ML20094H360
| ML20094H360 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 10/31/1995 |
| From: | Saunders R, Stall J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 95-580, NUDOCS 9511140138 | |
| Download: ML20094H360 (12) | |
Text
. _. -
. =..
VIRGINIA ELECTRIC AND Powen COMI'ANY RICIIMOND,VIROINIA 200 61 November 8,1995 4
i U. S. Nuclear Regulatory Commission Serial No.95-580 Attention: Document Control Desk NL&OS/JHUCMC Washington, D.C. 20555 Docket Nos.
50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the October 1995 Monthly Operating Report for North Anna Power Station Units 1 and 2.
Very truly yours, R. F. Saunders Vice President-Nuclear Operations Enclosure cc:
U.S. Nuclear Regulatory Commission Region ll 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 j
Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station
.<.4 i
s i i V '_ e1 951114o138 951031 PDR ADOCK 0500o338
/
l R
PDR l
. ~..
. ~.
4 i
j i
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT 1
1 MONTH:
October YEAR:
1995 1
l l
1 l
I l
l l
I f
Approved:
Oh ELL' pT stauon Manager m
OPERATING DATA REPORT DOCKET NO.:
50-338 DATE: November 5, 1995 CONTACT: J. A. Stall PHONE: (703) 894-2101 OPERATING STATUS 1.
Unit Name:................................ North Anna 1 2.
R eport i ng Per i od:........................ 0c t ober 1995 3.
Licensed Thermal Power (MWt):.............
2,893 4.
Nameplate Rating (Gross MWe):.............
994 5.
Design Electrical Rating (Net MWe):.......
907 6.
Maximum Dependable capacity (Gross MWe):..
940 7.
Maxiran Dependable Capacity (Net MWe):....
893 8.
If changes occur in capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): _N /A
- 10. Reasons for restrictions, if any:
N/A This Month Y t-D Cumulative
- 11. Hours i n R eport i ng Per i od.................................
745.0 7,296.0 152,172.0
- 12. Nunber of Hours Reactor was Cr i t ical......................
745.0 7,274.6 115,722.4
- 13. R: actor Reserve Shutdown Hours............................
0.0 20.9 6,951.4 it. Hours Generator 0n-Line...................................
745.0 7,269.8 112,723.5
- 15. Unit Reserve Shutdown Hours...............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH )...................... 2,154,437.2 20,960,264.4 301,145,844.3
- 17. Gross Electrical Energy Generated (MWH)...................
706,678.0 6,878,827.0 98,954,447.0
- 18. nit Electrical Energy Generated (MWH).....................
671,999.0 6,541,165.0 93,743,451.0
- 19. Unit Service Factor.......................................
100.0%
99.6%
74.1%
- 20. Unit Availability Factor..................................
100.0%
99.6%
74.1%
- 21. Unit Capacity Factor (using MDC Net)......................
101.0%
99.9%
68.9%
- 22. Uni t Capaci ty Fact or (using DER Net)......................
99.5%
98.8%
67.9%
- 23. Ftrced Outage Rate........................................
0.0%
0.4%
9.4%
- 25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):_ Refueling Outage Scheduled far February 10, 1995, Duration 34 Days
- 25. If Shutdown at end of Report Period, estimated time of Startup: _N/A
- 26. Units in Test Status (Prior to Connercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
l AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 l
Unit:
NA-1 Date:
November 5, 1995 Contact J. A. Stall Phone:
(703) 894-2101 l
l MONTH: October 1995 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) t -
1 902 17 904 l
2 902 18 905 l
3 901 19 901 l
4 901 20 902 5
901 21 902 6
901 22 901 7
901 23 901 8
901 24 901 9
902 25 902 10 904 26 901 11 904 27 894 12 904 28 903 13 904 29 902 14 904 30 902 15 905 31 902 16 903 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt,
NORTH ANNA POWER STATION i
UNIT NO.s 1
MONTH:
October
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a
summary of operating i
experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data i
October 01, 1995 0000 Began month with unit at 100% power, 948 MWe.
October 27, 1995 0918 Commenced power reduction from 100%, 948 MWe for Turbine Valve Freedom Test (TVFT).
1004 Unit stable at 93% power, 875 MWe for TVFT.
1111 Completed TVFT satisfactorily.
1133 Commenced ramp up to 100% power from 92% power, 873 MWe, 1245 Unit stable at 100% power, 944 MWe.
October 31, 1995 2400 Ended month with unit at 100% power, 947 MWe.
1 i
Page 1
of __1 i
UNIT SHUTDOWN AND POWER REDUCTIONS i
Explanation Sheet I
Docket No.:
50-338 Report Month October Unit Name:
NA-1 Years 1995 Date: November 5, 1995
Contact:
J.
A.
Stall No entry this month.
i 1
l l
i i
i l
l l
l.
l i
L 4
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-338 UNIT NAME:
NA-1, DATE: November 5, 1995 REPORT MONTH: October 1 1995 CONTACT: J. A.
Stall PHONE: (703) 894-2101 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence No Entry This Month o
1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
OPERATING DATA REPORT l
DOCKET Wo.:
50-339 DATE: November 5,1995 J
CONTACT:
J. A. Stall PHONE: (703) 894-2101 i
l i
OPERATING STATUS 1.
Unit Name:................................ North Anna 2 2.
Repor t i ng Per i od:........................ 0ctober 1995 3.
Licensed Thermal Power (MWt).............
2893 4.
Nameplate Rating (Gross MWe):.............
979 5.
Design Electrical Rating (Net MWe):.......
907 6.
Maximun Dependable Capacity (Gross MWe):..
944 7.
Maximum Dependable Capacity (Net MWe):....
897 j
i 8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A
)
9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. R;csons for restrictions, if any:
N/A l
This Month Y-t D Cumulative i
- 11. Hours i n R eport i ng Per i od.................................
745.0 7,296.0 130,440.0
- 12. Number of H ours R eactor was Cri t i cal......................
745.0 5,685.7 108,619.2 j
- 13. R actor Reserve Shutdown Hours............................
0.0 1.3 6,510.2 l
- 14. H our s Generat or 0n-L i ne...................................
745.0 5,653.9 107,489.6
- 15. Unit Reserve Sherdown Hours...............................
0.0 0.0 0.0
- 16. Gross The rmal Energy Generat ed (MWH)..................... 2,149,192.2 15,236,340.1 291,852,304.1
- 17. Gross E lectri cal Energy Generat ed (MWH)...................
708,837.0 4,993,762.0 95,470,619.0
- 18. N;t E lect ri cal Energy Generat ed (MWH).....................
674,144.0 4,735,B81.0 91,275,849.0
- 19. Unit Service Factor.......................................
100.0%
77.5%
82.4%
- 20. Unit Availability Factor..................................
100.0%
77.5%
82.4%
- 21. Unit Capacity Factor (using MDC Net)......................
100.9%
72.8%
77.8%
- 22. Uni t capaci ty Factor (us i ng DER Net )......................
99.8%
71.6%
77.2%
- 23. Fcreed Outage Rate........................................
0.0%
0.0%
4.9%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A j
i l
i
- 25. If Shutdown at end of Report Period, estimated time of Startup:
N/A
]
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
]
INITIAL ELECTRICITY COMMERCIAL OPERATION
. =..
t c
AVERAGE DAILY UNIT POWER LEVEL i
i Docket No.:
50-339 L
Unit:
NA-2 l
Dates November 5, 1995 i
Contact J.
A. Stall Phone:
(703) 894-2101 l
l i
I l
MONTH: October 1995 f
i f
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 910 17 906 2
909 18 907 3
908 19 909 4
908 20 909 5
908 21 909 6
841 22 909 l
7 884 23 909 l
l 8
907 24 909 l
9 906 25 910 10 905 26 909 11 905 27 909 12 904 28 910 13 905 29 910 i
14 905 30 910 l
15 906 31 911 l
16 905 i
1 i
Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
4 1
l l
i
. NORTH ANNA POWER STATION UNIT NO.:
2 MONTH:
October
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1
~
Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data October 01, 1995 0000 Began month with unit stable at 100% power, 954 MWe.
October 06, 1995 0738 Commenced unit ramp down for Turbine Valve Freedom Test (TVFT) from 100% power, 946 MWe.
0809 Unit stable at 90% power, 862 MWe, 0900 Completed TVFT satisfactorily.
Holding power at 90% for Condenser Waterbox inspections.
October 07, 1995 0418 Commenced unit ramp. following "A"
Condenser Waterbox maintenance from 90% power, 854 Mwe.
One tube was plugged.
I i
l 0517 Stopped ramp at 98%
- power, 924 Mwe for calorimetric.
l 0625 Commenced ramp to 100% power.
I 0647 Unit stable at 100% power, 947 Mwe.
j l
October 31, 1995 2400 Ended month with unit stable at 100% power, l
959 Mwe.
l l
l i
I
.. ~...
~...
Page 1
of 1
UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:
50-339 Report Month October Unit Names NA-2 Year 1995 Date November 5, 1995
Contact:
J.
A.
Stall No Entry This Month F
l t
I r
t e
t i
l L
f i
- i L'
DOCKET NO.:
50-339-UNIT NAME:
- N A - 2'.
DATE: November 5, 1995
[
REPORT MONTH: October 1 1995 CONTACT: J. A. Stal-1 PHONE: (703) 894-2101' r
i 1
2 3
4 5
i Mo.
Date Type Duration Reason Method of Licensee System-Component Cause & Corrective (hrs)
Shutting Event Code Code
' Action-to Down Reactor Report #
Prevent Recurrence ONo Entry This Month r
1: Type 2: Reason 3: Method.
4:
I F= Forced A= Equipment Failure (explain)-
1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data' 2
C= Refueling 3= Automatic Scram-Entry Sheets for Licensee {
D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
(
F= Administrative 9=Other G= Operational Error 5:
H=Other (explain)
Exhibit H
.Same Source 5
i
.