucleat Generation TEL/Lo y'
attachments cc: Director, Of fice of ISE (10 copics) 0?1G1U
-*[
gygED Lf0 Z
C ptifi" w
i
,