ML20099E624

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-55 Re Unqualified Foxboro Modules.Initially Reported on 840817.Due to Extensive Evaluation,Next Rept Delayed Until 841116
ML20099E624
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/05/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31052-TDS, DER-84-55, NUDOCS 8411210453
Download: ML20099E624 (2)


Text

-

x e

P20$$E0 tinD Arizona Public Service Company -

ggt;0V -9 M 11:12 November 5,LGloM V Uu:

r 1984 ANPP-31052-TDS/TRB U. S. Nuclear Regulatory Commission Region V-Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-55 A 50.55(e) Potentially Reportable Deficiency Relating To Unqualified Foxboro Modules.

File:- 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30586, dated September 17, 1984 (Interim Report)

(C) ANPP-30872, dated October 17, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by November 6,1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 16, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, b

h E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two ochg 0

\\

PDR w a7 - - -

r 7-

~

~

! ' ;f-

{

Q,

]Mr.'T.W. Bishop.

DER,84-55:

Page Two.

cc:

Richard DeYoung, Director 1

Office'of Inspection and Enforcement U. S~.~_ Nuclear Regulatory Commission--

Washington,.D.

C.-

20555-

T. G. Woods,: Jr.

- :D. B. Karner

- W. E. Ide

- D.-B. Fasnacht A.-C.-Rogers L. A. Souza D. E.iFowler_

T.':D.1 hriver S

. C. N. Russo B. S. Kaplan

J. Vorees.

J. R."Bynum

.T. M. Allen

- A..C. Gehr

= W. J. Stubblefield W. G. Bingham R.~L. Patterson-R. W. Welcher

H. D. Foster.

' D. R. Hawkinson R. P. Zimmerman L._Clyde M. Woods T. J. Bloom

' Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339