Wi C r

- 6.'

("s,;n 3' \\ ~ _ -i e,,

+

4{

2

~

~

~

+. c, g

W

~

N t

-.a u s

4

,N

sf

+

s.

n s

e

.R e

a

>g

=.-

-- s

.t.

.x, a -

s

'y f,

4.

3.-

~

\\

t t

ATTACIB1ENT.2 SERIAL: NLS-84-371 2

w

Brunswick Steam I
lectric Plant

' Proposed Technical Specification Page w

b (CP&L SERIAL:

84TSB37).

n.

a f'.-

4

)

l a-h910h297840904K 0500032y t

A P

P-(473 MAT /pgp) m-.

(BSEP-1-39)

?.. : :

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) d.

Type B and C tests shall be conducted with gas at P,,

49 psig at intervals no greater than 24 months

  • except for tests involving:

l 1.

Air locks,

'2.

Main steam line isolation valves, e.

Air locks shall be tested and demonstrated OPERABLE per Surveillance Requirement 4.6.1.3.

f.

Main steam line isolation Salves shall be leak tested at least once per 18 months.**

l g.

All test leakage rates shall be calculated using observed data

" converted to absolute values. Error analyses shall be performed to select a balanced integrated leakage measurement system.

h.

The provisions of Specification 4.0.2 are not applicable to 24 month and 40 t 10 month surveillance intervals.

  • The end of the current surveillance period for the surveillance requirements specified below may be extended beyond the time limit specified by Technical Specification 4.0.2.

After April 1, 1985, the plant shall not be operated in Operational Conditions 1, 2, or 3 until the surveillance requirements listed below have been completed. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Technica' Specification 4.6.1.2.d; as applicable to the penetrations and valves which require testing prior to April 1, 1985.

    • The end of the current surveillance period for the surveillance requirements specified below may be extended beyond the time limit specified by Technical Specification 4.0.2a.

After April 1, 1985, the plant shall not be operated in Operational Conditions 1, 2, or 3 until the surveillance requirements listed below have been completed. Upon accomplishment of the surveillances, the provisions of Technical Specification 4.0.2a shall apply.

Technical Specification 4.6.1.2.f; as applicable to main steam isolation valves B21-F022A, B21-F0228, Bil-F022C, B21-F022D, B21-F028A, B21-F0288, B21-F028C, and 821-F028D.

Amendment No.