.,4..,
^
4.
- . 4 '.
m (.
E, YIltOINIA F,LECTitIC ANI) POWEll COMI'ANY
. Ricianoun,Vistuts A 202(11 May 14, 1992 LU; S. Nuclear Regulatory Commission Serial No.92-333 Attention: Document Control Desk' NL&P/JMJ:Jmj Washington, D.C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 N PF Gentlemen:
. VIRGINIA ~ ELECTRIC - AND ' POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2
- MONTHLY - OPER ATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 forthe month of Apri 1992.
-Very truly yours, h, Q(Y h;.k.
f)>
hG W. L. dtewart Senior Vice President - Nuclear Enclosures cc:
U.S. Nuclear Regulatory Commission 101'Marietta Street, NW Suite 2900 -
Atlanta, GA ' 30323 Mr. M. S.- Lesser -
NRC Senior Resident inspector North Anna Power Staton i
'.9205190051 920430 g
'PDR--ADOCK 05o00339 R: '
PDR.
, l-?Mj ;;y.
+-
5 _
d,'d.C.
- p -
7_.
- ,. c
.+
..z _
n' y _,.
- w _'
.;:Q :;.
,".g.
5 'b,
v h -
i
-VIRGINIA POWER COMPANY NORT3 ANNA POWER ~ STATION-MONTHLY-OPERATING REPORT 4
E
' MONTH:D April _
YEAR 1992___
k i
s 3
.c Approved:
L m
stugo omnger u
(
's.
o L.
s LU'?
n
~w
.r l-OPERATING DATA REPOR1 i
DOCKET NO.:
50 338 DATE: May 4, 1992 CONTACT: G. E. Kane PHONE: (703) 894 2101 OPERATING STATUS 1.
Uni t Name s................................N or th Anna 1 2.
Report i ng Per i odt......................... Apr i l 1992 3.
Licensed Thermal Power (MWt).............
2,748 4.
Nameplats Rating (Crosa We).............
047 5.
Design Elec+rical Rating (Net MWe):.......
907 6.
Maximum Dependable Capacity (Gross We):..
894 7.
Maxisun Dependable Capacity (Ntt MWe):....
848
.6. 'If changes occur in Capacity Ratings (Items No. 3 thru 7) since test report, give reasons:_N/A 9.
Power levet to tahtch rr.*tricted, if any (Net WQ: _N/A
- 10. Reasons for restrictic:,, f any:
N/A This Month T t-D Cunulative e
11.'IMurs In Reporting Period................................
719.0 2,903.0 121,475.0
- 12. Number of Wours React or was Cr i t i ca l.....................
719.0 1,361.3 88,049.8
- 13. Reactor Reserve Shutdown Hours...........................
0.0 36.3 6,758.0
- 10. Yours Generator 0n Line..................................
719.0 1,344.2 85,115.7
- 15. Uni t R es erve shut down Hours..............................
0.0 0.0 0.0
~ 16. Cross Thermel Energy Gene ra t ed (MWH ).....,.............. 1,961,347.8 3,529,434.7 226,482,207.1
~
- 17. Eross Electrical Energy Cenerated (NWH)..................
650,184.0 1,167,258.0 74,425,105.0
- 18. Net Electrical Energy Generated (MWH)....................
617,921.0 1,107,470.0 70,462,087.0
- 19. Unit service Factor.....................................
100.0%
46.3%
70.1%
- 20. Unit Availability Factor......................
100.0%
46.3%
70.11
-21. Unit capacity Factor (using MDC Net).....................
101.3%
42.6%
64.8%
' 22. Uni t capac i ty F ac t or (us i ng DER N et ).....................
94.8%
42.1%
64.0%
- 23. F orced Out a ge R a t e.......................................
0.0%
0.0%
12.1%
- 20. shutdowns scheduled _0ver Next 6 Months (Type, Date, and Duration of Each)_None 5
- 25. If shutdown at end of Report Period, estimated time of Start @:
N/A
. 26. Units in Test Status (Prior to comnerc(at Operation):
g Forecast Achieved
' INITIAL CRITICALITY INIU 4L ELEC*RICITY
' COMMERCIAL OPERATION I
l u n - _ __
. e t
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Units NA-1 Dates May 4.
1992 Contacts
_ G.
E. Yang Phonet (703) 894-2101 MONTH:
April 1992 DAY AVERAGE DAILY POWER.
DAY AVERAGE DAILY LEVEL LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 863 17 868 2
864 18 868 3
864 19 864 4
864 20 865 5
865 21 864 6
864-22 864 7-864 23 865
-8 864 24 865 9
864 25 866 10 832 26-867 11 814 27 867 12 816 28 868 13 825 29 867 14 864 30 868 15 866 le 867 Instructions:
On this. format, list the average daily unit power level in MWe-Net for cach day in the reporting month.
Compute to the nearest
-whole megatratt.
S 1
.a
--___---------___---_O
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET FO.:
50-338-UNIT NAME:
NA-1.
c DATE: May 4,.1992 REPORT MONTH: April 1992.
CONTACT:
G.
E. Kane PHONE: {703)'894-2101
-1 2.
3-4 5
No.
Date Type' Duration Reason Method of Licensee -System Component Caase & Corrective (hrs)
' Shutting Event
- Code, Code Action to-Down Reactor Report #
Prevent Recurrence
'No entry this month.
1: Type 2: Reason
.(explain) 1= Manual Exhibit F - Instructions 3: Method 4:
F=Ferced A== Equipment Failure S= Scheduled B= Maintenance or Test-2= Manual Scram for preparation'of Data C= Refueling-3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4cContinuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 94ther G= Operational Error 5:
H=Other.(explain)
Exhibit H - Same Source
- s..,
-i']p_
y -
jy g. -.
t l4 ' l
' Y-I '.
.Page 1
- of._ 1_
f.;
e
- UNIT BRUTDOWN-AND POWER REDUCTIONS-Explanation Sheet d
Docket No,'
50-338=
Report Month Acril' Unit Names NA-1
' lear s: 1992
'Date.May 4, 1992
Contact:
'G.
E.
Kano
~
- *No entry this month.:
. ~. - - ~,
3 F
k 4
+
?
=
i 9
5 i s
1 NORTH ANNA POWER STATION UNIT NO.
1 MONTH:
April
SUMMARY
_'F OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or re.sulted in significant non-load related incidents.
Date Time Drta April 01, 1992 0000 Began month with unit at 95% power, 907MWe.
April 10, 1992 0835 Commenced unit ramp-down to 880MWe for TVFT.
0955 Commenced TVFT.
1030 TVFT completed satist'actorily.
Maintaining unit at approximately 90%
power for Ma iri Condenser waterbox inspections.
April 13, 1992 1826 Commenced unit ramp-up to 93% power for calorimetric.
1920 Calorimetric completed stafisfactorily.
Commenced unit ramp-up to full power.
2054 Unit stable at 95% power, 912MWe.
April 30, 1992 2400 Ended mont14 with unit at 95% power, 909MWo.
,=
l u,
G*.
y OPERATING DAtt. REPORT DOCKET NO.
50 339 DATE: May 4, 1992 CONTACT: G. E. Kane PHONE: (703) 894 7101 OPERATING STATUS 1.
Uni t N am, s................................ N o r th Anna 2 2.
R epor t i ng Peri od :......................... Apr i l 1992 3.-Licensed Thermal Power (MWt).............
2893 4 Nameplate Rating g M v MWe)............
947 5.
Design Electrical Rating (Net r.We):.......
907 6.
Maxinun Dependable capacity (Gross MWe',:..
957 7.. Maxinun Dependsble Capacity (Net MWe)....
909 8.
If changes occur in Capacity Ratings (Items No. 3 tnru 7) since last report, give reasors:
N/A 9.
Power level to which restricted, if any (Net MWe): _ N/A
'.0. Reasons for restrictions, if any:
N/A This Month Y t-D Cunulative
- 11. Hours in Reporting Period................................
719.0 2,903.0 99,743.0
- 12. N eber of Houri Reactor was Critical.....................
158.8 1,505.9 81,241.8
- 13. Reactor Reserve Shutdown Hours...........................
68.4 108.8 6,166.2
- 14. Hours Generator 0n-Line........................
129.5 1,460.7 80,235.1
- 15. Unit Reserve Shutdown Hours..............................
0.0 0.0 0.0
- 16. Gr?ss Thermal m.wrgy Generated (MWH).....................
253,114.4 3,685,055.5 215,502,188.6 as Electrical Energy Generated (MWH)..................
F1M.e 1,202,358.0 70,582.4.84.0 17.
- 18. N e t E l ec t r i ed 5%rgy Genera t ed (MWW)............
75,894.0 1,137,622.0 67,637,355.0
- 19. Unit Service Factor......................................
18.0%
50.3%
80.4%
- 20. Unit Availpbility Factor.................................
18.0%
50.3%
80.4%
- 21. Uni t Capaci ty Factor (us ing MDC Net ).....................
11.6%
43.1%
75.3%
- 22. Unit Capacity Factor (usIng DER Net).....................
11.6%
43.24 74.8%
- 23. Forced Outage Rate...................
0.0%
1.8%
5.9%
2$. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duratf or, of Each):_N/A
- 25. hf Shutdown at end of Repoit Perlod, es;imated time of Startup:
_ _ _h/ A 26.~ Units in Tsat Status (Prior to Comercial Operation):
Forecast Achies INITIAL CRITICALITY INITIAL ELECTRICITY CCMMERCIAL OPERATION
g_
f
._m._
~
17 'l 5mgjn U S
0
+
- - j.
'('[:(-.7,
- ~
-~
A-q -~g y
~
AVERAGE DAILY' UNIT-POWER LEVEL
~
Docket No.t 50-339 Unit NA-2 Dates May 4.
1992
Contact:
G.
E.
Kane Phones (703) 894-2101 q.'
' MONTHS, ADril"1992-T:
e c:*,,
- ly G
DAY-
-AVERAGE. DAILY' POWER DAY AVERAGE DAILY-LEVEL f
' LEVEL'(MWe-Net)
LEVEL -- (MWe-Nat) :
- h.,
- 11
'O 17 0
.J. -
~2-0 18 0
-af
'3-0-
11 9,
O
+
-4i~
0 20 0
15.-
0 21' O
+
- 6 0~
22 0
r7-0 23 0
8'
-0~
24 0
1
=9 0~
-25 76 71 0 '
O 26 203--
' 118
-0 fn
.12 -
0
~
27 425
~
28 690
'D. -
13 O'
29 866 214-0
=30 902
~
- g.a
-15i L
0-1 16 0
s N
3
-Instructions 8-
.On-this. format, listLthe-average daily unit power level in MWe-
- i
- Nat: for each day in the reporting ~ montF.
Compur.e to the nearest
- whole.regawatt.
t
.f' d5 m'
r l
I' j.
. o..
UNIT SHUTDOWNS AND POWER REDUCTIONS
.~
DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE: May'4, 1992 REPORT MONTH: April 1992 CONTACT:
E. Kane s
PHONE: (703) 894-2101 1
2 3
4 5
do.
Date Type Duration' Reason Method of Licensee System Component Cause & Corrective (itrs)
Shutting Event Code Code Action to Down Reactor Report /
Prevent Recurrence 92-03 920226 S
589.5 C
4 N/A N/A N/A Refueling in progress.
S/G maintenance and inspections ongoing.
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B=Maintenanc
^'- Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training,& License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
. ~.
_ $pj p,.
^
('
L W'
Page 1
of
_2-
-UNITISHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.t
-S0-339 _
o
. Report Month April-Unit Names NA-2 l'
-Year
__J 122_.
Date May 4, 1992 Contacts G.
E.'Kane
~ f92-03 February 26,-1992' Main ~; Generator taken off-line at 1413 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.376465e-4 months <br /> in
- preparation for: refueling outage. Unit entered Mode 3-at 1501"he s.
y February'27, 1992:
[~
Unit entered' Mode 4'at 0449 hours0.0052 days <br />0.125 hours <br />7.423942e-4 weeks <br />1.708445e-4 months <br />.
Unit entered Mode-5
'at-1930-hours.
~. March 07, J992-
-Unit entered Mode 6 at'0522-~nours.
March-14,.1992 Reactor defueled at 0640 hours0.00741 days <br />0.178 hours <br />0.00106 weeks <br />2.4352e-4 months <br />.
-March /23,;;-1992'
. Reactor fuel-: on-load commenced at 0633 ' hours.
1 Marchl 2 6,-- 1992 -
- Reactor fuelLon-load
- completed:-at 0413 hours0.00478 days <br />0.115 hours <br />6.828704e-4 weeks <br />1.571465e-4 months <br />.
April!01,l1992-
-Unit, entered - Mod.e 5 at 0920 - hours.
Pressurizer = power-
-operated relief valve, PCV-2455C, lifted and reseated in 1 response to Reactor Coolant System.NDT Overpressurization
. signal at 1119 hours0.013 days <br />0.311 hours <br />0.00185 weeks <br />4.257795e-4 months <br />. -The RCJ was in'a solid' condition with no PCPs runnincr.
-April 20,.1992-Unit: entered Mode 4:at 1253 hours0.0145 days <br />0.348 hours <br />0.00207 weeks <br />4.767665e-4 months <br />.
April'21,~1992
-. Unit ~. entered.' Mode.3 at 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br />.. Unit entered Mode P.
at 2352 hours0.0272 days <br />0.653 hours <br />0.00389 weeks <br />8.94936e-4 months <br />.
.l l
., u
_s l
i Page 2
cf 2
UN1T SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 April 22, 1992 Entared T.S.
Actiori Jtatement 3.1.3.2 at 1540 hours0.0178 days <br />0.428 hours <br />0.00255 weeks <br />5.8597e-4 months <br /> due-to IRPI K-8 failing low.
Determined rod K-8 is dropped at 1715
- hours, and entered r'oropriate abnormal procedure.
Commenced reactor sht..swn at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />.
Unit entered Mode 3 at 203i hours.
April 23, 1992 Unit entered Mode 4 at 0408 hours0.00472 days <br />0.113 hours <br />6.746032e-4 weeks <br />1.55244e-4 months <br />.
Unit entered Mode 5 at 0820 hours0.00949 days <br />0.228 hours <br />0.00136 weeks <br />3.1201e-4 months <br />.
April 24, 1992 Unit entered Mode 4 at 0816 hours0.00944 days <br />0.227 hours <br />0.00135 weeks <br />3.10488e-4 months <br />.
Unit entered Mode 3 at 1818 hours0.021 days <br />0.505 hours <br />0.00301 weeks <br />6.91749e-4 months <br />.
April 25, 1992 Unit entered Mode 2 at 0551 hours0.00638 days <br />0.153 hours <br />9.11045e-4 weeks <br />2.096555e-4 months <br />.
Unit entered Mode 1 at 1240 hours0.0144 days <br />0.344 hours <br />0.00205 weeks <br />4.7182e-4 months <br />.
Main Generator placed on line at 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> and experienced turbine trip due to antimotoring alarm at 1326 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.04543e-4 months <br />.
Main Generator placed on-line at 1431 hours0.0166 days <br />0.398 hours <br />0.00237 weeks <br />5.444955e-4 months <br />.
Unit stable at 30% power for Chemistry hold at 1753 hours0.0203 days <br />0.487 hours <br />0.0029 weeks <br />6.670165e-4 months <br />.
April 27, 1992 Cleared Chemistry hold and commenced unit ramp-up at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br />.
1 April 30, 1992 Unit stabla at 99% pcwer, 947MWe, with all turbine valves full open at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />.
?;
..y
- l
.~
NORTH ANNA POWER-STATIOd-s
- UFiT-NO. -
-2
.l MOMTH:
ADril.
S'UMMARY OF OPERATING EXPERIENCE Page 1 of_2 Listed below in chronological sequence.is a
summary of operating experiences for-this month which-required load reductions or resu.'ted:in significant non-lcad related incidents.
Date Time Data April 01, 1992 0000 Began month with unit in Mode 6.
0970 Unit ent'r'd Mode 5.-
-April 14, 1992 1119 Pressurizer - power operated relief valve,-
PCV-2455C, lifted and reseated in response _to Reactor Coolant
_ System
-NDT Overpressurization signal.
The RCS was in a solid condition with no RCPs running.
-April'20, 1992 1253 Unit entered Mode 4.
April 21, 1992 0320 Unit entered Mode 3.
2352 Unit entered Mode 2.
April:22, 1992 1540 Entered T.S.
Action Statement 3.1.3.2 due to IRPI K-8 failing low.
1715 Investigation determined rod K-8 is dropped.
_ Entered-appropriate abnormal operating procedure.-
2030 Commenced reactor shutdown.-
2031 Unit entered-Mode 3 in preparation for repairs to rod control for K-8.
AprilD23, 1992 0408
' Unit-entered Mode 4.=
r-0820 Unit entered Mode 5.-
L
-April 24, 1992 0816-Unit entered Mode 4 following repair of rod control for K-8.
1818
' Unit entered Mode 3.
April 25, 1992 0551 Unit enterad Mode 2.
1045 Placed Main Turbine on-line -and L
experienced turbine trip due to-low L
oil pressure when 2-TM-P-1 was secured.
.~
NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:.
_ April
SUMMARY
OF OPERATING EXPERIENCE Page 2 of 2 April 25, 1992 1133 Placed Main Turbine on-line and (continued) experienced turbine trip due to low oil pressure when 2-TM-P-1 was secured.
1240 Unit entered Mode 1.
1325 Main generator placed on-line.
1326 Experienced turbine trip due to antimotoring alarm.
1431 Main generator placed on-line at a higher load rate.
1753 Unit stable at approximately 30%
power for Chemistry hold.
April 27, 1992 0530 Cleared Chemistry hold.
Commenced unit ramp-up at 4%/ hour.
April 29, 1992 0352 Unit stable at 98% power per delta T indication.
A
-1549
" e.lta T and Tavg adjustments in progress.
1751 Commenced unit ramp-up to full power after adjustments.
April 30, 1992 2200 Unit stable at 99% power, 947MWe, with all turbine valves full open.
2400 Ended month with unit at 99% power, 949MWe.
l
-