ML20100D426

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-400/84-31.Corrective Actions:Reinsp of Previously Installed Instrumentation Supports Planned,Including Support for Insp Package PI-01CC-00677AS
ML20100D426
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1984
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20100D305 List:
References
CON-NRC-282 NUDOCS 8412050785
Download: ML20100D426 (2)


Text

[

g"#_

-^"

.?

cpai.

1 I

l Carolina Power & Light Company

(

27562 October 31,1984

- Mr. James P. O'Reilly NRC-282 te United States Nuclear Regulatory Comm:ss:c..

Region II ~

101 Marietta Street, Northwest (Suite 2900) i Atlanta, GA 30323

~

Dear Mr. O'Reilly:

In reference to your letter of October 2,1984, referring to Ril: GFM/RLP 50-400/84-31-02, the attached is Carolina Power and Light Company's reply to the violation identified in i

Appendix A.

It is considered that the corrective action taken/ planned is satisfactory for resolution of the item.

Thank you for your consideration in this matter.

Yours very truly, MM R. M. Parsons Project General Manager Shearon Harris Nuclear Power Plant RMP/rst -

j Attachment cc:

Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. B. C. Buckley (NRC) 8412050785 841119

$DRADOCK 05000400 PDR

$s((M

~

y r

s n-

+

~

IAttachment to CP&L Letter of Response to NRC Report Ril:

GFM/RLP 50-400/84-31 '

1; Reported Violation:

~

10 CFR.50.55 (f) (1) requires CP&L to implement the Quality Assurance Program described Lor referenced in the Preliminary Safety Report. Section 1.8.5.10 of the CP&L Quality

+

- j Assurance Program requires that measures be established and implemented to assure that Inspections are current and meet all procedural requirements.

Contrary to the above, on August 30,1984, a CP&L construction inspector failed to complete all required inspections on the support for inspection package PI-01CC-00677AS.

The inspection form TP-54 exhibit 4 was accepted and signed off without inspecting all required instrumentation hanger attributes.

This is a Severity Level V violation (Supplement II).

Denial or Admission and Reason for the Violation:

3:

~The violation is correct as stated.

The construction inspector in question was aware of the requirement for the dimensional

. check, but during the subject inspection he inadvertently failed to make the check.

Corrective Steps Taken and Results Achieved:

2:,

As a result of reffnements being made in the instrumentation installation program, it has been decided to conduct a reinspection of previously installed instrumentation supports.

The support for inspection package PI-01CC-00677AS will be reinspected as part of that

,{

effort and dispositioned accordingly.

_ Corrective Steps Taken to Avoid Further Noncompliance:

The construction inspector in question has been reminded of the need to fully address each i

' inspection attribute of the applicable _ procedures. Additional training was held with the other instrumentatsan inspectors to re-enforce the importance of each of the required j-inspection attributes.

b

. Date When Full Compliance Will Be Achieved:

Full compliance is projected to be achieved by May 1,1985.

j l

t r

.o -