Text
Commonw calth litison Compan) liraidwood Generating 5tation Route al, Ilox H 6 lira ( cs ille. II. 60107-9619 TclHibiSR2801 Febuary 7,1996 BW/96-0017 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D C. 20555-0001
Subject:
Monthly Operating Report for January 1996 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units 1 and 2, covering the period January 1,1996 through January 31,1996.
Please address any comments or questions regarding this matter to Chris Pershey at (815) 458-2801, extension 2173.
Very truly yours,
/
J
- f. Tulon tation Manager Braidwood Nuclear Station TJT/CP/dm OnCORREsFZCSTECilllW96-0017 Enclosures cc:
H. J. Miller, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident luspector - Braidwood J. L. Roman, IDNS Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS 130024 9602120352 960131 PDR ADOCK 05000456 j
7 A
p R
PDR j -
A l'mcom Comp.m3
'i \\
BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 i
i l
l A. OPERATING DATA REPORT Docket No: 50- 456 Unit: Braidwood 1 Date: 02/06/1996
)
Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: January 1996 Gross Hours:
744
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (if Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
744 744 65817
- 6) Hours Reactor Critical:
744.0 744.0 51721.9 j
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
427.1 744.0 51218.9
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2,507,423 2,507,423 163,499,661 i
11 Gross Elect. Energy (MWH):
876,281 876,281 54,266,601 l
12 Net Elect. Energy (MWH):
845,942 845,942 51,973,302 j
13 Reactor Service Factor:
100.0 100.0 78.6 14 Reactor Availability Factor:
100.0 100.0 78.6 15 Unit Service Factor:
57.4 100.0 77.8 16 Unit Availability Factor:
57.4 100.0 77.8 17 Unit Capacity Factor (MDC NET):
10l.5 101.5 70.5 18 Unit Capacity Factor (DER NET):
101.5 101.5 70.5 19 Unit Forced Outage Rate:
0.0 0.0 7.6 20 Unit Forced Outage Hours:
0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood i Date: 02/06/1996
)
Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: January 1996 Ray MWe-nel Qay MWe-net a
1) 1091 16) 1136
- 2) 1105 17) 1136
- 3) 1143
- 18) 1133
- 4) 1143
- 19) 1143
- 5) 1143
- 20) 1146
- 6) 1142
- 21) 1147
- 7) 1141
- 22) 1148
- 8) 1069 23) 1148
- 9) 1136
- 24) 1147
- 10) 1136
- 25) 1148
- 11) 1136
- 26) 1143
- 12) 1136
- 27) 1146
- 13) 1136
- 28) 1146
- 14) 1136
- 29) 1146
- 15) 1136
- 30) 1146
- 31) 1145
- l
- Due to condenser efficiency i
6 C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50-456 Unit:
Braidwood 1 Date: 02/06/96 Completed by:
Chris Pershey Telephone:
815-458-2801 REPORT PERIOD:
January 1996 LER Cause & Corrective Action h
Date Type Hours Reason Method Number System Component to Prevent Recurrence None
SUMMARY
Unit 1 entered the month of January 1996 with 100% capability and operated routinely the entire month.
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
l D.
SAFETY /REllEF VALVE OPERATIONS Docket No.:
50-456 Unit:
Braidwood 1 Date: 02/06/96 Completed by:
John Lewis Telephone:
815-458-2801 I
Valves No. & Type Fiant Date Actuated Actuation Condition Description of Event None I
I t
+
f b
i
~
0 a
0*
A. OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 02/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: January 1996 Gross Hours:
744
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (if Any):
None
- 4) Reasons for restrictions (If Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
744 744 63899
- 6) Hours Reactor Critical:
744.0 744.0 54165.4
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
744.0 744.0 53770.1
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2519358 2519358 173380557 11 Gross Elect. Energy (MWH):
869184 869184 56774971 12 Net Elect. Energy (MWH):
839165 839165 54474933 13 Reactor Service Factor:
100.0 100.0 84.8 14 Reactor Availability Factor:
100.0 100.0 84.8 15 Unit Service Factor:
100.0 100.0 84.1 16 Unit Availability Factor:
100.0 100.0 84.1 17 Unit Capacity Factor (MDC NET):
100.7 100.7 76.1 18 Unit Capacity Factor (DER NET):
100.7 100.7 76.1 19 Ur.9 Forced Outage Rate:
0.0 0.0 5.2 20 Unit Forced Outage Hours:
0.0 0.0 2947.6 21 Shutdown Schedule Over Next 6 Months: Refuel Outage - 03/16/1996 22 If Shutdown at end of Reporting Period, Estimated Date of Startup:
j e
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50- 457 Unit: Braldwood 2 Date: 02/06/1996 Completed by: Chris Pershey Telephone:- 815-458-2801 MONTH: January 1996 Qaj MWe-net Day MWe-net l
1) 1106 16) 1132
- 2) 1132
- 17) 1132
- 3) 1134
- 18) 1127
- 4) 1134
- 19) 1124
- 5) 1134
- 20) 1127
- 6) 1133
- 21) 1127
- 7) 1132
- 22) 1131
- 8) 1130
- 23) 1132
- 9) 1132
- 24) 1132
- 10) 1133
- 25) 1134
- 11) 1132
- 26) 1134
- 12) 1133
- 27) 1119 13) 1132
- 28) 1054 14) 1132
- 29) 1128
- 15) 1133
- 30) 1128
- 31) 1129 *
- Due to condenser efficiency i
C.
UNIT SHUTDOWNSIREDUCTIONG Docket No.:
50-457 Unit:
Braidwood 2 Date: 02/06/96 Completed by:
Chris Pershey Telephone:
815-458-2801 REPORT PERIOD:
January 1996 LER Cause & Corrective Action NA Dr.te Type Hours Reason Method Number System Component to Prevent Recurrence E
None l
SUMMARY
Unit 2 entered the month of Jaauary 1996 at 100% capability and opertted routinely the entire month.
t TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Fai!ure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Prt;;aration of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other 1
I
p.
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 -457 Unit:
Braidwood 2 Date: 02/06/96 Completed by:
John Lewis Telephone:
815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event k
None I
I r
)
l t