Forwards Rev VI to Physical Security Plan,Removing All Gender Refs to Personnel.Rev Withheld
ML20096E815
Person / Time
Site: U.S. Geological Survey
Issue date: 05/13/1992
From: Danni Smith
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9205200021
Download: ML20096E815 (2)


Text

--

.~

[~ *

&& M United States Department of the Interior NNE:l=====

-1 m

GEOLOGICAL SUP\\g n

g BOX 25046 M.S.

an a

DENVER FEDERAL CENTER DENVER, COLORADO 602:5 BRANCH OF GEOCHEMISTRY n mg.mn y, May 13, 1992 Ref: Docket 50-274 U.S. Nuclear Regulatory Commission ATTN: Mr.

L.J.

Callan 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Sirs:

Enclosed is one copy of Revision VI of the Physical Security Plan for the U.S. Geological Survey TRIGA Reactor Facility. The plan was revised as permitted by 10 CFR 50.54(p) and-this - document is-submitted accordingly.

The USGS Reactor Operations Committee reviewed the changes to the Physical Security Plan and found them to not decrease the effectiveness of the plan.

The changed text areas of the plan are marked with a vertical line in the margins on the respective pages.

Explanations of the changes are:as follows, with page numbers referring to the enclosed copy.

In general, all gender references to personnel (he,- his, him, etc. )

have been removed.

1 Page 6-10, Figure 6.4, was inserted.

This -figure had been erroneously omitted from the previous version.

Page 6-12, Section 6.2.1.4, corrected the title of Assistan".

Director to Director's Representative.

Page 6-15, Sections 6.2.7 and 6.2.8, removed all-references to the Appendix and specified the designated individuals. with unlimited access.

Page 6-17, Section 6.2.10, removed the reference to the Appendix and stated that the visitors form is available from the Reactor

^

Supervisor.

w hk g

(0N-PmWma PDR

}\\\\

h

4 pa;te 6-19, Section _ 6,2.13, revised the plan acview and audit requirements to be in accordance with the Technical Specification requi'tements.

please contect Tim DeBoy, Reactor Supervisor, at (303) 236-4726 11 you have questions regarding this physical security plan revision or need further details.

Sincerely, e

"1' f,

David B. Smith Rcactor Administrator cop) to:

Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Tim Doloy, USGS, MS 424