ML20098D092
Text
f,
~ -
i
(* u WITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORI THE ATOMIC SAFETI AND LICENSING BOARD j
(
In the Matter of
)
)
WASHINGTON PUBLIC POWIR SUPPLY SYSTEM )
Docket No. 50-460 CPA
)
(VPPSS Nuclear Project No.1)
)
~
AFFIDAVIT OF NINA BELL STAFF INTERVENOR I, Nina Bell, having been duly sworn, do depose and say as follows:
- 1. That I am the Staff INeervencr of the Coalition for Safe Power, an officer of the organization and authorized representative in the above-captioned proceeding;
- 2. That I have discussed with Jim Lazar, an economist in the field of energy and utility issues, his appearance as a witness at the evidentiary hearing in this case;
- 3. That Mr. Lazar is the Research Director of the Northwest Conservation
(
Act Coalition and co-author of the "Model Electric Power and Conservation Plan" on which the Intervenor has relied as a basis for its assertions that power from WPPSS Nuclear Project No.1 is not needed;
- 4. That Mr. Lazar is available to provide an affidavit stating the issues on which he is conpetent to testify and the substance of the facts therein;
- 5. That Mr. Lazar has been unable to provide such an affidavit by this date due to conflicts with his schedule; and
- 6. That Mr. Lazar would testify under oath that:
- 1. There is no need for the power from WP-1 by 1991 or any l
l time thereafter;
~
i
- 2. That the cost of power from WP-1 makes it an uneconomical energy option; and
.9
(
8409270354 840824 PDR FOIA COHEN 84-603 PDR
.e$
(
- 3. Th3 N:rthwest P2w;r Planning Council doe 3 not cupport tha operation of WNP-1 prior to 1996.
(
()
ina Bell ~
Coalition for Safe Power SUBSCRIBED AND SWORN to before me this N day of M
, 1983.
/ww/s&4 Q Notary Public My Commission Expires:
l$ff
(
i J
(
~~-
,_.-,_..e.,--
g_.7._-
,_g g
._m_
c.- -
. - _ _ _. _ _. _ - -. _, _ -