ML20100K813
| ML20100K813 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/05/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8504160090 | |
| Download: ML20100K813 (1) | |
Text
p 9
DUKE POWER GOMPAl%Y#'
D-P.O. box 33180 rs CHARLOTTE, N.C. 28242
'r HALH.TtJCKER TELEPHONE glg pie g}
poy ams31 mm== o==r January 5, J'
= = = = = =
' I3 y y f; L Mr.-James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street,.NW, Suite 2900 Atlanta, Georgia 30303 Re: McGuire Nuclear ation Docket'Nos. 50 36} 50-370
Dear Mr. O'Reilly:
This letter is a Special Report submitted as required by McGuire Nuclear Station Technical Specification 3.7.8.
Duke Power Company has a design change planned which modifies the total number of mechanical snubbers identified in the Technical Specifications.
'A description of the planned change follows.
Modification No. MG-2-0315 (Unit 2)
This modificatien deletes one mechanical snubber in the Main Feedwater (CF)
System. A reanalysis of the affected piping showed that the stresses are within acceptable values without the snubber installed.
A revision to Technical Specification 3.7.8 to reflect the above modification will be submitted with the next license amendment request.
Please advise if there are any questions regarding this matter.
Very truly yours, Hal B. Tucker GAC/php cc:
Mr. Harold R. Denton, DJrector Mr. W. T. Orders Office of Nuclear Reactor Regulation NRC Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Washington, D. C. 20555 Attention:
Ms. E. G. Adensam, Chief Licensing Branch No. 4 fER IM 8j8$8jg
'OFFICAC COPY PDR 16a0
,